SAM.gov listing

Construction Services for Bar Harbor Breakwater Repair Project, Bar Harbor, Maine

Department of Defense → Department of the Army → US Army Corps of Engineers → Engineer Division NORTH Atlantic → ENDIST NEW England → W2SD ENDIST NEW EnglandSolicitationSolicitation W912WJ26BA005

Response deadline

Tue, Dec 16, 2025, 1:00 PM EST
Analyze This Opportunity in CaptureIQ

Compare your company's capabilities against this federal opportunity using CaptureIQ.

Ready to Pursue This Opportunity?

Qualify the fit, analyze competitors, identify teaming partners, and generate review-ready materials — all in CaptureIQ.

  • Federal capture workflow
  • Competitor & teaming intelligence
  • Proposal preparation

Opportunity details

NAICS
237990
Notice type
Solicitation
Original posted
December 18, 2025
Last updated
October 19, 2026
Notice ID
c87d944db80747e9a3792fa9bf092314

Summary

The U.S. Army Corps of Engineers, New England District will be issuing an Invitation for Bids on for the Bar Harbor Breakwater Repair Project, Bar Harbor, Maine. This will be an unrestricted Invitation for Bid. The NAICS code for this procurement is 237990 with a size standard of $45M. The solicitation requirements and contract documents to include instructions for submission and the response date will be available on or about October 2025 with construction to begin in the spring of 2026. The anticipated period of performance is 14 months. The estimated construction cost is expected to range from $10,000,000 to $25,000,000.The Bar Harbor Breakwater extends approximately 2,500 linear feet southwest from Bald Porcupine Island and was constructed between 1889 and 1916. The final design of the breakwater consisted of a 20-ft crest at 11 ft MLLW with 1H:1V side slopes, although the crest width was only constructed to 10-ft wide. The proposed work consists of repairing two large portions and a few small areas of a rubble mound breakwater structure that has been damaged from storms since its completion in 1916.There are two (2) repairs areas plus multiple small minor repair areas. Repair Area 1 is approximately 800 feet long and Repair Area 2 is approximately 850 feet long. Repair Area 2 and the minor repair zones are optional items. Anticipated stone required for Repair Area 1 includes approximately 8,800 tons of 6-10 ton armor stone and for Repair Area 2, includes approximately 5,900 tons of 6-10 ton armor stone. The minor repair areas are isolated locations of damage that are estimated to need 2-3 new armor stones to restore the structure. The repair areas will be constructed with 1.5H:1V side slopes.The work includes mobilization and demobilization, the furnishment and delivery of stones, removal/rehandling/resetting of existing stones, and placement of armor stone for tie-in between the repair area and the existing structure. The reinforcement work will require substantial moving and rehandling of existing stones to obtain the required interlocking placement and construction tolerances.Construction, stone delivery, and access will be by water. Access to the breakwater by land is unavailable and no work should be completed from the crest of the breakwater. There are no time of year restrictions. Environmental coordination and permitting has been completed by the U.S. Army of Engineers, New England District. Low tide water depths in the vicinity of Repair Area 1 are approximately 10 feet and Repair Area 2 are approximately 50 feet, and the average tidal range is approximately 11 feet. The area is subject to wave action. No spudding or anchoring into the existing structure is permitted.

Read Full Official Summary

The U.S. Army Corps of Engineers, New England District will be issuing an Invitation for Bids on for the Bar Harbor Breakwater Repair Project, Bar Harbor, Maine. This will be an unrestricted Invitation for Bid. The NAICS code for this procurement is 237990 with a size standard of $45M. The solicitation requirements and contract documents to include instructions for submission and the response date will be available on or about October 2025 with construction to begin in the spring of 2026. The anticipated period of performance is 14 months. The estimated construction cost is expected to range from $10,000,000 to $25,000,000.The Bar Harbor Breakwater extends approximately 2,500 linear feet southwest from Bald Porcupine Island and was constructed between 1889 and 1916. The final design of the breakwater consisted of a 20-ft crest at 11 ft MLLW with 1H:1V side slopes, although the crest width was only constructed to 10-ft wide. The proposed work consists of repairing two large portions and a few small areas of a rubble mound breakwater structure that has been damaged from storms since its completion in 1916.There are two (2) repairs areas plus multiple small minor repair areas. Repair Area 1 is approximately 800 feet long and Repair Area 2 is approximately 850 feet long. Repair Area 2 and the minor repair zones are optional items. Anticipated stone required for Repair Area 1 includes approximately 8,800 tons of 6-10 ton armor stone and for Repair Area 2, includes approximately 5,900 tons of 6-10 ton armor stone. The minor repair areas are isolated locations of damage that are estimated to need 2-3 new armor stones to restore the structure. The repair areas will be constructed with 1.5H:1V side slopes.The work includes mobilization and demobilization, the furnishment and delivery of stones, removal/rehandling/resetting of existing stones, and placement of armor stone for tie-in between the repair area and the existing structure. The reinforcement work will require substantial moving and rehandling of existing stones to obtain the required interlocking placement and construction tolerances.Construction, stone delivery, and access will be by water. Access to the breakwater by land is unavailable and no work should be completed from the crest of the breakwater. There are no time of year restrictions. Environmental coordination and permitting has been completed by the U.S. Army of Engineers, New England District. Low tide water depths in the vicinity of Repair Area 1 are approximately 10 feet and Repair Area 2 are approximately 50 feet, and the average tidal range is approximately 11 feet. The area is subject to wave action. No spudding or anchoring into the existing structure is permitted.

Official SAM.gov Contract Opportunities file extract description for this notice. CaptureIQ does not generate or rewrite this text.

Related Federal Opportunities

Why this matters

  • This notice is a solicitation.
  • The listed response deadline is Dec 16, 2025.
  • 4 related opportunities share this NAICS.

Related federal terms

  • RFP — Request for Proposal
  • NAICS — North American Industry Classification System
  • PSC — Product Service Code

Market context

4 Related OpportunitiesMatching opportunities on RFPCapture

Related intelligence

Research and capture tools

Contextual RFPCapture research and free tools related to this public federal page.

← All federal opportunities · Federal Opportunity Research

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.