Federal Awards · THALLE CONSTRUCTION CO INC · Award

SCOPE OF WORK A00053 WKR049-2 M10 WATERTIGHT DOOR AND UTILITY EMBEDS (FINAL): THIS MODIFICATION IS FOR PROC…

Award details are derived from public USAspending.gov records. Not a bid recommendation.

Award details

Award ID
W912P521C0015
Contractor
THALLE CONSTRUCTION CO INC
Awarding agency
Department of Defense
Sub-agency / office
Department of the Army
Funding agency
Corps of Engineers - Civil Works
Award amount
$404,955,599
Period of performance
Oct 11, 2021 – Sep 9, 2027
NAICS
237990 — Other Heavy and Civil Engineering Construction
Place of performance
GRAND RIVERS, KY, 420459165, USA
Competition
FULL AND OPEN COMPETITION · Set-aside: NO SET ASIDE USED. · 3 offers
Pricing
FIRM FIXED PRICE
Financial breakdown
Current value $408,239,497 · Obligated $408,239,497 · Potential value $408,239,497 · Latest action obligation $230,902 · Outlays $72,127,864

Public award description

SCOPE OF WORK A00053 WKR049-2 M10 WATERTIGHT DOOR AND UTILITY EMBEDS (FINAL): THIS MODIFICATION IS FOR PROCURING AND INSTALLING A WATERTIGHT DOOR, PIPE SLEEVES, AND A THRU-WALL BARRIER MOUNTING FRAME AT MONOLITH M10.

Most recent · Modification A00054 · Jun 17, 2026 · $230,902 action obligation · SCOPE OF WORK A00053 WKR049-2 M10 WATERTIGHT DOOR AND UTILITY EMBEDS (FINAL): THIS MODIFICATION IS FOR PROCURING AND INSTALLING A WATERTIGHT DOOR, PIPE SLEEVES, AND A THRU-WALL BARRIER MOUNTING FRAME AT MONOLITH M10. · W912P521C0015

Modification A00053 · Jun 11, 2026 · $148,000 action obligation · SCOPE OF WORK A00053 WKR049-2 M10 WATERTIGHT DOOR AND UTILITY EMBEDS (FINAL): THIS MODIFICATION IS FOR PROCURING AND INSTALLING A WATERTIGHT DOOR, PIPE SLEEVES, AND A THRU-WALL BARRIER MOUNTING FRAME AT MONOLITH M10. · W912P521C0015

Modification A00052 · May 19, 2026 · $440,000 action obligation · SCOPE OF WORK A00052 WKR079 PHASE 3 ROCK STABILIZATION: THIS MODIFICATION IS FOR STABILIZING THE PHASE 3 ROCK NEAR MONOLITH M32 BY REMOVAL OF UNSTABLE MATERIAL, WATER MITIGATION, REBAR DOWELS, FORMWORK, AND CONCRETE OVERPOUR. · W912P521C0015

Modification P00019 · May 12, 2026 · $20,000 action obligation · SCOPE OF WORK WKR072-2 BRIDGE PIER AND M17 GALLERY CHANGES (PART I-SUPPLEMENT): RESIZE/SHIFT TWO BRIDGE PIER COLUMNS, ADD ELECTRICAL BLOCK OUT, REBAR QUANTITIES, REBAR INSTALLATION, CONCRETE, CEMENT, FLY ASH, ADD FLOOR HATCH, DRAINPIPE, DRAIN COVERS. · W912P521C0015

Modification P00018 · Apr 23, 2026 · $140,000 action obligation · SCOPE OF WORK WKR100-1 M31 WEDGE TREATMENT (PART I-NTP): THE CONTRACTOR SHALL TIE INTO MONOLITH M31C FROM THE BULL NOSE OF M31 AND ALTERS THE STICK-BUILT WALL ARMOR THAT IS NO LONGER REQUIRED TO TIE INTO THE SEGMENTAL COFFERDAM. · W912P521C0015

Modification P00017 · Apr 15, 2026 · $0 action obligation · SCOPE OF WORK WKR100-1 M31 WEDGE TREATMENT (PART I-NTP): THE CONTRACTOR SHALL TIE INTO MONOLITH M31C FROM THE BULL NOSE OF M31 AND ALTERS THE STICK-BUILT WALL ARMOR THAT IS NO LONGER REQUIRED TO TIE INTO THE SEGMENTAL COFFERDAM. · W912P521C0015

Modification A00051 · Apr 1, 2026 · $0 action obligation · SCOPE OF WORK WKR098 WEATHER TIME EXTENSION JUL 2025-JAN 2026. THIS MODIFICATION EXTENDS TIME FOR DELAYS CAUSED BY ADVERSE WEATHER DURING THE PERIOD 01 JULY 2025 THROUGH 31 JANUARY 2026. · W912P521C0015

Modification P00016 · Feb 23, 2026 · $20,000 action obligation · SCOPE OF WORK BRIDGE PIER M17 GALLERY CHANGES WKR072THIS MODIFICATION CHANGES QUANTITIES OF REBAR, REBAR INSTALLATION, CONCRETE, CEMENT, AND FLY ASH, PLUS ADDS A FLOOR HATCH AND LADDER LEADING INTO THE GALLERY. · W912P521C0015

Modification A00050 · Feb 9, 2026 · $23,269 action obligation · SCOPE OF WORK WKR062 M17, M19, M20 DRAIN: THIS MODIFICATION INCREASES THE DRAIN SIZE TO MITIGATE WATER DRAINAGE POOLING BETWEEN THE NEW LOCK AND EXISTING LOCK. · W912P521C0015

Modification P00015 · Jan 8, 2026 · $50,000 action obligation · SCOPE OF WORK WKR096-1 U1 WALL ARMOR-CAISSON CONFLICT (PT. I NTP): THIS MODIFICATION ADDS A PERMANENT PINTLE GREASE LINE AND PROVIDES SPECIFICATIONS FOR TOLERANCES, INSTALLATION REQUIREMENTS, FIELD TESTS, AND INSPECTIONS. · W912P521C0015

Modification A00049 · Dec 22, 2025 · $75,000 action obligation · SCOPE OF WORK WKR096-1 U1 WALL ARMOR-CAISSON CONFLICT (PT. I NTP) · W912P521C0015

Modification A00048 · Nov 24, 2025 · $82,117 action obligation · CASES WKR048, -081, -084, -085, -091, -092, -094 MODIFICATION A00048 "L14 WALL & U2M/U2L FMB ELEV., HOSE CABINET RELOCATION, EPOXY GROUT CREDIT, CULVERT BULKHEAD GRATING SUPPORT, M31 JT REDUCTION, KEYWAY FORMWORK REDESIGN, LIFT STATION CLEANOUT" · W912P521C0015

Modification P00014 · Nov 13, 2025 · $1,254,730 action obligation · CASE WKR088 MODIFICATION P00014 "QV-EXCAVATION AND DENTAL" · W912P521C0015

Modification P00013 · Oct 21, 2025 · $3,027,716 action obligation · CASE WKR017 MODIFICATION P00013 "BULKHEAD RECESS METALS & GALLERY GUTTER" · W912P521C0015

Modification A00047 · Sep 30, 2025 · $126,619 action obligation · CASE WKR077, WKR090 MODIFICATION A00047 "U1 ANCHOR CHANGE & US 2ND STAGE JOINT PREP" · W912P521C0015

Modification A00046 · Sep 10, 2025 · $-67,022 action obligation · CASE WKR073, WKR080, WKR086 MODIFICATION A00046 "ACTIVE WELD, WALL ARMOR, CSG CHANGE" · W912P521C0015

Modification A00045 · Sep 3, 2025 · $195,506 action obligation · CASE WKR058 MODIFICATION A00045 "CONTROL STAND GALLERY EXTENSIONS" · W912P521C0015

Modification A00044 · Aug 26, 2025 · $60,000 action obligation · CASE WKR049-1 MODIFICATION A00044 "M10 WATERTIGHT DOOR & UTILITY EMBEDS" · W912P521C0015

Modification A00043 · Aug 22, 2025 · $47,625 action obligation · CASE WKRO78-1 MODIFICATION A00043 C31-C32 OUTLET WORKS GEOMETRY (PART 1-NTP) · W912P521C0015

Modification A00042 · Jul 30, 2025 · $0 action obligation · CASE WKRO87 MODIFICATION A00042 "WEATHER TIME EXTENSION MAY 25-JUN 25" · W912P521C0015

Modification A00041 · Jul 24, 2025 · $-225,976 action obligation · WKR074 A00041 "HIGH MAST LIGHTS DESCOPE" · W912P521C0015

Modification A00040 · Jul 10, 2025 · $17,000 action obligation · CASE WKR075 MODIFICATION A00040 "U1M CAISSON CHANGES" · W912P521C0015

Modification A00039 · Jun 2, 2025 · $0 action obligation · CASE WKR076 MODIFICATION A00039 "WEATHER TIME EXTENSION JAN 25-APR 25" · W912P521C0015

Modification A00038 · May 19, 2025 · $6,000 action obligation · CASE WKR063 MODIFICATION A00038 DRILLED SHAFT M21-P5 STEEL OBSTRUCTION · W912P521C0015

Modification A00037 · Apr 23, 2025 · $13,877 action obligation · CASE WKRO61 MODIFICATION A00037 PARTNERING COSTS 2025 · W912P521C0015

Source: USAspending.gov

Find out who's winning similar federal contracts

Discover comparable awards, related contractors, and agency purchasing history.

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.