Federal Awards · AMES CONSTRUCTION, INC. · Award

(R-062) ADJUST THE ESTIMATED QUANTITIES TO FINAL QUANTITIES FOR CLIN 0017AC BEDDING B1 OVER 2,600 CY, CLIN…

Award details are derived from public USAspending.gov records. Not a bid recommendation.

Award details

Award ID
W912ES17C0003
Contractor
AMES CONSTRUCTION, INC.
Awarding agency
Department of Defense
Sub-agency / office
Department of the Army
Funding agency
Corps of Engineers - Civil Works
Award amount
$55,553,414
Period of performance
Dec 6, 2016 – Oct 27, 2025
NAICS
237990 — Other Heavy and Civil Engineering Construction
Place of performance
FARGO, ND, 581024664, USA
Competition
FULL AND OPEN COMPETITION · Set-aside: NO SET ASIDE USED. · 7 offers
Pricing
FIRM FIXED PRICE
Financial breakdown
Current value $55,666,964 · Obligated $55,666,964 · Potential value $55,817,964 · Latest action obligation $103,893

Public award description

(R-062) ADJUST THE ESTIMATED QUANTITIES TO FINAL QUANTITIES FOR CLIN 0017AC BEDDING B1 OVER 2,600 CY, CLIN 0021 GEOTEXTILE TYPE 2, CLIN 0025 SEEDING; AND TO RECOVER OVERPAYMENT ON MULTIPLE CLINS.

Most recent · Modification A00029 · Jul 2, 2026 · $103,893 action obligation · (R-062) ADJUST THE ESTIMATED QUANTITIES TO FINAL QUANTITIES FOR CLIN 0017AC BEDDING B1 OVER 2,600 CY, CLIN 0021 GEOTEXTILE TYPE 2, CLIN 0025 SEEDING; AND TO RECOVER OVERPAYMENT ON MULTIPLE CLINS. · W912ES17C0003

Modification A00028 · Jun 18, 2026 · $0 action obligation · (R-063) EXTEND THE CONTRACTOR COMPLETION DATE BY 220 DAYS FOR COMPLETION OF ADMINISTRATIVE REQUIREMENTS RELATED TO CLOSEOUT. · W912ES17C0003

Modification A00027 · Sep 18, 2025 · $6,439 action obligation · (R-061) CORRECT THE FLOW CALCULATION EQUATION FOR THE PLC SYSTEM. · W912ES17C0003

Modification A00026 · Jun 18, 2025 · $371,573 action obligation · (R-058) REPLACE LIGHT POLES REPLACE COMMUNICATION CABLING RUN NEW CONDUIT TO THE MECHANICAL ADD LOW FLOW RADAR AND WIRE WEIGHT MOUNT ADD A WIND SENSOR TOWER AND TOWER FOUNDATION. (R-060) RECONFIGURE THE PLC/HMI SYSTEM AND REPLACE EXPANSION JOINTS. · W912ES17C0003

Modification P00011 · Apr 2, 2025 · $1,297,129 action obligation · THIS CONTRACT IS MODIFIED TO: USE A HELICAL GEAR (PARALLEL SHAFT REDUCER) INSTEAD OF THE WORM GEAR ORIGINALLY SPECIFIED IN THE CONTRACT FOR THE MACHINERY HOISTING EQUIPMENT. · W912ES17C0003

Modification A00025 · Sep 25, 2024 · $55,666 action obligation · INCREASE THE CONTRACT QUANTITY TO A FINAL QUANTITY FOR CLIN 0028AB STEEL H-PILE (HP 14X73) AND 0029 STEEL SHEETPILE. · W912ES17C0003

Modification A00024 · Apr 18, 2024 · $8,024 action obligation · ADD A PLC MANUAL OVERRIDE OPTION ADJUST THE SAFETY CHAIN HEIGHT REMOVE THE DESIGN IMPACT LOAD FOR THE CONCRETE BARRIER EMBED DOOR ADD COMPRESSIBLE JOINT FILLER TO THE CONCRETE BARRIER. · W912ES17C0003

Modification P00010 · Sep 27, 2023 · $1,151,655 action obligation · PT BAR FIX. · W912ES17C0003

Modification A00023 · Sep 12, 2023 · $158,917 action obligation · (R-51) CHANGE THE SIZE OF THE STAIR PLATFORM CHANNEL. (R-54) ADD WATERSTOPS. (R-55) COMPENSATE THE CONTRACTOR FOR IMPACT COSTS ASSOCIATED WITH THE STOP WORK ORDER RELATED TO WELDS ON THE TAINTER GATE. · W912ES17C0003

Modification A00022 · Aug 2, 2023 · $0 action obligation · THIS CONTRACT IS MODIFIED TO (1) EXTEND THE CONTRACT COMPLETION DATE BY 18 CALENDAR DAYS TO ACCOUNT FOR DELAYS, IMPACTS AND INEFFICIENCIES ASSOCIATED WITH A STOP WORK ORDER ON THE GATES (2) EXTEND THE CONTRACT COMPLETION DATE BY 40 CALENDAR DAYS TO ACCOUNT FOR CONTRACT COMPLETION ACTIVITIES. · W912ES17C0003

Modification A00021 · Jun 23, 2023 · $0 action obligation · THIS CONTRACT IS MODIFIED TO: EXTEND THE CONTRACT COMPLETION DATE BY 41 DAYS TO ACCOUNT FOR DELAYS, IMPACTS AND INEFFICIENCIES ASSOCIATED WITH CHANGING THE PT BAR MANUFACTURER · W912ES17C0003

Modification A00020 · Dec 19, 2022 · $34,990 action obligation · THIS CONTRACT IS MODIFIED TO: REVISE THE MATERIAL USED FOR THE SILL BEAM AND SIDE SEAL AND BUMPER PLATE SECONDARY PLACEMENTS FROM GROUT TO A 7000 PSI CONCRETE MIX AND CHANGES THE SEED MIXES TO MNDOT STANDARD SEED MIXES. · W912ES17C0003

Modification A00019 · Nov 7, 2022 · $355,126 action obligation · THIS CONTRACT IS MODIFIED TO: (1) INSTALL A UTILITY CROSSING (R-46) (2) INSTALL A TAINTER GATE OPENING GAGE (R-46) (3) REMOVE THE BARB WIRE ON THE SECURITY FENCE (R-46) (4) CLARIFY THE TRUNNION PIN STATIONING (R-46) (5) ADD ASPHALT PAVING TO THE CONTROL BUILDING PARKING LOT (R-48) REVISE THE ROOF SILL ELEVATION OF THE GATE WELL (R-48). · W912ES17C0003

Modification A00018 · Sep 23, 2022 · $266,094 action obligation · THE CONTRACT IS MODIFIED TO: PROCURE 88 EACH LONGITUDINAL POST TENSIONED 1-3/4 INCH BAR. SUBMIT CERTIFICATIONS DOCUMENTING COMPLIANCE WITH ASTM A722. · W912ES17C0003

Modification A00017 · Jun 30, 2022 · $1,642 action obligation · THIS CONTRACT IS MODIFIED TO: REVISE THE EXTERIOR LIGHT TEMPERATURE, REMOVE PROXIMITY SWICHES, RACEWAY AND CONDUCTORS, MAKE NUMEROUS MISCELLANEOUS CHANGES TO THE VSB AND MP BRIDGES, REVISE THE CONNECTION DETAIL FOR THE GAGE WELL PEDESTRIAN BRIDGE, ADD GEL IN THE ANNULAR SPACE BETWEEN THE YOKE BOLTS AND THE PVC SLEEVE. · W912ES17C0003

Modification A00016 · May 27, 2022 · $37,440 action obligation · THIS CONTRACT IS MODIFIED TO: REVISE THE PRESTRESSED SOLE PLATE DETAILS SHOWN ON SHEET S- 541 AND CHANGE THE EXPANSION AND FIXED CURVED PLATE BEARING ASSEMBLIES SHOWN ON SHEET S-542. · W912ES17C0003

Modification A00015 · Jan 10, 2022 · $15,882 action obligation · THIS CONTRACT IS MODIFIED TO ADD EMBED DOORS ALONG THE BRIDGE DECK, REMOVE EXPANSION JOINTS PARALLEL TO THE BRIDGE, CORRECT AN ERROR IN THE SPECIFICATIONS REGARDING PRE-TENSIONED LOADS, CLARIFY THE DESIGN OF THE EXPANSION JOINTS, ADJUST THE YOKE MOUNTING, REVISE RIPRAP ELEVATION, REVISE THE WIDTH OF THE ABUTMENT ANCHORAGE BLOCKOUT, PROVIDE MORE DETAIL ON THE TAINTER GATE SEAL BLOCKOUT REINFORCEMENT. · W912ES17C0003

Modification A00014 · Nov 22, 2021 · $487,740 action obligation · GAUGE WELL PART II - THIS IS THE SECOND PART OF A 2-PART MODIFICATION TO INSTALL A GAUGE WELL ON THE UPSTREAM SIDE OF THE DIVERSION INLET STRUCTURE. · W912ES17C0003

Modification P00009 · Oct 7, 2021 · $-2,163,509 action obligation · THIS CONTRACT IS MODIFIED TO: DELETE THE REQUIREMENT TO CONDUCT DEEP SOIL MIXING AND COMPENSATE THE CONTRACTOR FOR COSTS INCURRED IN PREPARATION FOR THE WORK WHICH WAS DELETED UNDER THIS MODIFICATION. · W912ES17C0003

Modification A00013 · Sep 16, 2021 · $37,054 action obligation · THIS CONTRACT IS MODIFIED TO: (1) UPDATE THE TRAINING REQUIREMENT FOR QC PERSONNEL MONITORING THE PAINTING OF HYDRAULIC STRUCTURES AND MECHANICAL EQUIPMENT (2) SWITCH THE INTERNET BILLING FOR THE GOVERNMENT TRAILER OVER TO THE CONTRACTOR (3) CHANGE CLIN NUMBERS UTILIZED IN MODIFICATION A000012 TO MATCH RMS REQUIREMENTS · W912ES17C0003

Modification A00012 · Sep 8, 2021 · $138,859 action obligation · THIS CONTRACT IS MODIFIED TO: ADJUST THE ESTIMATED QUANTITIES TO INTERIM QUANTITIES FOR CLINS 0015AB RIPRAP (R140), 0017AB B2 BEDDING, 0020 GEOTEXTILE - TYPE 1. · W912ES17C0003

Modification A00011 · Apr 26, 2021 · $43,822 action obligation · PILE INSTALLATION FOR A GAUGE WELL COMPENSATE THE GOVERNMENT FOR RE-INSPECTION COSTS REVISE THE REVEAL ELEVATION ON PIER ABUTMENTS SURVEYING COSTS FOR SETTLEMENT PLATES. · W912ES17C0003

Modification A00010 · Feb 3, 2021 · $154,302 action obligation · THIS CONTRACT IS MODIFIED TO: (1) ( R-16) CHANGE THE TRUNNION GIRDER AND ANCHORAGE SYSTEM DUCT MATERIAL FROM GROUT TO GEL AND REDUCE BAR SIZE FOR ANCHORAGE. 2) ( R-26) CLARIFY DIMENSIONS OF THE TRUNNION GIRDER NOTCH 3) ( R-27) CLARIFY COLORS FOR WINDOWS, EXTERIOR DOORS AND METAL WALL LOUVERS ON THE CONTROL STRUCTURE BUILDING 4) (R-28) ADDITIONAL CLARIFICATIONS OF THE DIMENSIONS OF THE TRUNNION GIRDER NOTCH 5) ( R-29) CHANGES TO THE MECHANICAL PLATFORM LIGHT POLE BASE AND WIRE ROPE OPENINGS 6) ( · W912ES17C0003

Modification P00008 · Nov 13, 2020 · $895,279 action obligation · FINAL EQUITABLE ADJUSTMENT FOR THE FARGO SUSPENSION. · W912ES17C0003

Modification A00009 · Nov 12, 2020 · $0 action obligation · THIS CONTRACT IS MODIFIED TO: (1) ANNOTATE EXACT CAMERA AND LIGHT POLE LOCATIONS (2) CLARIFY CONCRETE AIR CONTENT, SLUMP AND COMPRESSION TESTING REQUIREMENTS. · W912ES17C0003

Source: USAspending.gov

Find out who's winning similar federal contracts

Discover comparable awards, related contractors, and agency purchasing history.

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.