SAM.gov listing

618-26-702 EHRM Install DDPO 2

Veterans Affairs, Department of → Network Contract Office 23 (36c263)SolicitationSolicitation 36C26326B0030-0003

Response deadline

Tue, Jun 9, 2026, 11:00 AM EDT
Analyze This Opportunity in CaptureIQ

Compare your company's capabilities against this federal opportunity using CaptureIQ.

Ready to Pursue This Opportunity?

Qualify the fit, analyze competitors, identify teaming partners, and generate review-ready materials — all in CaptureIQ.

  • Federal capture workflow
  • Competitor & teaming intelligence
  • Proposal preparation

Opportunity details

NAICS
238210
Notice type
Solicitation
Set-aside
Service-Disabled Veteran-Owned Small Business Set Aside
Original posted
May 28, 2026
Last updated
October 18, 2026
Notice ID
55d04e896e3242b9811a01c633bdf9d2

Summary

The intent of this project is to provide construction services for a Department of Veteran Affairs Electronic Health Records Modernization (EHRM) project initiative and a 2026 Current State Review (CSR) at the Minneapolis VA Medical Center, One Veterans Drive, Minneapolis, MN 55417-2309. The initiative is an implementation and the deployment of new Electronic Health Record (EHR) system across federal entities and install additional Data Drop and Power Outlets (DDPO’s) as identified during the CSR assessment. The construction contractor shall supply all equipment, labor, materials, and supervision to complete project upgrades which includes the installation of Data Drops and Power Outlets, mounting of Over-Current Elements (OCE’s), Tracking Boards and Wall mounts. Conduct and incorporate pre-construction risk assessments (PCRA) and Infection Control Risk Assessments (ICRA) for air quality, infection control, noise, vibration, or any other hazards applicable to their work per Veterans Affairs (VA) Standard Environment of Care Standard (EC) 02 06 05. See ICRA Matrix of Precautions for Construction and Renovation. See Attachment 3 ICRA Assessments, Level 2 through 4 (three [3] total). Power and transmission cable pulls will be installed in separate raceways/conduits/ and or separated, per manufacturer performance data information. All data cabling to be Category CAT 6A. Install quantity (QTY) (29) CAT 6A cable drops from new Telecommunication Rooms (TRs) to identified locations. See Building Plan Views for 618-26-702 for room and wall locations of installs. Telecommunication Cable pulls/drops not to exceed 300 feet for estimating purposes. QTY (1) cable drop location will require QTY (29) CAT 6A cables to be pulled. The QTY (29) cable drops installed within wall space to be protected in conduit requiring demolition of a wall section, repair and paint finishing. Furnish and install wall boxes and cover plates as needed for network connections or power installations. Follow current telecommunication or efficient routing paths above or below ceiling from Telecommunications Room (TR) patch panels to wall room outlets. All cables shall be in continuous lengths for origin to destination and secured to cable support structures per National Electric Code (NEC) requirements. (Any and all Cable splices will have to be approved by the COR) All new CAT 6A cable installations shall be tested and certified. Certification reports shall be submitted to the COR Bi-Weekly. All new cable pulls to be terminated at both ends. Termination locations in TR closets will be identified by site Subject Matter Experts (SME’s) Contractor to follow current VA Standards for cable, patch panel, and outlet labeling. All labels to be machine generated (not hand-written) using labeling software or machine. Install QTY (50) duplex 120 Volts Alternating Current (VAC) emergency power sourced outlets. Contractor to consider emergency power installations not to exceed 250 feet. Contractor to conduct a load test in the nearest junction box to verify the suitability for both new and existing outlets. The combined loads in a circuit shall not exceed 80% of the circuit’s total load capacity. If extending from an existing junction box to surface mounted raceway, flexible conduit may be used if it does not exceed 6 feet in length. Analog Phone List. Contractor to complete all work in accordance with: VA standards and Construction Specifications. NEC Standards Office of Electronic Health Record Modernization (OEHRM) Site Infrastructure, and End user Device (EUD) requirements (Latest Revision) Office of Information Technology (OIT) Design Guide, and design templates Infrastructure Standard for Telecommunication Spaces (ISTS) (Latest Version). Replace any damaged ceiling tiles due to the course of work. Touchup/repair/paint and damaged walls or ceilings due to new installation of wire and cable, conduit installations,etc. This project shall be completed within Ninety-Five (95) calendar days once NTP is issued.

Read Full Official Summary

The intent of this project is to provide construction services for a Department of Veteran Affairs Electronic Health Records Modernization (EHRM) project initiative and a 2026 Current State Review (CSR) at the Minneapolis VA Medical Center, One Veterans Drive, Minneapolis, MN 55417-2309. The initiative is an implementation and the deployment of new Electronic Health Record (EHR) system across federal entities and install additional Data Drop and Power Outlets (DDPO’s) as identified during the CSR assessment. The construction contractor shall supply all equipment, labor, materials, and supervision to complete project upgrades which includes the installation of Data Drops and Power Outlets, mounting of Over-Current Elements (OCE’s), Tracking Boards and Wall mounts. Conduct and incorporate pre-construction risk assessments (PCRA) and Infection Control Risk Assessments (ICRA) for air quality, infection control, noise, vibration, or any other hazards applicable to their work per Veterans Affairs (VA) Standard Environment of Care Standard (EC) 02 06 05. See ICRA Matrix of Precautions for Construction and Renovation. See Attachment 3 ICRA Assessments, Level 2 through 4 (three [3] total). Power and transmission cable pulls will be installed in separate raceways/conduits/ and or separated, per manufacturer performance data information. All data cabling to be Category CAT 6A. Install quantity (QTY) (29) CAT 6A cable drops from new Telecommunication Rooms (TRs) to identified locations. See Building Plan Views for 618-26-702 for room and wall locations of installs. Telecommunication Cable pulls/drops not to exceed 300 feet for estimating purposes. QTY (1) cable drop location will require QTY (29) CAT 6A cables to be pulled. The QTY (29) cable drops installed within wall space to be protected in conduit requiring demolition of a wall section, repair and paint finishing. Furnish and install wall boxes and cover plates as needed for network connections or power installations. Follow current telecommunication or efficient routing paths above or below ceiling from Telecommunications Room (TR) patch panels to wall room outlets. All cables shall be in continuous lengths for origin to destination and secured to cable support structures per National Electric Code (NEC) requirements. (Any and all Cable splices will have to be approved by the COR) All new CAT 6A cable installations shall be tested and certified. Certification reports shall be submitted to the COR Bi-Weekly. All new cable pulls to be terminated at both ends. Termination locations in TR closets will be identified by site Subject Matter Experts (SME’s) Contractor to follow current VA Standards for cable, patch panel, and outlet labeling. All labels to be machine generated (not hand-written) using labeling software or machine. Install QTY (50) duplex 120 Volts Alternating Current (VAC) emergency power sourced outlets. Contractor to consider emergency power installations not to exceed 250 feet. Contractor to conduct a load test in the nearest junction box to verify the suitability for both new and existing outlets. The combined loads in a circuit shall not exceed 80% of the circuit’s total load capacity. If extending from an existing junction box to surface mounted raceway, flexible conduit may be used if it does not exceed 6 feet in length. Analog Phone List. Contractor to complete all work in accordance with: VA standards and Construction Specifications. NEC Standards Office of Electronic Health Record Modernization (OEHRM) Site Infrastructure, and End user Device (EUD) requirements (Latest Revision) Office of Information Technology (OIT) Design Guide, and design templates Infrastructure Standard for Telecommunication Spaces (ISTS) (Latest Version). Replace any damaged ceiling tiles due to the course of work. Touchup/repair/paint and damaged walls or ceilings due to new installation of wire and cable, conduit installations,etc. This project shall be completed within Ninety-Five (95) calendar days once NTP is issued.

Official SAM.gov Contract Opportunities file extract description for this notice. CaptureIQ does not generate or rewrite this text.

Related Federal Opportunities

Why this matters

  • This notice is a solicitation.
  • The listed response deadline is Jun 9, 2026.
  • 4 related opportunities share this NAICS.

Related federal terms

  • RFP — Request for Proposal
  • SDVOSB — Service-Disabled Veteran-Owned Small Business
  • NAICS — North American Industry Classification System

Market context

4 Related OpportunitiesMatching opportunities on RFPCapture

Related intelligence

Research and capture tools

This notice carries an explicit small-business set-aside designation.

← All federal opportunities · Federal Opportunity Research

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.