- Award ID
- W912GB23C0012
- Contractor
- ZAFER TAAHHUT INSAAT VE TICARET ANONIM SIRKETI
- Sub-agency / office
- Department of the Army
- Award amount
- $78,264,639
- Period of performance
- Sep 13, 2023 – Sep 3, 2026
- NAICS
- 236220 — Commercial and Institutional Building Construction
- PSC
- PSC Y1GZ
- Place of performance
- HUN
- Competition
- FULL AND OPEN COMPETITION · Set-aside: NO SET ASIDE USED. · 5 offers
- Pricing
- FIRM FIXED PRICE
- Financial breakdown
- Current value $84,452,278 · Obligated $84,452,278 · Potential value $84,452,278 · Latest action obligation $1,287,681
Most recent · Modification P00009 · Jun 11, 2026 · $1,287,681 action obligation · CHANGE: CR040 NETWORK AND POWER SUPPLY CONNECTION RFI156, CR042 FUEL SYSTEM REVISIONS, CR043 SITE-INFILTRATION DITCH SLOPE STABIL. · W912GB23C0012
Modification A00013 · Mar 19, 2026 · $222,488 action obligation · CHANGE: CR035 TITLE: VHMNT - OVEREXCAVATION OVER EXCAVATE APPROXIMATELY 2,200 SQUARE METERS OF UNSUITABLE SOILS AND REPLACE WITH SATISFACTORY SOIL IN THE NORTHWEST AREA OF THE VEHICLE MAINTENANCE FACILITY IN ACCORDANCE WITH SPEC 31 00 00. · W912GB23C0012
Modification P00008 · Feb 23, 2026 · $4,452,190 action obligation · CR036 STORMWATER DESIGN REVISIONS CR037 POTABLE WATER CONNECTION TO PAPA ABCR038 HVAC WATER TREATMENTCR041 FIRE PROTECTION CHANGES · W912GB23C0012
Modification A00012 · Jan 29, 2026 · $159,860 action obligation · CR032; FIRE HYDRANT: ADJUST EAST ROAD A EDGE TO DECONFLICT WITH THE EXISTING FIRE HYDRANT BY ONE METER. MANHOLE IN INFILTRATION DITCH (WEST SIDE). CR033; COMPLETE THE CONSTRUCTION OF INTERIOR PARTITION WALLS, WHICH INCORPORATES ADDITIONAL FRAMING. · W912GB23C0012
Modification P00007 · Oct 29, 2025 · $503,848 action obligation · THE INSTALLATION OF CCTV AND OTHER SECURITY SENSORS BY HM ARZENAL ZRT IS HEREBY REMOVED FROM THE SCOPE FOR THE TEMPORARY SECURITY FENCELINE · W912GB23C0012
Modification A00011 · Sep 12, 2025 · $26,180 action obligation · CR029 TELECOM DUCTBANK OBSTRUCTION REMOVAL AND CR034 TITLE: REFUEL EXPANSION TANK FOR WH-2. · W912GB23C0012
Modification P00006 · Aug 8, 2025 · $7,460,633 action obligation · ROLLING STOCK WAREHOUSE · W912GB23C0012
Modification A00010 · Jul 28, 2025 · $88,549 action obligation · CR031 VHMNT & CONT UNFORESEEN CONCRETE & SOIL · W912GB23C0012
Modification P00005 · Jul 23, 2025 · $0 action obligation · SOFA HUNGARY DABS · W912GB23C0012
Modification A00009 · May 29, 2025 · $10,643 action obligation · CR026 FUEL CONTAINMENT VAULT ACCESS · W912GB23C0012
Modification P00004 · May 5, 2025 · $0 action obligation · ROLLING STOCK WAREHOUSE · W912GB23C0012
Modification P00003 · May 1, 2025 · $506,237 action obligation · EXHAUST VENTILATORS RFI 0039 CONTRACT FOR CONSTRUCT DEPLOYABLE AIRBASE SYSTEMS DABS FACILITIES, EQUIPMENT AND VEHICLES FEV STORAGE, PAPA AIR BASE, HUNGARY AT PAPA AIR BASE, HUNGARY REFERENCE NO. R00010 · W912GB23C0012
Modification A00008 · Mar 4, 2025 · $30,889 action obligation · CONTRACT FOR CONSTRUCT DEPLOYABLE AIRBASE SYSTEMS FACILITIES, EQUIPMENT AND VEHICLES STORAGE, PAPA AIR BASE, HUNGARY AT PAPA AIR BASE, HUNGARY CR023 UG CONDUIT - UNFORESEEN CONCRETE DEBRIS CR024 CONT UNFORESEEN UTILITY DEBRIS · W912GB23C0012
Modification A00007 · Feb 25, 2025 · $99,323 action obligation · CONTRACT FOR CONSTRUCT DEPLOYABLE AIRBASE SYSTEMS FACILITIES, EQUIPMENT AND VEHICLES STORAGE, PAPA AIR BASE, HUNGARY AT PAPA AIR BASE, HUNGARY REFERENCE NO. R00008 CR018 VHMNT AND REFUEL SS PIPE · W912GB23C0012
Modification A00006 · Feb 7, 2025 · $221,092 action obligation · CONTRACT FOR CONSTRUCT DABS FACILITIES, EQUIPMENT AND VEHICLES STORAGE, PAPA AIR BASE, HUNGARY R00007 CR009 WALL LOUVER SIZE CHANGES CR010 UG HW SYS EXP. COMPENSATORS CR013 SITE CONDUIT REV. CR017 CABLE TRAY SIZING CR019 LOUVER GATE HEIGHTS · W912GB23C0012
Modification A00005 · Jan 15, 2025 · $293,029 action obligation · CONTRACT FOR CONSTRUCT DEPLOYABLE AIRBASE SYSTEMS (DABS) - FACILITIES, EQUIPMENT AND VEHICLE STORAGE, PAPA AIR BASE, HUNGARY CR011 ROLL ELEVATED GROUNDWATER CR012 VHMT UNFORESEEN CONCRETE DEBRIS · W912GB23C0012
Modification P00002 · Dec 30, 2024 · $948,805 action obligation · CONTRACT FOR CONSTRUCT DEPLOYABLE AIRBASE SYSTEMS (DABS) FACILITIES, EQUIPMENT AND VEHICLES (FEV) STORAGE, PAPA AIR BASE, HUNGARY AT PAPA AIR BASE, HUNGARY. CR002 FOUNDATION FOOTING CHANGES · W912GB23C0012
Modification A00004 · Oct 31, 2024 · $163,895 action obligation · CONTRACT FOR CONSTRUCT DEPLOYABLE AIRBASE SYSTEMS (DABS) FACILITIES, EQUIPMENT AND VEHICLES (FEV) STORAGE, PAPA AIR BASE, HUNGARY AT PAPA AIR BASE, HUNGARY. CR016 DOWEL SIZE AND LENGTH CHANGES (RFI-069) · W912GB23C0012
Modification A00003 · Oct 16, 2024 · $498,024 action obligation · CONTRACT FOR CONSTRUCT DEPLOYABLE AIRBASE SYSTEMS (DABS) FACILITIES, EQUIPMENT AND VEHICLES (FEV) STORAGE, PAPA AIR BASE, HUNGARY AT PAPA AIR BASE, HUNGARY. CR003 E-BOOK CONSTRUCTION LOG · W912GB23C0012
Modification A00002 · Sep 19, 2024 · $302,146 action obligation · CONTRACT FOR CONSTRUCT DEPLOYABLE AIRBASE SYSTEMS (DABS) FACILITIES, EQUIPMENT AND VEHICLES (FEV) STORAGE, PAPA AIR BASE, HUNGARY CR004 ACS COMPONENTS & DRY-BARREL HYDRANTS CR006 ARCHEOLOGICAL PERMIT COMPLIANCE CR007 TEMPORARY SECURITY PATROL ROAD · W912GB23C0012
Modification A00001 · Apr 17, 2024 · $85,086 action obligation · CONTRACT FOR CONSTRUCT DEPLOYABLE AIRBASE SYSTEMS (DABS) FACILITIES, EQUIPMENT AND VEHICLES (FEV) STORAGE, PAPA AIR BASE, HUNGARY AT PAPA AIR BASE, HUNGARY. CR001 LAYDOWN AREA & UXO CLEARANCE · W912GB23C0012
Modification P00001 · Nov 7, 2023 · $0 action obligation · NOTICE TO PROCEED · W912GB23C0012
Modification 0 · Sep 13, 2023 · $67,026,262 action obligation · CONSTRUCT DEPLOYABLE AIRBASE SYSTEMS (DABS) FACILITIES, EQUIPMENT AND VEHICLES (FEV) STORAGE, PAPA AIR BASE, HUNGARY · W912GB23C0012