- Award ID
- W912QR24C0026
- Contractor
- L.S. BLACK CONSTRUCTORS, LLC
- Sub-agency / office
- Department of the Army
- Award amount
- $30,332,803
- Period of performance
- Aug 28, 2024 – Dec 26, 2026
- NAICS
- 236220 — Commercial and Institutional Building Construction
- Place of performance
- SAINT PAUL, MN, 551114017, USA
- Competition
- FULL AND OPEN COMPETITION · Set-aside: NO SET ASIDE USED. · 5 offers
- Pricing
- FIRM FIXED PRICE
- Financial breakdown
- Current value $31,806,748 · Obligated $31,806,748 · Potential value $31,806,748 · Latest action obligation $218,118
DESIGN-BUILD MAINTENANCE AND REPAIR OF AN ARMY RESERVE CENTER TRAINING BUILDING, BUILDING 505, AT FORT SNELLING, MINNESOTA. THIS REQUIREMENT INCLUDES A-E DESIGN AND CONSTRUCTION SERVICES.
Most recent · Modification P00004 · Jun 5, 2026 · $218,118 action obligation · MODIFICATION TO EXERCISE OPTION B FOR DESIGN-BUILD MAINTENANCE AND REPAIR ARMY RESERVES (MRAR) FORT SNELLING B505 AT FORT SNELLING IN SAINT PAUL, MN. · W912QR24C0026
Modification A00008 · Apr 30, 2026 · $39,374 action obligation · DESIGN-BUILD MAINTENANCE AND REPAIR ARMY RESERVES (MRAR) FORT SNELLING B505 AT FORT SNELLING IN SAINT PAUL, MN. · W912QR24C0026
Modification P00003 · Apr 22, 2026 · $449,537 action obligation · DESIGN-BUILD MAINTENANCE AND REPAIR ARMY RESERVES (MRAR) FORT SNELLING B505 AT FORT SNELLING IN SAINT PAUL, MN. · W912QR24C0026
Modification A00007 · Apr 1, 2026 · $101,332 action obligation · DESIGN-BUILD MAINTENANCE AND REPAIR ARMY RESERVES (MRAR) FORT SNELLING B505 AT FORT SNELLING IN SAINT PAUL, MN. · W912QR24C0026
Modification A00006 · Feb 9, 2026 · $35,904 action obligation · DESIGN-BUILD MAINTENANCE AND REPAIR ARMY RESERVES (MRAR) FORT SNELLING B505 AT FORT SNELLING IN SAINT PAUL, MN. · W912QR24C0026
Modification A00005 · Jan 29, 2026 · $37,721 action obligation · DESIGN-BUILD MAINTENANCE AND REPAIR ARMY RESERVES (MRAR) FORT SNELLING B505 AT FORT SNELLING IN SAINT PAUL, MN. · W912QR24C0026
Modification A00004 · Nov 12, 2025 · $5,670 action obligation · SECTION SF 30 BLOCK 14 CONTINUATION PAGE SUMMARY OF CHANGESTHE FOLLOWING HAVE BEEN ADDED BY FULL TEXT: DESCRIPTION OF CHANGE R00005 CHANGE 12 - INVESTIGATE EXISTING PIPE · W912QR24C0026
Modification A00003 · Oct 24, 2025 · $5,949 action obligation · CR 0014 ABATE BOILER STACK · W912QR24C0026
Modification A00002 · Oct 17, 2025 · $118,435 action obligation · R 13 CORE FILLS AT WINDOW JAMBS-IDENTIFY TO GOV CURRENT CONDITIONS OF ALL EXISTING WINDOW JAMBS AND APPROPRIATE REPAIR METHODS · W912QR24C0026
Modification A00001 · Aug 28, 2025 · $42,122 action obligation · CR 003 MEP GUARDRAILS AT INFILTRATION BASINS-CONSTRUCT BARRIER SYSTEM CR 005 OVERHEAD DOOR STAGING RM 139 - CHANGE DIMENSIONS OF OVH DOOR CR 008 MECHANICAL EQUIP DOOR CHANGE - CHANGE EGRESS TO SINGLE DOOR CR 009 ADDITONAL URINALS RMS 122A&238A · W912QR24C0026
Modification P00002 · May 20, 2025 · $0 action obligation · ADMINISTRATIVE MODIFICATION TO COMPLY WITH EXECUTIVE ORDER 14173 & EXECUTIVE ORDER 14148. REMOVING FAR CLAUSES 52.222-21, 52.222-26, AND 52.222-27. REVISED FAR CLAUSES 52.222-9, 52.244-6, AND 52.223-23. · W912QR24C0026
Modification P00001 · Sep 27, 2024 · $0 action obligation · ISSUE NOTICE-TO-PROCEED TO PROVIDE DESIGN AND CONSTRUCTION SERVICES FOR THE MAINTENANCE AND REPAIR OF A FAILING ARMY RESERVE CENTER TRAINING BUILDING, B505, AT FORT SNELLING, MN. · W912QR24C0026
Modification 0 · Aug 28, 2024 · $30,166,297 action obligation · DESIGN-BUILD MAINTENANCE AND REPAIR OF AN ARMY RESERVE CENTER TRAINING BUILDING, BUILDING 505, AT FORT SNELLING, MINNESOTA. THIS REQUIREMENT INCLUDES A-E DESIGN AND CONSTRUCTION SERVICES. · W912QR24C0026