Response deadline
Wed, Feb 25, 2026, 4:00 PM ESTDROP STATION
Compare your company's capabilities against this federal opportunity using CaptureIQ.
Opportunity details
- NAICS
- 333923
- Notice type
- Combined Synopsis/Solicitation
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- Original posted
- February 17, 2026
- Last updated
- October 19, 2026
- Notice ID
- c16cb6496edd4a6a86cef50de39289cc
Summary
Update 0003 is for Extending the due date Southern Systems Industrial Conveyors Mark No. 12402-WA96-1.5.7Loader Drop Rail Section with Stop Assembly The loader drop rail section with stop assembly includes the rail transfer section to bridge the monorail gap, position locking hardware and controls, lift arm connection and engagement, and the pushout connection to fully utilize all aspects of the system. This item is part of the existing monorail system, and all components and controls must integrate seamlessly to fully function the system. The load rating must match the existing unit as well (2,000 lbs.) with a standard F.O.S., and the trolley type and corresponding wheel profile must offer seamless movement at the monorail transition points. The original job that this was manufactured from at Southern Systems Industrial Conveyors is M-12-402-E.Note: To include pneumatic tubing and fittings
Read Full Official Summary
Update 0003 is for Extending the due date Southern Systems Industrial Conveyors Mark No. 12402-WA96-1.5.7Loader Drop Rail Section with Stop Assembly The loader drop rail section with stop assembly includes the rail transfer section to bridge the monorail gap, position locking hardware and controls, lift arm connection and engagement, and the pushout connection to fully utilize all aspects of the system. This item is part of the existing monorail system, and all components and controls must integrate seamlessly to fully function the system. The load rating must match the existing unit as well (2,000 lbs.) with a standard F.O.S., and the trolley type and corresponding wheel profile must offer seamless movement at the monorail transition points. The original job that this was manufactured from at Southern Systems Industrial Conveyors is M-12-402-E.Note: To include pneumatic tubing and fittings
Related Federal Opportunities
Why this matters
- This notice is a combined synopsis/solicitation.
- The listed response deadline is Feb 25, 2026.
- 4 related opportunities share this NAICS.
Related federal terms
Market context
4 Related OpportunitiesMatching opportunities on RFPCapture