Federal Awards · M. C. DEAN, INC. · Award

SUPPLY FANS SF-16/17 FREE SPIN DUE TO CPH POSITIVE PRESSURE, LEAKING BUILDING AIR. INSTALLING BACKDRAFT DAM…

Award details are derived from public USAspending.gov records linked to this contractor. Not a bid recommendation.

Award details

Award ID
W912DR21C0023
Awarding agency
Department of Defense
Sub-agency / office
Department of the Army
Award amount
$207,386,318
Period of performance
Sep 30, 2021 – Jan 17, 2027
NAICS
238210 — Electrical Contractors and Other Wiring Installation Contractors
Place of performance
AURORA, CO, 800101476, USA
Competition
FULL AND OPEN COMPETITION · Set-aside: NO SET ASIDE USED. · 2 offers
Pricing
FIRM FIXED PRICE
Financial breakdown
Current value $211,612,628 · Obligated $211,612,628 · Potential value $212,092,628 · Latest action obligation $14,290 · Outlays $20,234,284

Public award description

SUPPLY FANS SF-16/17 FREE SPIN DUE TO CPH POSITIVE PRESSURE, LEAKING BUILDING AIR. INSTALLING BACKDRAFT DAMPERS (UP TO 5 INCHES WG) WITH BLADE STOPS WILL STOP REVERSE AIRFLOW AND MINIMIZE PRESSURE LOSS.

Most recent · Modification A00114 · Jul 1, 2026 · $14,290 action obligation · SUPPLY FANS SF-16/17 FREE SPIN DUE TO CPH POSITIVE PRESSURE, LEAKING BUILDING AIR. INSTALLING BACKDRAFT DAMPERS (UP TO 5 INCHES WG) WITH BLADE STOPS WILL STOP REVERSE AIRFLOW AND MINIMIZE PRESSURE LOSS. · W912DR21C0023

Modification A00113 · Jun 29, 2026 · $187,703 action obligation · INSTALL TWO HMIS AT LC-L/Q. REPLACE LC-G/H DOORS, INSTALL THREE SEL 751 RELAYS (USING GFE MODULE), AND REPLACE THE 24VDC UPS. · W912DR21C0023

Modification A00112 · Jun 18, 2026 · $77,975 action obligation · THE EXISTING LOAD CENTER J (LC-J) CONTROL PANEL IS OBSOLETE AND REQUIRES MANUAL, ON-SITE BREAKER OPERATION. TO RESOLVE THIS, THE GOVERNMENT CONCURRED WITH PROCURING AND PROGRAMMING A MODERN REPLACEMENT PANEL TO ENABLE REMOTE OPERATION. · W912DR21C0023

Modification A00111 · May 15, 2026 · $83,895 action obligation · PER OSHA 29 CFR 1910.212(A)(1), INSTALL GUARDS ON THE EIGHT (8) SUPPLY FANS ON THE CPH MEZZANINE. THE GUARDS SHALL BE CUSTOM-FABRICATED BY THE FANS DISTRIBUTOR TO ACCOUNT FOR THEIR SPECIFIC SIZE. · W912DR21C0023

Modification A00110 · May 6, 2026 · $35,094 action obligation · THE AHJ HAS DETERMINED THAT THE CONTRACTOR SHALL INSTALL THE SHUNT TRIP DEVICE ON THE AC BREAKERS FEEDING THE BATTERY CHARGERS PER UFC 3-520-05 SECTION 2-6.1 THAT IS NOT SHOWN IN THE ISSUED FOR CONSTRUCTION DOCUMENTS. · W912DR21C0023

Modification A00109 · May 4, 2026 · $0 action obligation · THE AHJ HAS DETERMINED THAT THE CONTRACTOR SHALL INSTALL THE SHUNT TRIP DEVICE ON THE AC BREAKERS FEEDING THE BATTERY CHARGERS PER UFC 3-520-05 SECTION 2-6.1 THAT IS NOT SHOWN IN THE ISSUED FOR CONSTRUCTION DOCUMENTS. · W912DR21C0023

Modification A00108 · Apr 23, 2026 · $128,953 action obligation · THE AHJ HAS DETERMINED THAT THE CONTRACTOR SHALL INSTALL THE SHUNT TRIP DEVICE ON THE AC BREAKERS FEEDING THE BATTERY CHARGERS PER UFC 3-520-05 SECTION 2-6.1 THAT IS NOT SHOWN IN THE ISSUED FOR CONSTRUCTION DOCUMENTS. · W912DR21C0023

Modification A00107 · Apr 21, 2026 · $56,468 action obligation · THE AHJ HAS DETERMINED THAT THE CONTRACTOR SHALL INSTALL THE SHUNT TRIP DEVICE ON THE AC BREAKERS FEEDING THE BATTERY CHARGERS PER UFC 3-520-05 SECTION 2-6.1 THAT IS NOT SHOWN IN THE ISSUED FOR CONSTRUCTION DOCUMENTS. · W912DR21C0023

Modification A00106 · Apr 14, 2026 · $115,924 action obligation · R00127-1 DAY TANK VENTING · W912DR21C0023

Modification P00020 · Apr 13, 2026 · $333,550 action obligation · R00127-1 DAY TANK VENTING · W912DR21C0023

Modification A00105 · Apr 3, 2026 · $35,502 action obligation · TO MITIGATE RISK TO THE USERS FACILITY/EQUIPMENT, INTEGRATE LOAD CENTER LC-B494-15B PRIOR TO LC-B494-15A. THIS REQUIRES MODIFICATION OF THE SEL NETWORK SEQUENCE AND SCHWEITZER RELAYS TO ENSURE THAT LC-B494-15B IS INTEGRATED BEFORE LC-B494-15A. · W912DR21C0023

Modification P00019 · Apr 2, 2026 · $894,036 action obligation · INSTALL A 1/4-INCH PRESSURE-REDUCING VALVE TO REGULATE INLET PRESSURE TO THE DOSING CABINET SOLENOID VALVE AT 3-5 PSI. SET BACK-PRESSURE REGULATOR FULLY OPEN, CLOSE THE BYPASS TO MAINTAIN STEADY HEADER PRESSURE, AND CONTINUE VETTING REMAINING SYSTEM · W912DR21C0023

Modification P00018 · Apr 1, 2026 · $0 action obligation · INSTALL A 1/4-INCH PRESSURE-REDUCING VALVE TO REGULATE INLET PRESSURE TO THE DOSING CABINET SOLENOID VALVE AT 3-5 PSI. SET BACK-PRESSURE REGULATOR FULLY OPEN, CLOSE THE BYPASS TO MAINTAIN STEADY HEADER PRESSURE, AND CONTINUE VETTING REMAINING SYSTEM · W912DR21C0023

Modification A00104 · Mar 5, 2026 · $24,038 action obligation · INSTALL A 1/4-INCH PRESSURE-REDUCING VALVE TO REGULATE INLET PRESSURE TO THE DOSING CABINET SOLENOID VALVE AT 3-5 PSI. SET BACK-PRESSURE REGULATOR FULLY OPEN, CLOSE THE BYPASS TO MAINTAIN STEADY HEADER PRESSURE, AND CONTINUE VETTING REMAINING SYSTEM · W912DR21C0023

Modification A00103 · Feb 24, 2026 · $261,357 action obligation · BUILDING 494 VALVES REQUIRE 120V POWER AND IS NOT SHOWN WITHIN IFC. THIS CHANGE ADDS THE 120 VAC POWER TO THE VALVES WITHIN BUILDING 494 TO HAVE A WORKING SYSTEM. THE VALVE POWER SHALL RUN ALONG THE CONTROL WIRING THAT WAS OUTLINED WITHIN THE IFC. · W912DR21C0023

Modification A00102 · Jan 12, 2026 · $35,997 action obligation · ADDITION OF REDUNDANT FEED UTILIZING CHANGE OF POWER SOURCE AND PULLING THE CABLES TO THIS NEW FEED. THIS IS NECESSARY AS THE HMI FOR LOAD CENTER J REQUIRES TWO SEPARATE POWER SOURCES, BUT IFC DRAWINGS SHOW TWO PANELS FED FROM ONE POWER SOURCE. · W912DR21C0023

Modification A00101 · Jan 5, 2026 · $85,370 action obligation · SITE STANDARDS REQUIRE REDUNDANT POWER FED TO PLCS AT TFP-B494-01A/02A, BUT THERE IS NONE IN THE IFC DRAWINGS. REDUNDANT TECH POWER SOURCES FOR PLCS AT TFP-B494-01A/02A SHALL BE INSTALLED FROM TECH POWER PANEL CIRCUITS TPP-AA4:36 AND TPP-AB4:36. · W912DR21C0023

Modification A00100 · Nov 14, 2025 · $38,704 action obligation · CD-ADF-C, RECAP #3, BUCKLEY SFB, CO R00109 LOAD BANK TIE-IN BREAKER AT PPMV · W912DR21C0023

Modification A00099 · Oct 28, 2025 · $35,349 action obligation · CD - ADF-C RECAP #3, BUCKLEY SPACE FORCE BASE R00108 MVS-PPMV-15A&B DC POWER · W912DR21C0023

Modification A00098 · Oct 28, 2025 · $67,281 action obligation · CD - ADF-C RECAP #3, BUCKLEY SPACE FORCE BASE R001112 69 MILCON RACKS & PDC WALKWAYS GROUNDING · W912DR21C0023

Modification A00097 · Oct 24, 2025 · $92,130 action obligation · CD-ADF-C RECAP #3, BUCKLEY SFB, CO R00098 REVISIONS TO 69 MILCON TRANSFORMERS E AND W · W912DR21C0023

Modification A00096 · Sep 29, 2025 · $99,876 action obligation · CD - ADF-C RECAP #3, BUCKLEY SFB, CO R00110 CONDUCTORS TO FOP-PPMV-09&-10 · W912DR21C0023

Modification A00095 · Sep 15, 2025 · $0 action obligation · CD - ADF-C RECAP #3 BUCKLEY SFB, CO R00103-1 CORRECTION TO R00103/A000094 EXTEND GOV OC TRAILERS MODIFICATION · W912DR21C0023

Modification A00094 · Sep 12, 2025 · $227,450 action obligation · CD - ADF-C RECAP #3, BUCKLEY SFB, CO R00103 EXTEND GOV OC TRAILERS · W912DR21C0023

Modification A00093 · Aug 25, 2025 · $71,576 action obligation · CD - ADF-C RECAP #3, BUCKLEY SFB, CO R00101 LC-12-1 AND 12-2 ON GEN SIGNAL TO UPS · W912DR21C0023

Source: USAspending.gov

Find out who's winning similar federal contracts

Discover comparable awards, related contractors, and agency purchasing history.

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.