SAM.gov listing

Alliant 3 GWAC, Request for Proposal (RFP)

General Services Administration → Federal Acquisition Service → Gsa/its Gwacbranch A CONT OP QTACASolicitationSolicitation 47QTCB24R0009

Response deadline

Fri, Apr 11, 2025, 4:00 PM EDT
Analyze This Opportunity in CaptureIQ

Compare your company's capabilities against this federal opportunity using CaptureIQ.

Ready to Pursue This Opportunity?

Qualify the fit, analyze competitors, identify teaming partners, and generate review-ready materials — all in CaptureIQ.

  • Federal capture workflow
  • Competitor & teaming intelligence
  • Proposal preparation

Opportunity details

NAICS
541512
Notice type
Solicitation
Original posted
September 30, 2026
Last updated
October 18, 2026
Notice ID
48c1ef320f574fe6b18d9ed7ffd19d74

Summary

09/30/2026: Amendment 0014 will be issued on October 5, 2026 for Alliant 3 Request For Proposal (RFP), 47QTCB24R0009, to incorporate Revolutionary FAR Overhaul (RFO) changes to the solicitation. A signed SF-30 that acknowledges the amendment is required to remain eligible for award. Alliant 3, Phase 2 awards will be issued shortly after the amendment acknowledgement is due. ++++++++++++++++++ 05/07/2026: The Alliant 3 Team is committed to completing phase two awards by the end of the fiscal year. At this time, it has not been determined if additional phases will be necessary to achieve all 76 awards (plus ties) as we work through clarifications. If you have not received a request for clarifications, please note, the team is working on issuing clarifications as expeditiously as possible. ++++++++++++++++++ 04/15/2026: Update: GSA continues to evaluate proposals for issuing phase two awards. If you have not received a notice of award for phase one, your proposal remains under consideration; you have not been eliminated. We appreciate your patience as GSA works diligently to award the subsequent phases. ++++++++++++++++++ 04/02/2026: Amendment 0013 is issued to the Alliant 3 Conformed Request for Proposal (RFP), 47QTCB24R0009, which has been posted in the Symphony Proposal Intake System. This amendment is to extend the offer acceptance period for existing offerors. Offerors should login to the Symphony Portal and review for necessary action. This action is only applicable to existing offerors that submitted a timely proposal for the Alliant 3 GWAC. For any questions regarding this amendment, please email Alliant3@gsa.gov. +++++++++++++++++++ 02/25/2026: Alliant 3 GWAC Phase One awards are fully executed. The Government has started the evaluation of Phase Two and will expeditiously work through the subsequent phases. +++++++++++++++++++ 02/20/2026: Alliant 3 Governmentwide Acquisition Contract, Unrestricted Pool, Solicitation Number 47QTCB24R0009, Phase One Award Notice This is a written announcement to all interested parties. The U.S. General Services Administration (GSA) will make phase one contract award under the Alliant 3 Governmentwide Acquisition Contract (GWAC). GSA has determined a phased award approach for the Alliant 3 GWAC to be in the best interest of the Government and in accordance with Solicitation Section M.3, Evaluation Process. This announcement fulfills the notice requirements in FAR 5.3, Synopses of Contract Awards, as the first phase award notification for the Alliant 3 GWAC. GSA appreciates the robust competition for the Alliant 3 GWAC. There were 133 proposals received in response to the solicitation. After review and evaluation in accordance with the criteria established in the solicitation, GSA has determined to make phase one contract awards to 43 offerors that are eligible for award. Offerors not identified in the attached document, Alliant 3 Phase One Award Notice, were not selected for phase one contract award and remain eligible for further award phases until all 76 awards (plus ties) are complete. Please note, no offeror is eliminated from award consideration. GSA intends to proceed in phases as offerors are eligible for award. If you do not receive an award notification with this phase, please understand that your proposal is still under consideration and you have not been eliminated from competition. You will be notified of the status of your offer during a later award phase. Debriefing letters will be provided once all award phases are completed. Federal customers interested in the GSA GWAC Program should refer to the GSA GWAC webpage at www.gsa.gov/gwacs for more information about when the new Alliant 3 GWAC awardees will be able to accept task orders. The Notice to Proceed will be issued separately. The GSA GWAC webpage provides information on the various GSA GWAC features and benefits, such as how Federal Contracting Officers can obtain a Delegation of Procurement (DPA) training, scope compatibility reviews, and market research tools to assist your organization in the procurement process. Written correspondence may be sent to the Contracting Officer at alliant3@gsa.gov. +++++++++++++++++++ 01/09/2026: GSA intends to make Alliant 3 GWAC awards in Q2 of FY26, and further information will be released in the coming months. Thank you for your continued interest and patience. +++++++++++++++++++ 09/16/2025: Important Notice: All Offerors must monitor their Alliant 3, Symphony account for exchanges that may be sent to your company. It is imperative that all offerors respond back to the government by the date prescribed in the exchange module. Failure to do so may result in removal from consideration of award. If you require access to your Symphony account please contact Apex Logic Help Desk. +++++++++++++++++++ 04/11/25: Reminder: the Alliant 3 RFP, 47QTCB24R0009, proposal submission is due today at 4 pm ET. Please ensure your proposals are up-to-date with the latest SF30 information, which acknowledges amendment 12. In addition, please ensure your proposals are in a “submitted” status in Symphony. +++++++++++++++++++ 3/12/25: Amendment A0012 is issued to the Alliant 3 Conformed Request for Proposal (RFP), 47QTCB24R0009 to: Extend the Alliant 3 proposal due date from 3/31/2025 to 4/11/2025 Include Other Transactional Agreements (OTAs) and task orders placed under Basic Ordering Agreements (BOAs) as acceptable contract types in L.5.2.1, Relevant Experience Projects. Provide additional clarification on the timeliness regarding Systems, Certifications, and Clearances found in section L.5.4.6 through L.5.4.9. Please see the updated Alliant 3 RFP for updates: Alliant 3 RFP A0012 - Version 12 SF30 Amend 0012 Alliant 3 +++++++++++++++++++ 3/5/25: Amendment A0011 is issued to the Alliant 3 Conformed Request for Proposal (RFP), 47QTCB24R0009 to: (1) Extend the Alliant 3 proposal due date from 3/6/2025 to 3/31/2025. (2) Include FAR Clause 52.240-1, Prohibition on Unmanned Aircraft Systems Manufactured or Assembled by American Security Drone Act-Covered Foreign Entities. Please see the following Alliant 3 RFP attachments for updates: Alliant 3 RFP A0011 - Version 11 SF30 Amend 0011 Alliant 3 +++++++++++++++++++ 2/19/25: Amendment A0010 is issued to the Alliant 3 Conformed Request for Proposal (RFP), 47QTCB24R0009 to: (1) remove from Section L.4.1 Proposal Format, Table 22, row L.5.7.1, Public Disclosure of Greenhouse Gas Emission and Reduction Goals - Attestation, 2) allow the use of CTA member’s company name and UEI in place of the Offeror name and UEI on attachment J.P-2, A3 Primary NAICS Code Relevant Experience Project Template and J.P-3, A3 Emerging Technology Relevant Experience Project Template for federal projects (RFP Section L.5.3.2.1, L.5.2.4.2), 3) update FAR clauses located in Section K, Representation and Certifications, to be automatically updated in Symphony with no changes required from the Offeror. Please see the following Alliant 3 RFP attachments for updates: Alliant 3 RFP A0010 - Version 10 SF30 Amend 0010 Alliant 3 The Alliant 3 proposal due date is changed to March 6, 2025. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 2/11/25: Amendment A0009 is issued to the Alliant 3 Conformed Request for Proposal (RFP), 47QTCB24R0009 to comply with Executive Order 14154, Unleashing American Energy (January 20, 2025) and Executive Order 14148, Initial Rescissions of Harmful Executive Orders and Actions (January 20, 2025). The following areas are removed from the Alliant 3 RFP solicitation, and Symphony will be automatically updated to reflect the changes. No action is required from the Offeror as a result of the amendment. Alliant 3 (A3) Greenhouse Gas (GHG) evaluation points regarding Sustainability Related Disclosures. A3 Statement of Work requirements for Energy, Sustainability, and Environmental Management IT Services. A3 annual report of Environmental Objectives and Requirements. A3 requirement for contractors to provide Climate Risk Management Plans. J.P-15 A3 Climate Change Risk Management Plan Criteria (no longer required) Please see the following Alliant 3 RFP attachments for updates: Alliant 3 RFP A0009 - Version 9 SF30 Amend 0009 Alliant 3 J.P-16 Self-Scoring Worksheet V.5 The Alliant 3 proposal due date remains February 24, 2025. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 2/7/25: Suspending Enforcement of Contractual Greenhouse Gas and/or Climate Risk Requirements in Existing Solicitations. The General Services Administration (GSA) is taking action to reduce burden on Offerors on all requirements related to “climate-related risk management and/or greenhouse gas (GHG) emissions inventory and/or reduction target disclosure requirements”. This is in accordance with Executive Order 14154, Unleashing American Energy (January 20, 2025) and Executive Order 14148, Initial Rescissions of Harmful Executive Orders and Actions (January 20, 2025). GSA intends to take immediate action to begin the removal of: Alliant 3 (A3) Greenhouse Gas (GHG) evaluation points regarding Sustainability Related Disclosures. A3 Statement of Work requirements for Energy, Sustainability, and Environmental Management IT Services. A3 annual report of Environmental Objectives and Requirements. A3 requirement for contractors to provide Climate Risk Management Plans. This is a short term solution until the Alliant 3 solicitation is amended. We appreciate your continued cooperation and support. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 1/28/25: Amendment A0008 is issued to the Alliant 3 Conformed Request for Proposal (RFP), 47QTCB24R0009 to: (1) remove the Meaningful Relationship Commitment Letter (MRCL) project requirement (RFP Section L.5.1.5(f)(5)); (2) include the requirement to designate a Parent-Company Corporate Official empowered to resolve operational and consensus issues between the entity claiming the MRCL, and its Affiliate, Division or Subsidiary with which it claims a MRCL (RFP Section L.5.1.5(f)(5)); (3) update the previously performed project requirement for SBSubk SBCTAs to claim Organizational Risk Assessment points (L.5.6(b)). The Alliant 3 proposal due date is February 24, 2025. For any technical support related to Symphony, please visit the Alliant 3 Symphony helpdesk articles at https://apexlogic.freshdesk.com/support/solutions/35000149135 or contact the Apex Logic helpdesk at client.support@apexlogic.com. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 1/23/25: Amendment A0007 is issued to the Alliant 3 Conformed Request for Proposal (RFP), 47QTCB24R0009 to: (1) update the verification of Emerging Technology Relevant Experience projects performed as a subcontractor or under a previous/existing Contractor Teaming Arrangement (CTA) for Federal or Commercial projects (RFP Section L.5.2.4.2(d) and (e)); (2) update the Verification of Primary NAICS Code Relevant Experience Submission for Federal Government Contracts (RFP Section L.5.2.3.1); (3) provide clarity on the definition of a Meaningful Relationship Commitment Letter project (RFP Section L.5.1.5(f)(5)); (4) for federal contracts only, authorize the partial redaction of the attestation statement of cognizant Contracting Officers and Government Officials on Attachment J.P-3 (RFP Section L.5.2.4.2); (5) permit Offerors to password protect the GSA Form 527 and additional financial documents in order to provide Offerors with CTA members the option of submitting Financial Resources documentation required for Acceptability without disclosing sensitive financial information to other CTA members (RFP Section L.5.5.1). Offerors remain responsible for determining the Responsibility of their CTA members. If your organization has already submitted the GSA Form 527 via Symphony, no action is required. If your organization chooses to submit GSA Form 527 in a password protected format, the amended attachmen

Read Full Official Summary

09/30/2026: Amendment 0014 will be issued on October 5, 2026 for Alliant 3 Request For Proposal (RFP), 47QTCB24R0009, to incorporate Revolutionary FAR Overhaul (RFO) changes to the solicitation. A signed SF-30 that acknowledges the amendment is required to remain eligible for award. Alliant 3, Phase 2 awards will be issued shortly after the amendment acknowledgement is due. ++++++++++++++++++ 05/07/2026: The Alliant 3 Team is committed to completing phase two awards by the end of the fiscal year. At this time, it has not been determined if additional phases will be necessary to achieve all 76 awards (plus ties) as we work through clarifications. If you have not received a request for clarifications, please note, the team is working on issuing clarifications as expeditiously as possible. ++++++++++++++++++ 04/15/2026: Update: GSA continues to evaluate proposals for issuing phase two awards. If you have not received a notice of award for phase one, your proposal remains under consideration; you have not been eliminated. We appreciate your patience as GSA works diligently to award the subsequent phases. ++++++++++++++++++ 04/02/2026: Amendment 0013 is issued to the Alliant 3 Conformed Request for Proposal (RFP), 47QTCB24R0009, which has been posted in the Symphony Proposal Intake System. This amendment is to extend the offer acceptance period for existing offerors. Offerors should login to the Symphony Portal and review for necessary action. This action is only applicable to existing offerors that submitted a timely proposal for the Alliant 3 GWAC. For any questions regarding this amendment, please email Alliant3@gsa.gov. +++++++++++++++++++ 02/25/2026: Alliant 3 GWAC Phase One awards are fully executed. The Government has started the evaluation of Phase Two and will expeditiously work through the subsequent phases. +++++++++++++++++++ 02/20/2026: Alliant 3 Governmentwide Acquisition Contract, Unrestricted Pool, Solicitation Number 47QTCB24R0009, Phase One Award Notice This is a written announcement to all interested parties. The U.S. General Services Administration (GSA) will make phase one contract award under the Alliant 3 Governmentwide Acquisition Contract (GWAC). GSA has determined a phased award approach for the Alliant 3 GWAC to be in the best interest of the Government and in accordance with Solicitation Section M.3, Evaluation Process. This announcement fulfills the notice requirements in FAR 5.3, Synopses of Contract Awards, as the first phase award notification for the Alliant 3 GWAC. GSA appreciates the robust competition for the Alliant 3 GWAC. There were 133 proposals received in response to the solicitation. After review and evaluation in accordance with the criteria established in the solicitation, GSA has determined to make phase one contract awards to 43 offerors that are eligible for award. Offerors not identified in the attached document, Alliant 3 Phase One Award Notice, were not selected for phase one contract award and remain eligible for further award phases until all 76 awards (plus ties) are complete. Please note, no offeror is eliminated from award consideration. GSA intends to proceed in phases as offerors are eligible for award. If you do not receive an award notification with this phase, please understand that your proposal is still under consideration and you have not been eliminated from competition. You will be notified of the status of your offer during a later award phase. Debriefing letters will be provided once all award phases are completed. Federal customers interested in the GSA GWAC Program should refer to the GSA GWAC webpage at www.gsa.gov/gwacs for more information about when the new Alliant 3 GWAC awardees will be able to accept task orders. The Notice to Proceed will be issued separately. The GSA GWAC webpage provides information on the various GSA GWAC features and benefits, such as how Federal Contracting Officers can obtain a Delegation of Procurement (DPA) training, scope compatibility reviews, and market research tools to assist your organization in the procurement process. Written correspondence may be sent to the Contracting Officer at alliant3@gsa.gov. +++++++++++++++++++ 01/09/2026: GSA intends to make Alliant 3 GWAC awards in Q2 of FY26, and further information will be released in the coming months. Thank you for your continued interest and patience. +++++++++++++++++++ 09/16/2025: Important Notice: All Offerors must monitor their Alliant 3, Symphony account for exchanges that may be sent to your company. It is imperative that all offerors respond back to the government by the date prescribed in the exchange module. Failure to do so may result in removal from consideration of award. If you require access to your Symphony account please contact Apex Logic Help Desk. +++++++++++++++++++ 04/11/25: Reminder: the Alliant 3 RFP, 47QTCB24R0009, proposal submission is due today at 4 pm ET. Please ensure your proposals are up-to-date with the latest SF30 information, which acknowledges amendment 12. In addition, please ensure your proposals are in a “submitted” status in Symphony. +++++++++++++++++++ 3/12/25: Amendment A0012 is issued to the Alliant 3 Conformed Request for Proposal (RFP), 47QTCB24R0009 to: Extend the Alliant 3 proposal due date from 3/31/2025 to 4/11/2025 Include Other Transactional Agreements (OTAs) and task orders placed under Basic Ordering Agreements (BOAs) as acceptable contract types in L.5.2.1, Relevant Experience Projects. Provide additional clarification on the timeliness regarding Systems, Certifications, and Clearances found in section L.5.4.6 through L.5.4.9. Please see the updated Alliant 3 RFP for updates: Alliant 3 RFP A0012 - Version 12 SF30 Amend 0012 Alliant 3 +++++++++++++++++++ 3/5/25: Amendment A0011 is issued to the Alliant 3 Conformed Request for Proposal (RFP), 47QTCB24R0009 to: (1) Extend the Alliant 3 proposal due date from 3/6/2025 to 3/31/2025. (2) Include FAR Clause 52.240-1, Prohibition on Unmanned Aircraft Systems Manufactured or Assembled by American Security Drone Act-Covered Foreign Entities. Please see the following Alliant 3 RFP attachments for updates: Alliant 3 RFP A0011 - Version 11 SF30 Amend 0011 Alliant 3 +++++++++++++++++++ 2/19/25: Amendment A0010 is issued to the Alliant 3 Conformed Request for Proposal (RFP), 47QTCB24R0009 to: (1) remove from Section L.4.1 Proposal Format, Table 22, row L.5.7.1, Public Disclosure of Greenhouse Gas Emission and Reduction Goals - Attestation, 2) allow the use of CTA member’s company name and UEI in place of the Offeror name and UEI on attachment J.P-2, A3 Primary NAICS Code Relevant Experience Project Template and J.P-3, A3 Emerging Technology Relevant Experience Project Template for federal projects (RFP Section L.5.3.2.1, L.5.2.4.2), 3) update FAR clauses located in Section K, Representation and Certifications, to be automatically updated in Symphony with no changes required from the Offeror. Please see the following Alliant 3 RFP attachments for updates: Alliant 3 RFP A0010 - Version 10 SF30 Amend 0010 Alliant 3 The Alliant 3 proposal due date is changed to March 6, 2025. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 2/11/25: Amendment A0009 is issued to the Alliant 3 Conformed Request for Proposal (RFP), 47QTCB24R0009 to comply with Executive Order 14154, Unleashing American Energy (January 20, 2025) and Executive Order 14148, Initial Rescissions of Harmful Executive Orders and Actions (January 20, 2025). The following areas are removed from the Alliant 3 RFP solicitation, and Symphony will be automatically updated to reflect the changes. No action is required from the Offeror as a result of the amendment. Alliant 3 (A3) Greenhouse Gas (GHG) evaluation points regarding Sustainability Related Disclosures. A3 Statement of Work requirements for Energy, Sustainability, and Environmental Management IT Services. A3 annual report of Environmental Objectives and Requirements. A3 requirement for contractors to provide Climate Risk Management Plans. J.P-15 A3 Climate Change Risk Management Plan Criteria (no longer required) Please see the following Alliant 3 RFP attachments for updates: Alliant 3 RFP A0009 - Version 9 SF30 Amend 0009 Alliant 3 J.P-16 Self-Scoring Worksheet V.5 The Alliant 3 proposal due date remains February 24, 2025. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 2/7/25: Suspending Enforcement of Contractual Greenhouse Gas and/or Climate Risk Requirements in Existing Solicitations. The General Services Administration (GSA) is taking action to reduce burden on Offerors on all requirements related to “climate-related risk management and/or greenhouse gas (GHG) emissions inventory and/or reduction target disclosure requirements”. This is in accordance with Executive Order 14154, Unleashing American Energy (January 20, 2025) and Executive Order 14148, Initial Rescissions of Harmful Executive Orders and Actions (January 20, 2025). GSA intends to take immediate action to begin the removal of: Alliant 3 (A3) Greenhouse Gas (GHG) evaluation points regarding Sustainability Related Disclosures. A3 Statement of Work requirements for Energy, Sustainability, and Environmental Management IT Services. A3 annual report of Environmental Objectives and Requirements. A3 requirement for contractors to provide Climate Risk Management Plans. This is a short term solution until the Alliant 3 solicitation is amended. We appreciate your continued cooperation and support. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 1/28/25: Amendment A0008 is issued to the Alliant 3 Conformed Request for Proposal (RFP), 47QTCB24R0009 to: (1) remove the Meaningful Relationship Commitment Letter (MRCL) project requirement (RFP Section L.5.1.5(f)(5)); (2) include the requirement to designate a Parent-Company Corporate Official empowered to resolve operational and consensus issues between the entity claiming the MRCL, and its Affiliate, Division or Subsidiary with which it claims a MRCL (RFP Section L.5.1.5(f)(5)); (3) update the previously performed project requirement for SBSubk SBCTAs to claim Organizational Risk Assessment points (L.5.6(b)). The Alliant 3 proposal due date is February 24, 2025. For any technical support related to Symphony, please visit the Alliant 3 Symphony helpdesk articles at https://apexlogic.freshdesk.com/support/solutions/35000149135 or contact the Apex Logic helpdesk at client.support@apexlogic.com. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 1/23/25: Amendment A0007 is issued to the Alliant 3 Conformed Request for Proposal (RFP), 47QTCB24R0009 to: (1) update the verification of Emerging Technology Relevant Experience projects performed as a subcontractor or under a previous/existing Contractor Teaming Arrangement (CTA) for Federal or Commercial projects (RFP Section L.5.2.4.2(d) and (e)); (2) update the Verification of Primary NAICS Code Relevant Experience Submission for Federal Government Contracts (RFP Section L.5.2.3.1); (3) provide clarity on the definition of a Meaningful Relationship Commitment Letter project (RFP Section L.5.1.5(f)(5)); (4) for federal contracts only, authorize the partial redaction of the attestation statement of cognizant Contracting Officers and Government Officials on Attachment J.P-3 (RFP Section L.5.2.4.2); (5) permit Offerors to password protect the GSA Form 527 and additional financial documents in order to provide Offerors with CTA members the option of submitting Financial Resources documentation required for Acceptability without disclosing sensitive financial information to other CTA members (RFP Section L.5.5.1). Offerors remain responsible for determining the Responsibility of their CTA members. If your organization has already submitted the GSA Form 527 via Symphony, no action is required. If your organization chooses to submit GSA Form 527 in a password protected format, the amended attachmen

Official SAM.gov Contract Opportunities file extract excerpt for this notice. The stored text is the first 12,000 characters of the normalized official source, not the complete source body. CaptureIQ does not generate or rewrite this text.

Related Federal Opportunities

Why this matters

  • This notice is a solicitation.
  • The listed response deadline is Apr 11, 2025.
  • 1 related opportunity shares this NAICS.

Related federal terms

  • RFP — Request for Proposal
  • NAICS — North American Industry Classification System
  • PSC — Product Service Code

Market context

4 Related OpportunitiesMatching opportunities on RFPCapture

Related intelligence

Research and capture tools

This notice uses an IT NAICS or PSC classification documented in RFPCapture research.

← All federal opportunities · Federal Opportunity Research

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.