SAM.gov listing

4420--SPS Steam Water Heater (Equipment) - VAMC Chillicothe

Veterans Affairs, Department Of.250-network Contract Office 10 (36c250)Combined Synopsis/SolicitationSolicitation 36C25026Q1040

Response deadline

Wed, Sep 23, 2026, 3:00 PM EDT

Product Service Code

PSC 4420
Analyze This Opportunity in CaptureIQ

Compare your company's capabilities against this federal opportunity using CaptureIQ.

Ready to Pursue This Opportunity?

Qualify the fit, analyze competitors, identify teaming partners, and generate review-ready materials — all in CaptureIQ.

  • Federal capture workflow
  • Competitor & teaming intelligence
  • Proposal preparation

Opportunity details

NAICS
333415
Notice type
Combined Synopsis/Solicitation
Set-aside
Small Business Set Aside - Total
Original posted
September 21, 2026
Last updated
October 18, 2026
Notice ID
79b052a383134b7c8e3dc9c418e3bd13

Summary

The purpose of this amendment is to post questions received and provide the facilities responses. The response date and time remain unchanged. 1. DELIVERY / LEAD TIME SOW paragraph 4 requires all wetted parts to be 316 or 316L stainless steel on an ASME-stamped packaged unit. Manufacturers we have approached indicate this is a made-to-order build rather than a catalog item, with fabrication lead times that may exceed the 90-day period of performance stated in paragraph 11. Will the Government accept a quoted delivery beyond 90 days after receipt of order where the vendor identifies the lead time in its quotation, or should quoters plan to invoke the 14-day notification provision in paragraph 11 after award? The facility has indicated either is sufficient. Please submit the most accurate delivery schedule possible with your quote. 2. SCOPE OF "ALL WETTED PARTS" Please confirm whether the 316/316L stainless requirement extends to the heat exchanger tube bundle and circulating pump, or whether it applies to the vessel, connections and wetted piping with a copper-alloy tube bundle remaining acceptable. Several standard packaged units meet every other requirement in paragraph 4 but use a copper U-bend coil or bronze circulator. Tube-bundle must be stainless steel, as copper piping is not compatible with low conductivity water. 3. CONTROL VALVE CONFIGURATION Paragraph 4 requires 1/3-2/3 control valves. Please confirm whether the control valves are to be pneumatic, electronic, or vendor's choice, and whether any BAS/BMS interface or signal type is required at the control panel. Electronic controls. BAS interface functionality (integration is not within scope) would be preferable but not required. 4. SOLICITATION NUMBER IN THE DESCRIPTION The first paragraph of the attached OPPORTUNITIES-DESCRIPTION 02 document references "solicitation number 36C25026Q1034" and also refers to providing "a Reverse Osmosis system." The CLIN schedule, Statement of Work, title and submission instructions all reference 36C25026Q1040 and two packaged steam water heaters. Please confirm that 36C25026Q1040 is the correct solicitation number and that the Reverse Osmosis reference is not part of this requirement. Reverse Osmosis system is a different requirement and not associated with 36C25026Q1040, which is limited to the two packaged steam water heaters. Paragraph is hereby corrected to: The contractor shall include all labor, materials, equipment, and shipping to comply with all applicable federal, state, local laws and regulations, and VA regulations as required to provide two packaged steam water heaters as outline in the SOW/SCHEDULE.: 5. INSTALLATION SOW paragraph 3 states that equipment install and testing are not within the scope of this contract. Please confirm that the vendor's responsibility ends at delivery to the Building 23 Warehouse with cut sheets and O&M manuals furnished, and that no rigging, setting, startup or commissioning labor is to be priced. Correct, install and setup is not required. 6. PAST PERFORMANCE Please confirm the number of past performance references desired, the relevancy period, and whether commercial references are acceptable alongside federal references. Past performance can be reviewed via CPARS. There is no specific number of references required. 7. EXISTING EQUIPMENT If available, please provide the make and model of the existing end-of-life units being replaced, and any connection sizes or physical envelope constraints in the Sterile Processing mechanical space, so that quoted units can be confirmed as a fit. Current system is an electric tank-based water heater at end of life. New water heater is being installed parallel to existing prior to cut over. Physical constraints limited to passage through standard height (84 inch) double door.

Read Full Official Summary

The purpose of this amendment is to post questions received and provide the facilities responses. The response date and time remain unchanged. 1. DELIVERY / LEAD TIME SOW paragraph 4 requires all wetted parts to be 316 or 316L stainless steel on an ASME-stamped packaged unit. Manufacturers we have approached indicate this is a made-to-order build rather than a catalog item, with fabrication lead times that may exceed the 90-day period of performance stated in paragraph 11. Will the Government accept a quoted delivery beyond 90 days after receipt of order where the vendor identifies the lead time in its quotation, or should quoters plan to invoke the 14-day notification provision in paragraph 11 after award? The facility has indicated either is sufficient. Please submit the most accurate delivery schedule possible with your quote. 2. SCOPE OF "ALL WETTED PARTS" Please confirm whether the 316/316L stainless requirement extends to the heat exchanger tube bundle and circulating pump, or whether it applies to the vessel, connections and wetted piping with a copper-alloy tube bundle remaining acceptable. Several standard packaged units meet every other requirement in paragraph 4 but use a copper U-bend coil or bronze circulator. Tube-bundle must be stainless steel, as copper piping is not compatible with low conductivity water. 3. CONTROL VALVE CONFIGURATION Paragraph 4 requires 1/3-2/3 control valves. Please confirm whether the control valves are to be pneumatic, electronic, or vendor's choice, and whether any BAS/BMS interface or signal type is required at the control panel. Electronic controls. BAS interface functionality (integration is not within scope) would be preferable but not required. 4. SOLICITATION NUMBER IN THE DESCRIPTION The first paragraph of the attached OPPORTUNITIES-DESCRIPTION 02 document references "solicitation number 36C25026Q1034" and also refers to providing "a Reverse Osmosis system." The CLIN schedule, Statement of Work, title and submission instructions all reference 36C25026Q1040 and two packaged steam water heaters. Please confirm that 36C25026Q1040 is the correct solicitation number and that the Reverse Osmosis reference is not part of this requirement. Reverse Osmosis system is a different requirement and not associated with 36C25026Q1040, which is limited to the two packaged steam water heaters. Paragraph is hereby corrected to: The contractor shall include all labor, materials, equipment, and shipping to comply with all applicable federal, state, local laws and regulations, and VA regulations as required to provide two packaged steam water heaters as outline in the SOW/SCHEDULE.: 5. INSTALLATION SOW paragraph 3 states that equipment install and testing are not within the scope of this contract. Please confirm that the vendor's responsibility ends at delivery to the Building 23 Warehouse with cut sheets and O&M manuals furnished, and that no rigging, setting, startup or commissioning labor is to be priced. Correct, install and setup is not required. 6. PAST PERFORMANCE Please confirm the number of past performance references desired, the relevancy period, and whether commercial references are acceptable alongside federal references. Past performance can be reviewed via CPARS. There is no specific number of references required. 7. EXISTING EQUIPMENT If available, please provide the make and model of the existing end-of-life units being replaced, and any connection sizes or physical envelope constraints in the Sterile Processing mechanical space, so that quoted units can be confirmed as a fit. Current system is an electric tank-based water heater at end of life. New water heater is being installed parallel to existing prior to cut over. Physical constraints limited to passage through standard height (84 inch) double door.

Official SAM.gov Contract Opportunities file extract description for this notice. CaptureIQ does not generate or rewrite this text.

Related Federal Opportunities

Why this matters

  • This notice is a combined synopsis/solicitation.
  • The listed response deadline is Sep 23, 2026.
  • 4 related opportunities share this NAICS.

Related federal terms

  • NAICS — North American Industry Classification System
  • PSC — Product Service Code

Market context

4 Related OpportunitiesMatching opportunities on RFPCapture

Related intelligence

Research and capture tools

This notice carries an explicit small-business set-aside designation.

← All federal opportunities · Federal Opportunity Research

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.