SAM.gov listing

Bavaria Hazardous Waste Disposal

Department of Defense → Defense Logistics Agency → DLA Disposition Services - EBSCombined Synopsis/SolicitationSolicitation SP450026R0013

Response deadline

Thu, Oct 15, 2026, 12:00 PM EDT
Analyze This Opportunity in CaptureIQ

Compare your company's capabilities against this federal opportunity using CaptureIQ.

Ready to Pursue This Opportunity?

Qualify the fit, analyze competitors, identify teaming partners, and generate review-ready materials — all in CaptureIQ.

  • Federal capture workflow
  • Competitor & teaming intelligence
  • Proposal preparation

Opportunity details

NAICS
562211
Notice type
Combined Synopsis/Solicitation
Set-aside
No Set aside used
Original posted
September 28, 2026
Last updated
October 18, 2026
Notice ID
69db7f6c5125449da6ee4fca0e04f6f5

Summary

*******Amendment 2 ****** This amendment extends the solicitation due date from Thursday, October 1, at 3:00 p.m. Eastern Time to Thursday, October 15, at 12:00 p.m. Eastern Time. Answers to submitted Questions: Question 1: How are waste streams classified for pesticides, herbicides, fungicides, and insecticides, and does the contract mandate specific disposal methods like incineration? Answer: The Generator is solely responsible for determining waste classifications and assigning the appropriate CLINs. The Generator makes these determinations using laboratory analysis, Safety Data Sheets (SDS), product designations, and internal process knowledge. Complete waste profile documentation and analytical reports will be fully accessible to the Prime Contractor upon contract award. The contract does not mandate specific disposal technologies, such as incineration, for these categories; the contractor must select and execute compliant treatment and disposal methods that strictly adhere to all applicable European and local regulatory guidelines. Question 2: How are the laboratory chemical service CLINs priced, and how do they interact with final disposal CLINs? Answer: CLINs with the SV suffix represent service-based tasks, specifically lab packing and loose packing. These are priced per container size rather than by weight. They are designed to be ordered in tandem with corresponding disposal CLINs on the Price Schedule to cover the final destruction of the packed materials. If the estimated quantities require adjustment during performance, the COR will coordinate modifications through established contract adjustment procedures. Question 3: How is the absence of PFAS verified in aqueous and fire extinguishing waste streams, and when will CPT plant analytical data be available? Answer: The absence of PFAS in fire extinguishing residues is verified prior to turn-in using Generator process knowledge and analytical testing. All testing and analytical documentation required for Chemical-Physical Treatment (CPT) plant acceptance will be provided to the Contractor post-award. Question 4: How do individual consignment weights for emulsions affect bulk versus containerized pricing? Answer: The contract utilizes suffix designations to define how waste must be packaged and priced. Suffix C8 denotes containerized waste, whereas suffix B8 denotes Bulk Waste. Individual turn-ins falling below the 5,000-liter bulk minimum must be priced and managed under the appropriate containerized (C8) CLINs, as the bulk (B8) CLINs are reserved for larger, consolidated bulk shipments. Question 5: Why does the bulk forecast for blasting media and heavy metal solids exceed historical turn-in data, and what is the basis for the estimate? Answer: The 30,000 kg estimate for CLIN HM01B8 was established based on historical requirements for bulk container placements (such as roll-off boxes, skips, and mulden exceeding 7 cubic meters) rather than individual loose container weights. Waste stream determinations are confirmed via process knowledge and testing, and detailed laboratory analyses will be furnished to the Prime Contractor post-award. Question 6: Is there a typographical error in the waste stream definitions in Attachment 2 regarding CLIN MS20B8? Answer: Yes. Row 54 of Attachment 2 has been corrected to resolve a copy-paste error. CLIN MS19C8 covers "Cleaning Compounds," while CLINs MS20B8 (bulk, 54,000 kg forecast) and MS20C8 (containerized, 13,529 kg forecast) are properly designated for "Antifreeze and Anti-Icing Compounds." The corrected table is as follows: CLIN Waste Category Corrected Description Forecasted Qty U/M MS19C8 Miscellaneous Wastes Cleaning Compounds, liquids and solids, including but not limited to furniture and equipment polish, rubbing compounds, metal cleaners, and wax. 100 KG MS20B8 Miscellaneous Wastes Antifreeze and Anti-Icing Compounds, including but not limited to products containing ethylene glycol and propylene glycol that may be contaminated with (but not limited to) dirt, oil, water, and fuel. 54,000 KG MS20C8 Miscellaneous Wastes Antifreeze and Anti-Icing Compounds, including but not limited to products containing ethylene glycol and propylene glycol that may be contaminated with (but not limited to) dirt, oil, water, and fuel. 13,529 KG Question 7: Are contractors required to provide standard waste containers, and what is the function of the container rental and placement CLINs? Answer: For containerized waste (C8 suffix), the contractor is required to furnish all packaging and containers as part of the standard disposal rate, which operates on a routine one-for-one swap basis. CLINs 1331RE through 1333RE are dedicated solely to Bulk Rental Containers (Roll-off boxes, Mulden, skips) used for bulk (B8 suffix) waste streams. For initial drops or episodic events, the contractor must coordinate with the COR to establish baselines and supply additional containers within the timelines required by PWS 3.11.3. Question 8: Why does USAG Garmisch share a Generator ID with USAG Bavaria in the attachments, and are the transportation truck forecasts accurate? Answer: The shared Generator ID in the initial attachments was an administrative error that has since been corrected by the COR. All shipping documentation and manifests for Garmisch must utilize the validated Garmisch Generator ID GEGI180E0478. The transportation truck forecasts (TRGR02 and TRGR04) are estimated frequencies based on historical operational planning and remain subject to actual task orders issued during performance. Question 9: Is the certification under FAR 52.222-56, together with a compliance plan under FAR 52.222-50 Alternate I, required with the offer? Answer: The certification under FAR 52.222-56 and the compliance plan required under FAR 52.222-50, Alternate I, are not required to be submitted with the offer. These requirements will be addressed upon selection for award, at which time the applicable details and expectations will be provided. Question 10: Do the items listed in Attachment 11 (c), together with the return of Attachment 14, constitute the complete set of documents required with the offer, and should Attachment 2 be submitted as issued with this discrepancy noted in the cover letter? Answer: The revised price schedule and pickup points are attached and must be included in accordance with the stated instructions. Question 11: Has compliance with the applicable Host Nation (HN), European Union (EU), ADR, IMDG, and German hazardous-waste requirements been ensured? The requirement appears to reference ADR, although shipments may occur only within Germany and therefore may be governed by GGVSE. Answer: Yes. The requirement is intended to ensure that the Contractor performs all hazardous-waste activities in compliance with applicable HN, EU, and international requirements. For shipments conducted solely within Germany, the applicable German implementation requirements, including GGVSE, apply as appropriate. Under those requirements, the waste generator remains responsible for proper waste classification, packaging, and labeling. The Contractor must perform transportation and disposal activities in compliance with all applicable laws, regulations, and contractual requirements. Question 12: Neither the PWS nor the Price Schedule identifies responsibility for container costs, the expected number of containers, or the types of containers required at each location. Answer: The Contractor is responsible for providing the containers necessary to collect, store, transport, and dispose of hazardous waste under this contract. The Price Schedule identifies estimated disposal quantities by waste stream; it does not establish a fixed container quantity for each pickup location. The Contractor must coordinate with the COR to establish baseline container requirements for each location, including the appropriate container types and quantities. The transportation section of the contract provides additional information regarding container support and transportation requirements. Question 13: Does this requirement apply only to drivers and, when industrial services are required, additional helpers? It appears that Waste Management Services (WMS) are no longer included in the contract. Answer: Waste Management Services are no longer included in the contract. However, the Contractor must provide qualified personnel for all work performed under the contract, including transportation and any authorized Special Services. Personnel assigned to perform a particular service must possess the qualifications, training, certifications, and licenses required by applicable HN laws, regulations, DoD policy, and the specific task requirements. Question 14: Activities requiring Technische Regeln für Gefahrstoffe 520 (TRGS 520) training do not appear to be covered by the contract. Are storage facilities or collection points still to be operated? Answer: Waste Management Services, including operation of storage facilities or collection points, are not part of this contract unless specifically ordered as a Special Service. The Contractor is nevertheless responsible for ensuring that all personnel performing contract requirements are trained to the level required by applicable laws, regulations, safety requirements, and the specific services being performed. If a Special Service requires TRGS 520 training or another specialized qualification, the Contractor must provide appropriately qualified personnel. Question 15: Most manifests are now digital and legally binding only in German. Can the Uniform Manifest be used instead? Answer: Yes. The Uniform Manifest may be used if it complies with applicable Host Nation laws and regulations. However, the contract requires the Contractor to provide an English-language version or translation of the applicable manifest and supporting shipping documents. Where a bilingual form is not available, the Contractor must provide the legally required German document along with an English translation or equivalent English-language documentation for the removal and invoice package. Question 16: There is no legal basis for submitting manifests five business days before removal, and the entries would only be estimates because final weights may change at pickup. Answer: The five-business-day advance submission requirement is a contractual requirement and is standard language in hazardous-waste disposal contracts. The purpose is to allow the COR and Installation Environmental Office (IEO) to review planned removals and maintain accurate waste-management records. Installations generally weigh containers before pickup, allowing the Contractor to prepare documentation based on known quantities and weights. If final quantities or weights change at pickup, the documentation may be corrected on site in accordance with established procedures. Question 17: With the new EU regulation effective May 21, 2026, and the requirement to use the Digital Waste Shipment System (DIWASS), it may no longer be possible to perform waste-shipment activities on behalf of third parties. Answer: The Contractor must comply with all applicable EU, Host Nation, and transboundary waste-shipment requirements, including DIWASS requirements when they apply. For transboundary shipments, the Contractor must ensure that it is properly registered, authorized, and vetted in DIWASS and that all required notifications, movement documents, approvals, and records are completed through the applicable system. The Contractor must perform its responsibilities as the legally recognized exporter, importer, transporter, or other required party, as applicable to the shipment. The Contractor may not rely on outdated paper-based processes or submit documents through an unauthorized third-party account. The Contractor must provide the COR with copies of notification applications and other required documentation Question 18: Is the Contractor responsible, at its own expens

Read Full Official Summary

*******Amendment 2 ****** This amendment extends the solicitation due date from Thursday, October 1, at 3:00 p.m. Eastern Time to Thursday, October 15, at 12:00 p.m. Eastern Time. Answers to submitted Questions: Question 1: How are waste streams classified for pesticides, herbicides, fungicides, and insecticides, and does the contract mandate specific disposal methods like incineration? Answer: The Generator is solely responsible for determining waste classifications and assigning the appropriate CLINs. The Generator makes these determinations using laboratory analysis, Safety Data Sheets (SDS), product designations, and internal process knowledge. Complete waste profile documentation and analytical reports will be fully accessible to the Prime Contractor upon contract award. The contract does not mandate specific disposal technologies, such as incineration, for these categories; the contractor must select and execute compliant treatment and disposal methods that strictly adhere to all applicable European and local regulatory guidelines. Question 2: How are the laboratory chemical service CLINs priced, and how do they interact with final disposal CLINs? Answer: CLINs with the SV suffix represent service-based tasks, specifically lab packing and loose packing. These are priced per container size rather than by weight. They are designed to be ordered in tandem with corresponding disposal CLINs on the Price Schedule to cover the final destruction of the packed materials. If the estimated quantities require adjustment during performance, the COR will coordinate modifications through established contract adjustment procedures. Question 3: How is the absence of PFAS verified in aqueous and fire extinguishing waste streams, and when will CPT plant analytical data be available? Answer: The absence of PFAS in fire extinguishing residues is verified prior to turn-in using Generator process knowledge and analytical testing. All testing and analytical documentation required for Chemical-Physical Treatment (CPT) plant acceptance will be provided to the Contractor post-award. Question 4: How do individual consignment weights for emulsions affect bulk versus containerized pricing? Answer: The contract utilizes suffix designations to define how waste must be packaged and priced. Suffix C8 denotes containerized waste, whereas suffix B8 denotes Bulk Waste. Individual turn-ins falling below the 5,000-liter bulk minimum must be priced and managed under the appropriate containerized (C8) CLINs, as the bulk (B8) CLINs are reserved for larger, consolidated bulk shipments. Question 5: Why does the bulk forecast for blasting media and heavy metal solids exceed historical turn-in data, and what is the basis for the estimate? Answer: The 30,000 kg estimate for CLIN HM01B8 was established based on historical requirements for bulk container placements (such as roll-off boxes, skips, and mulden exceeding 7 cubic meters) rather than individual loose container weights. Waste stream determinations are confirmed via process knowledge and testing, and detailed laboratory analyses will be furnished to the Prime Contractor post-award. Question 6: Is there a typographical error in the waste stream definitions in Attachment 2 regarding CLIN MS20B8? Answer: Yes. Row 54 of Attachment 2 has been corrected to resolve a copy-paste error. CLIN MS19C8 covers "Cleaning Compounds," while CLINs MS20B8 (bulk, 54,000 kg forecast) and MS20C8 (containerized, 13,529 kg forecast) are properly designated for "Antifreeze and Anti-Icing Compounds." The corrected table is as follows: CLIN Waste Category Corrected Description Forecasted Qty U/M MS19C8 Miscellaneous Wastes Cleaning Compounds, liquids and solids, including but not limited to furniture and equipment polish, rubbing compounds, metal cleaners, and wax. 100 KG MS20B8 Miscellaneous Wastes Antifreeze and Anti-Icing Compounds, including but not limited to products containing ethylene glycol and propylene glycol that may be contaminated with (but not limited to) dirt, oil, water, and fuel. 54,000 KG MS20C8 Miscellaneous Wastes Antifreeze and Anti-Icing Compounds, including but not limited to products containing ethylene glycol and propylene glycol that may be contaminated with (but not limited to) dirt, oil, water, and fuel. 13,529 KG Question 7: Are contractors required to provide standard waste containers, and what is the function of the container rental and placement CLINs? Answer: For containerized waste (C8 suffix), the contractor is required to furnish all packaging and containers as part of the standard disposal rate, which operates on a routine one-for-one swap basis. CLINs 1331RE through 1333RE are dedicated solely to Bulk Rental Containers (Roll-off boxes, Mulden, skips) used for bulk (B8 suffix) waste streams. For initial drops or episodic events, the contractor must coordinate with the COR to establish baselines and supply additional containers within the timelines required by PWS 3.11.3. Question 8: Why does USAG Garmisch share a Generator ID with USAG Bavaria in the attachments, and are the transportation truck forecasts accurate? Answer: The shared Generator ID in the initial attachments was an administrative error that has since been corrected by the COR. All shipping documentation and manifests for Garmisch must utilize the validated Garmisch Generator ID GEGI180E0478. The transportation truck forecasts (TRGR02 and TRGR04) are estimated frequencies based on historical operational planning and remain subject to actual task orders issued during performance. Question 9: Is the certification under FAR 52.222-56, together with a compliance plan under FAR 52.222-50 Alternate I, required with the offer? Answer: The certification under FAR 52.222-56 and the compliance plan required under FAR 52.222-50, Alternate I, are not required to be submitted with the offer. These requirements will be addressed upon selection for award, at which time the applicable details and expectations will be provided. Question 10: Do the items listed in Attachment 11 (c), together with the return of Attachment 14, constitute the complete set of documents required with the offer, and should Attachment 2 be submitted as issued with this discrepancy noted in the cover letter? Answer: The revised price schedule and pickup points are attached and must be included in accordance with the stated instructions. Question 11: Has compliance with the applicable Host Nation (HN), European Union (EU), ADR, IMDG, and German hazardous-waste requirements been ensured? The requirement appears to reference ADR, although shipments may occur only within Germany and therefore may be governed by GGVSE. Answer: Yes. The requirement is intended to ensure that the Contractor performs all hazardous-waste activities in compliance with applicable HN, EU, and international requirements. For shipments conducted solely within Germany, the applicable German implementation requirements, including GGVSE, apply as appropriate. Under those requirements, the waste generator remains responsible for proper waste classification, packaging, and labeling. The Contractor must perform transportation and disposal activities in compliance with all applicable laws, regulations, and contractual requirements. Question 12: Neither the PWS nor the Price Schedule identifies responsibility for container costs, the expected number of containers, or the types of containers required at each location. Answer: The Contractor is responsible for providing the containers necessary to collect, store, transport, and dispose of hazardous waste under this contract. The Price Schedule identifies estimated disposal quantities by waste stream; it does not establish a fixed container quantity for each pickup location. The Contractor must coordinate with the COR to establish baseline container requirements for each location, including the appropriate container types and quantities. The transportation section of the contract provides additional information regarding container support and transportation requirements. Question 13: Does this requirement apply only to drivers and, when industrial services are required, additional helpers? It appears that Waste Management Services (WMS) are no longer included in the contract. Answer: Waste Management Services are no longer included in the contract. However, the Contractor must provide qualified personnel for all work performed under the contract, including transportation and any authorized Special Services. Personnel assigned to perform a particular service must possess the qualifications, training, certifications, and licenses required by applicable HN laws, regulations, DoD policy, and the specific task requirements. Question 14: Activities requiring Technische Regeln für Gefahrstoffe 520 (TRGS 520) training do not appear to be covered by the contract. Are storage facilities or collection points still to be operated? Answer: Waste Management Services, including operation of storage facilities or collection points, are not part of this contract unless specifically ordered as a Special Service. The Contractor is nevertheless responsible for ensuring that all personnel performing contract requirements are trained to the level required by applicable laws, regulations, safety requirements, and the specific services being performed. If a Special Service requires TRGS 520 training or another specialized qualification, the Contractor must provide appropriately qualified personnel. Question 15: Most manifests are now digital and legally binding only in German. Can the Uniform Manifest be used instead? Answer: Yes. The Uniform Manifest may be used if it complies with applicable Host Nation laws and regulations. However, the contract requires the Contractor to provide an English-language version or translation of the applicable manifest and supporting shipping documents. Where a bilingual form is not available, the Contractor must provide the legally required German document along with an English translation or equivalent English-language documentation for the removal and invoice package. Question 16: There is no legal basis for submitting manifests five business days before removal, and the entries would only be estimates because final weights may change at pickup. Answer: The five-business-day advance submission requirement is a contractual requirement and is standard language in hazardous-waste disposal contracts. The purpose is to allow the COR and Installation Environmental Office (IEO) to review planned removals and maintain accurate waste-management records. Installations generally weigh containers before pickup, allowing the Contractor to prepare documentation based on known quantities and weights. If final quantities or weights change at pickup, the documentation may be corrected on site in accordance with established procedures. Question 17: With the new EU regulation effective May 21, 2026, and the requirement to use the Digital Waste Shipment System (DIWASS), it may no longer be possible to perform waste-shipment activities on behalf of third parties. Answer: The Contractor must comply with all applicable EU, Host Nation, and transboundary waste-shipment requirements, including DIWASS requirements when they apply. For transboundary shipments, the Contractor must ensure that it is properly registered, authorized, and vetted in DIWASS and that all required notifications, movement documents, approvals, and records are completed through the applicable system. The Contractor must perform its responsibilities as the legally recognized exporter, importer, transporter, or other required party, as applicable to the shipment. The Contractor may not rely on outdated paper-based processes or submit documents through an unauthorized third-party account. The Contractor must provide the COR with copies of notification applications and other required documentation Question 18: Is the Contractor responsible, at its own expens

Official SAM.gov Contract Opportunities file extract excerpt for this notice. The stored text is the first 12,000 characters of the normalized official source, not the complete source body. CaptureIQ does not generate or rewrite this text.

Related Federal Opportunities

Why this matters

  • This notice is a combined synopsis/solicitation.
  • The listed response deadline is Oct 15, 2026.
  • 3 related opportunities share this NAICS.

Related federal terms

  • NAICS — North American Industry Classification System
  • PSC — Product Service Code

Market context

4 Related OpportunitiesMatching opportunities on RFPCapture

Related intelligence

Research and capture tools

Contextual RFPCapture research and free tools related to this public federal page.

← All federal opportunities · Federal Opportunity Research

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.