Federal Awards · BUNDESAMT FÜR BAUWESEN UND RAUMORDNUNG · Award

ABGX SOFA EDI OPERATIONAL READINESS TRAINING COMPLEX ORTC PHASE 1 EAST CAMP GRAFENWOEHR GERMANY

Award details are derived from public USAspending.gov records. Not a bid recommendation.

Award details

Award ID
W912GB20C0011
Contractor
BUNDESAMT FÜR BAUWESEN UND RAUMORDNUNG
Awarding agency
Department of Defense
Sub-agency / office
Department of the Army
Award amount
$100,340,866
Period of performance
May 13, 2020 – Dec 30, 2029
NAICS
238990 — All Other Specialty Trade Contractors
Place of performance
DEU
Competition
FULL AND OPEN COMPETITION · Set-aside: NO SET ASIDE USED. · 2 offers
Pricing
FIRM FIXED PRICE
Financial breakdown
Current value $109,045,152 · Obligated $108,864,396 · Potential value $109,045,152 · Latest action obligation $192,381 · Outlays $3,187,221

Public award description

ABGX SOFA EDI OPERATIONAL READINESS TRAINING COMPLEX ORTC PHASE 1 EAST CAMP GRAFENWOEHR GERMANY

Most recent · Modification P00019 · Jul 6, 2026 · $192,381 action obligation · REVISE ADDITIONAL SERVICES · W912GB20C0011

Modification P00018 · Apr 23, 2026 · $534,526 action obligation · CR039-FURNISH ALL NECESSARY PLANT, LABOR, MATERIAL, EQUIPMENT, TRANSPORTATION, AND SUPERVISION TO COMPLETE THE SURFACE WATER DRAINAGE SYSTEM VIA DRAINAGE BASINS INTO THE WETLAND AREA EAST OF THE ORTC PROJECT SITE. · W912GB20C0011

Modification A00018 · Apr 22, 2026 · $2,056 action obligation · CR 5C001-EXTERIOR GLAZING COMPONENTS INSTALLED IN OCCUPIED AREAS MUST PROVIDE A LOW LEVEL OF PROTECTION (L-LOP) IN ACCORDANCE WITH UFC 4-010-01. THE HAZARD RATING FOR THE PROPOSED EXTERIOR GLAZING COMPONENTS MUST BE NO LESS THAN VERY LOW RATING. · W912GB20C0011

Modification A00019 · Apr 22, 2026 · $8,164 action obligation · CR 5C002-THE NEW WASTEWATER SEWAGE MANHOLE SHALL BE EQUIPPED WITH AN EXTERNAL PIPE DROP, WHICH ENSURES THE NECESSARY ACCESSIBILITY FOR REVISIONS, INSPECTIONS, MAINTENANCE, AND CLEANING WORK IN ACCORDANCE WITH THE APPLICABLE TECHNICAL REGULATIONS. · W912GB20C0011

Modification A00017 · Apr 20, 2026 · $12,072 action obligation · CR 3C001-CONCRETE TESTING- INSTALLATION OF CONCRETE OF MONITORING CLASS 2. CLASSIFICATIONS IN THE MONITORING CLASSES AND MONITORING OF THE INSTALLATION ACCORDING TO DIN 1045-3. MONITORING CONCRETE QUALITY FROM C25/C30. · W912GB20C0011

Modification A00015 · Apr 16, 2026 · $25,104 action obligation · CR035 SEALING OF CABLE CONDUIT-PROVIDE ADDITIONAL CABLE CONDUIT SEALS, AND QTY REDUCTIONS: LOW VOLTAGE CABLES CR037 FLEX CONDUIT TO TRANSFORMERS-PROVIDE A FLEXIBLE CONDUIT SYSTEM FOR POWER CABLES FROM MANHOLES TO TRANSFORMER STATIONS · W912GB20C0011

Modification A00016 · Apr 16, 2026 · $237,461 action obligation · CR018 - UXO INVESTIGATIONS- FURNISH ALL NECESSARY PLANT, LABOR, MATERIAL, EQUIPMENT, TRANSPORTATION, AND SUPERVISION TO CONDUCT ADDITIONAL SURVEYS/SOUNDING TO DETERMINE THE EXTENT OF UXO PRESENCE AND DENSITY ON THE ORTC 1.1A CONSTRUCTION AREA. · W912GB20C0011

Modification P00017 · Apr 7, 2026 · $4,460,960 action obligation · ABG-3 INCREASE ESTIMATED CONSTRUCTION COSTS AND FEES FOR PART 6 EDI OPERATIONAL READINESS TRAINING COMPLEX (ORTC) - PHASE 1.1A GRAFENWOEHR-PART 6 DINING FACILITY (DFAC) · W912GB20C0011

Modification A00014 · Apr 6, 2026 · $32,072 action obligation · CR042 - NA 91.30 - REPLACE HV/MV CABLE VAULT COVERS- FURNISH ALL NECESSARY PLANT, LABOR, MATERIAL, EQUIPMENT, TRANSPORTATION, AND SUPERVISION TO REPLACE TWENTY-SIX (26) INSTALLED HV/MV MANHOLE VAULT COVERS WITH NEW WATERTIGHT COVERS. · W912GB20C0011

Modification A00013 · Apr 1, 2026 · $195,988 action obligation · CR014 NA-91.09, RE-ROUTE EXISTING SIGNALS COMM CABLE CR027 NA-91.18, MANHOLE ENTRY LADDERSCR028 NA-91.19, CONTAMINATED MATERIAL DISPOSALCR029 NA-91.20, LOWER DISTRICT HEATING LINES A VMS · W912GB20C0011

Modification P00016 · Mar 31, 2026 · $1,965,860 action obligation · DISPOSE OF APPROX. 20,000 M OF LIGHTLY TO HEAVILY CONTAMINATED TOPSOIL, INCLUDING LOADING, TRANSPORT, AND FINAL DISPOSAL AT CERTIFIED DISPOSAL SITES. · W912GB20C0011

Modification A00012 · Mar 26, 2026 · $10,151 action obligation · SOIL REPLACEMENT IS NECESSARY TO ENSURE THE PLATE LOAD TESTS PASS. DURING THE EXCAVATION WORK, WATER ACCUMULATED FROM THE EMPTY PIPELINES EXISTING IN THE SUBSOIL LEAKED INTO THE SUBSOIL. · W912GB20C0011

Modification A00010 · Mar 24, 2026 · $0 action obligation · CHANGE REQUIRED TO IMPLEMENT CURRENT UFC CRITERIA FOR FACILITY BATTERY SYSTEMS. · W912GB20C0011

Modification A00011 · Mar 24, 2026 · $0 action obligation · CHANGE REQUIRED TO IMPLEMENT CURRENT UFC CRITERIA FOR FACILITY BATTERY SYSTEMS. · W912GB20C0011

Modification A00009 · Mar 23, 2026 · $0 action obligation · CHANGE REQUIRED TO IMPLEMENT CURRENT UFC CRITERIA FOR FACILITY BATTERY SYSTEMS. · W912GB20C0011

Modification A00008 · Mar 18, 2026 · $0 action obligation · CHANGE REQUIRED TO IMPLEMENT CURRENT UFC CRITERIA FOR FACILITY BATTERY SYSTEMS. · W912GB20C0011

Modification P00014 · Nov 17, 2025 · $-257,995 action obligation · SOFA ABG-X EDI OPERATIONAL READINESS TRAINING COMPLEX (ORTC) PHASE 1.1A, EAST CAMP GRAFENWOEHR · W912GB20C0011

Modification P00013 · Sep 30, 2025 · $-86,177 action obligation · SOFA ABG-X EDI OPERATIONAL READINESS TRAINING COMPLEX (ORTC) PHASE 1.1A, GRAFENWOEHR · W912GB20C0011

Modification P00012 · Sep 12, 2025 · $-1,611,427 action obligation · SOFA ABG-X EDI OPERATIONAL READINESS TRAINING COMPLEX (ORTC) PHASE 1.1A, EAST CAMP GRAFENWOEHR · W912GB20C0011

Modification A00007 · Sep 12, 2025 · $84,155 action obligation · CONTRACT FOR ABG4 EDI OPERATIONAL READINESS TRAINING COMPLEX GRAFENWOEHR GERMANY AT GRAFENWOHR, GERMANY. REFERENCE NO. R00018. TOTAL CONTRACT PRICE INCREASED BY 73,565.78 EU. THE CONTRACT COMPLETION DATE SHALL REMAIN UNCHANGED BY THIS MODIFICATION. · W912GB20C0011

Modification A00006 · Jul 18, 2025 · $283,845 action obligation · CONTRACT FOR ABG4 EDI OPERATIONAL READINESS TRAINING COMPLEX GRAFENWOEHR GERMANY. REFERENCE NO. R00015. TOTAL CONTRACT PRICE INCREASED BY 248,127.58 EU. THE CONTRACT COMPLETION DATE SHALL REMAIN UNCHANGED BY THIS MODIFICATION. · W912GB20C0011

Modification P00011 · Jul 17, 2025 · $393,830 action obligation · SOFA ABG-X EDI OPERATIONAL READINESS TRAINING COMPLEX, ORTC, PHASE 1.1A GRAFENWOEHR · W912GB20C0011

Modification A00005 · Jul 17, 2025 · $444,251 action obligation · CONTRACT FOR ABG4 EDI OPERATIONAL READINESS TRAINING COMPLEX GRAFENWOEHR GERMANY. REFERENCE NO. R00014. TOTAL CONTRACT PRICE INCREASED BY 388,348.75 EU. THE CONTRACT COMPLETION DATE SHALL REMAIN UNCHANGED BY THIS MODIFICATION. · W912GB20C0011

Modification P00010 · May 27, 2025 · $31,152,045 action obligation · SOFA ABG-X CONSTRUCT EDI OPERATIONAL READINESS TRAINING COMPLEX ORTC PHASE 1.1A · W912GB20C0011

Modification A00004 · May 13, 2025 · $283,639 action obligation · CONTRACT FOR ABG4 EDI OPERATIONAL READINESS TRAINING COMPLEX GRAFENWOEHR GERMANY, REFERENCE NO. R00012. TOTAL CONTRACT PRICE INCREASED BY 247,947.66 EU. THE CONTRACT COMPLETION DATE SHALL REMAIN UNCHANGED BY THIS MODIFICATION. · W912GB20C0011

Source: USAspending.gov

Find out who's winning similar federal contracts

Discover comparable awards, related contractors, and agency purchasing history.

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.