SAM.gov listing

Battery, Forklift EE Rated w/Cover, 36-90LM-21EE PAR Plate

Department of Defense → Department of the Army → AMC → ACC → Mission Installation Contracting Command.419th CSB → W6QM Micc-ft DRUMCombined Synopsis/SolicitationSolicitation W911S226U3113

Response deadline

Mon, May 4, 2026, 6:30 PM EDT

Product Service Code

PSC 6140
Analyze This Opportunity in CaptureIQ

Compare your company's capabilities against this federal opportunity using CaptureIQ.

Ready to Pursue This Opportunity?

Qualify the fit, analyze competitors, identify teaming partners, and generate review-ready materials — all in CaptureIQ.

  • Federal capture workflow
  • Competitor & teaming intelligence
  • Proposal preparation

Opportunity details

NAICS
335910
Notice type
Combined Synopsis/Solicitation
Set-aside
Total Small Business Set-Aside (FAR 19.5)
Original posted
April 27, 2026
Last updated
October 18, 2026
Notice ID
30b6d8e650d140af9cb6d01dea4d8491

Summary

2 Each Quantity Battery Forklift EE Rated w/Cover 36-90LM-21EE PAR Plate----Brand Name or Equal - Hawker Power Line Model 36-90LM-21EE PAR PLATE Current Forklift Information: Hyster Forklift Model E120ZSerial - E098N02477H Allowable battery weight 3600lb - 5550lb.Machine battery compartment opening:45 1/4 in. side to side 45 1/2 in. front to back (long)23 1/4 in. tall. --Cables exit the right front of battery box. a. 36-volt b.1800-amp hour c. 62.53-Kilowatt Hour Capacity @ 6-hour charge rated. Spark proof e. ? in Steel Case with Center Hinged Cover with Handles f. Type SB 350-amp 3/0 Gray connector, Position B, Length 30 in g. Acid Resistant Painted Steel Trays both Inside and out h. Weight ? 4738 pounds i. Heat Bonded Cells j. Uniform Acid Bath for Every Cell k. 5 Layer Retention System l. Flip Top Vent Caps m. End Case Lifting Brackets n. Micro-Porous Sleeved Separators o. Intercell Connector Covers p. Warranty ?5 Year Full Warranty, 1 year Pro-rated

Read Full Official Summary

2 Each Quantity Battery Forklift EE Rated w/Cover 36-90LM-21EE PAR Plate----Brand Name or Equal - Hawker Power Line Model 36-90LM-21EE PAR PLATE Current Forklift Information: Hyster Forklift Model E120ZSerial - E098N02477H Allowable battery weight 3600lb - 5550lb.Machine battery compartment opening:45 1/4 in. side to side 45 1/2 in. front to back (long)23 1/4 in. tall. --Cables exit the right front of battery box. a. 36-volt b.1800-amp hour c. 62.53-Kilowatt Hour Capacity @ 6-hour charge rated. Spark proof e. ? in Steel Case with Center Hinged Cover with Handles f. Type SB 350-amp 3/0 Gray connector, Position B, Length 30 in g. Acid Resistant Painted Steel Trays both Inside and out h. Weight ? 4738 pounds i. Heat Bonded Cells j. Uniform Acid Bath for Every Cell k. 5 Layer Retention System l. Flip Top Vent Caps m. End Case Lifting Brackets n. Micro-Porous Sleeved Separators o. Intercell Connector Covers p. Warranty ?5 Year Full Warranty, 1 year Pro-rated

Official SAM.gov Contract Opportunities file extract description for this notice. CaptureIQ does not generate or rewrite this text.

Related Federal Opportunities

Why this matters

  • This notice is a combined synopsis/solicitation.
  • The listed response deadline is May 4, 2026.
  • 1 related opportunity shares this NAICS.

Related federal terms

  • NAICS — North American Industry Classification System
  • PSC — Product Service Code

Market context

4 Related OpportunitiesMatching opportunities on RFPCapture

Related intelligence

Research and capture tools

This notice carries an explicit small-business set-aside designation.

← All federal opportunities · Federal Opportunity Research

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.