SAM.gov listing

DOCK AND DECK PLATE REPAIR

Veterans Affairs, Department Of.246-network Contracting Office 6 (36c246)SolicitationSolicitation 36C24626Q0889

Response deadline

Tue, Sep 15, 2026, 5:00 PM EDT
Analyze This Opportunity in CaptureIQ

Compare your company's capabilities against this federal opportunity using CaptureIQ.

Ready to Pursue This Opportunity?

Qualify the fit, analyze competitors, identify teaming partners, and generate review-ready materials — all in CaptureIQ.

  • Federal capture workflow
  • Competitor & teaming intelligence
  • Proposal preparation

Opportunity details

NAICS
238990
Notice type
Solicitation
Set-aside
Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
Original posted
September 2, 2026
Last updated
October 18, 2026
Notice ID
003323f2608c4bd98f3cb0671e16a802

Summary

Department of Veterans Affairs Salem VA Medical Center 1970?Roanoke?Blvd,?Salem,?VA?24153 Statement of Work (SOW) Project Title:?Dock and Dock Plate Replacement – Buildings?14?&?15 Facility:?Salem?VA?Medical?Center (VAMC) Date:?May?14,?2026 1.?Scope?of?Work The contractor shall furnish all labor, materials, equipment, and supervision required to remove and replace existing dock plates and perform associated concrete and structural work at Buildings?14?and?15, Salem?VAMC. All work shall comply with VA standards, local building codes, and OSHA safety requirements. 2.?Description?of?Work Building?14 Remove existing dock plate. Sawcut and remove approximately 14?ft?×?50?ft?of?asphalt. Remove approximately 50?ft?of?existing curb. Excavate for new footing at existing dock wall to extend dock area. Form and pour new 4?ft?×?1?ft?×?14?ft?retaining wall with 4×4?steel angle on edge. Form and pour new 6?in?×?18?in?×?50?ft?curb. Form and pour new concrete drive (14?ft?×?50?ft?×?6?in), sloped to allow trucks to back up level with dock. Extend existing handrail by 2?ft. Install new 4?in?×?10?in?×?14?in?rubber dock bumpers. Building?15 Remove existing pit leveler and associated equipment. Infill existing pit with #57?gravel. Sawcut back of pit at cantilever. Pour new 4?in?concrete slab pinned to existing foundation. Install new 4?in?×?4?in?pit leveler frame and pour concrete perimeter. Install new 6?ft?×?8?ft?hydraulic pit leveler and 4?in?×?10?in?×?14?in?dock bumpers. 3.?Performance?Standards All work shall: Meet VA design and construction standards. Comply with Applicable Sections of the VA Electrical, Structural, and Safety Guidelines. Be executed following OSHA safety practices. Be completed per approved construction drawings and specifications. Ensure new concrete and metal installations are level, aligned, and finished to VA quality standards. 4.?Schedule?and?Coordination Work schedule shall be coordinated with the VA Engineering Service prior to mobilization. Contractor shall provide a minimum 48-hour work notice for any activity affecting operations. Access to work areas shall be limited to authorized personnel only. 5.?Safety?and?Environmental?Requirements The contractor shall maintain a safe work environment at all times. All waste materials shall be removed and disposed of in accordance with EPA and local regulations. Contractor shall ensure dust control and minimal disruption to medical center operations. 6.?Inspection?and?Acceptance All work will be inspected by the VA contracting officer’s representative (COR). Final acceptance will occur after successful inspection and demonstration of functionality of all installed components. Period of Performance is 120 days from issuance of Notice to Proceed (NTP).

Read Full Official Summary

Department of Veterans Affairs Salem VA Medical Center 1970?Roanoke?Blvd,?Salem,?VA?24153 Statement of Work (SOW) Project Title:?Dock and Dock Plate Replacement – Buildings?14?&?15 Facility:?Salem?VA?Medical?Center (VAMC) Date:?May?14,?2026 1.?Scope?of?Work The contractor shall furnish all labor, materials, equipment, and supervision required to remove and replace existing dock plates and perform associated concrete and structural work at Buildings?14?and?15, Salem?VAMC. All work shall comply with VA standards, local building codes, and OSHA safety requirements. 2.?Description?of?Work Building?14 Remove existing dock plate. Sawcut and remove approximately 14?ft?×?50?ft?of?asphalt. Remove approximately 50?ft?of?existing curb. Excavate for new footing at existing dock wall to extend dock area. Form and pour new 4?ft?×?1?ft?×?14?ft?retaining wall with 4×4?steel angle on edge. Form and pour new 6?in?×?18?in?×?50?ft?curb. Form and pour new concrete drive (14?ft?×?50?ft?×?6?in), sloped to allow trucks to back up level with dock. Extend existing handrail by 2?ft. Install new 4?in?×?10?in?×?14?in?rubber dock bumpers. Building?15 Remove existing pit leveler and associated equipment. Infill existing pit with #57?gravel. Sawcut back of pit at cantilever. Pour new 4?in?concrete slab pinned to existing foundation. Install new 4?in?×?4?in?pit leveler frame and pour concrete perimeter. Install new 6?ft?×?8?ft?hydraulic pit leveler and 4?in?×?10?in?×?14?in?dock bumpers. 3.?Performance?Standards All work shall: Meet VA design and construction standards. Comply with Applicable Sections of the VA Electrical, Structural, and Safety Guidelines. Be executed following OSHA safety practices. Be completed per approved construction drawings and specifications. Ensure new concrete and metal installations are level, aligned, and finished to VA quality standards. 4.?Schedule?and?Coordination Work schedule shall be coordinated with the VA Engineering Service prior to mobilization. Contractor shall provide a minimum 48-hour work notice for any activity affecting operations. Access to work areas shall be limited to authorized personnel only. 5.?Safety?and?Environmental?Requirements The contractor shall maintain a safe work environment at all times. All waste materials shall be removed and disposed of in accordance with EPA and local regulations. Contractor shall ensure dust control and minimal disruption to medical center operations. 6.?Inspection?and?Acceptance All work will be inspected by the VA contracting officer’s representative (COR). Final acceptance will occur after successful inspection and demonstration of functionality of all installed components. Period of Performance is 120 days from issuance of Notice to Proceed (NTP).

Official SAM.gov Contract Opportunities file extract description for this notice. CaptureIQ does not generate or rewrite this text.

Related Federal Opportunities

Why this matters

  • This notice is a solicitation.
  • The listed response deadline is Sep 15, 2026.
  • 4 related opportunities share this NAICS.

Related federal terms

  • RFP — Request for Proposal
  • SDVOSB — Service-Disabled Veteran-Owned Small Business
  • NAICS — North American Industry Classification System

Market context

4 Related OpportunitiesMatching opportunities on RFPCapture

Related intelligence

Research and capture tools

This notice carries an explicit small-business set-aside designation.

← All federal opportunities · Federal Opportunity Research

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.