SAM.gov listing

DRYDOCKING AND REPAIR OF SURVEY VESSEL DAMRELL

Department of Defense → Department of the Army → US Army Corps of Engineers → Engineer Division SOUTH Atlantic → ENDIST MOBILE → W074 ENDIST MOBILESources SoughtSolicitation W9127826QA006

Response deadline

Thu, Feb 19, 2026, 4:00 PM EST
Analyze This Opportunity in CaptureIQ

Compare your company's capabilities against this federal opportunity using CaptureIQ.

Ready to Pursue This Opportunity?

Qualify the fit, analyze competitors, identify teaming partners, and generate review-ready materials — all in CaptureIQ.

  • Federal capture workflow
  • Competitor & teaming intelligence
  • Proposal preparation

Opportunity details

NAICS
336611
Notice type
Sources Sought
Original posted
February 12, 2026
Last updated
October 19, 2026
Notice ID
52afdd4efd674a0f8f5e33298c62a01d

Summary

Market Research and Sources Sought Notice for information on capability and availability of potential contractors interested in proposing on a Firm Fixed Price Contract to Dry Dock and perform Repairs to S/V DAMRELL, between Pensacola, FL and Gulfport, MS. The scope of the work consists of dry-docking the S/V DAMRELL and performing the repairs and other work described by these Technical Specifications. The contractor will furnish all labor, materials, fittings, tools, power, lubricants, fuel, water, etc., necessary to accomplish the work within the time period specified. The contractor will also furnish the necessary facilities for and bear the expense of any movement of the plant while it is in his possession. The contractor shall provide and bear the expense of shore power to the vessel while it is at the facility of the contractor. The contractor shall bear the expense of any electricity needed to complete this work. Should the removal or shifting of any parts of the plant or its fittings, stores, fuel, water, etc., be necessary for the carrying out of the repairs specified, the same shall be done by the contractor and all such removals shall be subsequently replaced and any damage or loss resulting there from shall be made good by the contractor at his expense. The contractor shall bear the cost of storing any fuel, oil, or other materials. The contractor should propose an all-inclusive cost for each CLIN to perform the entire job, unless specifically stated otherwise. Should any portion of the structure, fixtures or equipment of the plant require alteration in order to carry out the work, the contractor shall notify the government to discuss options for how to address within the cost constraints of the work item. The contractor will provide a minimum full one year warranty on all parts, products and workmanship. Should any portion of the structure, fixtures or equipment of the plant require alteration to carry out the work, even though not specifically mentioned herein, the contractor shall make such alterations at his expense. The S/V DAMRELL is an aluminum, hydrofoil assisted, catamaran survey vessel. Her general dimensions are as follows: length of 69 feet, beam of 24 feet-5 inches, depth molded of 9 feet-5 and one-quarter inches, maximum displacement of 110,000 lbs. Due to the sensitive nature of the hull mounted transducers and special arrangement of the hull with the hydrofoils, the vessel is to be hauled out of the water with a marine travel lift only.

Read Full Official Summary

Market Research and Sources Sought Notice for information on capability and availability of potential contractors interested in proposing on a Firm Fixed Price Contract to Dry Dock and perform Repairs to S/V DAMRELL, between Pensacola, FL and Gulfport, MS. The scope of the work consists of dry-docking the S/V DAMRELL and performing the repairs and other work described by these Technical Specifications. The contractor will furnish all labor, materials, fittings, tools, power, lubricants, fuel, water, etc., necessary to accomplish the work within the time period specified. The contractor will also furnish the necessary facilities for and bear the expense of any movement of the plant while it is in his possession. The contractor shall provide and bear the expense of shore power to the vessel while it is at the facility of the contractor. The contractor shall bear the expense of any electricity needed to complete this work. Should the removal or shifting of any parts of the plant or its fittings, stores, fuel, water, etc., be necessary for the carrying out of the repairs specified, the same shall be done by the contractor and all such removals shall be subsequently replaced and any damage or loss resulting there from shall be made good by the contractor at his expense. The contractor shall bear the cost of storing any fuel, oil, or other materials. The contractor should propose an all-inclusive cost for each CLIN to perform the entire job, unless specifically stated otherwise. Should any portion of the structure, fixtures or equipment of the plant require alteration in order to carry out the work, the contractor shall notify the government to discuss options for how to address within the cost constraints of the work item. The contractor will provide a minimum full one year warranty on all parts, products and workmanship. Should any portion of the structure, fixtures or equipment of the plant require alteration to carry out the work, even though not specifically mentioned herein, the contractor shall make such alterations at his expense. The S/V DAMRELL is an aluminum, hydrofoil assisted, catamaran survey vessel. Her general dimensions are as follows: length of 69 feet, beam of 24 feet-5 inches, depth molded of 9 feet-5 and one-quarter inches, maximum displacement of 110,000 lbs. Due to the sensitive nature of the hull mounted transducers and special arrangement of the hull with the hydrofoils, the vessel is to be hauled out of the water with a marine travel lift only.

Official SAM.gov Contract Opportunities file extract description for this notice. CaptureIQ does not generate or rewrite this text.

Related Federal Opportunities

Why this matters

  • This notice is a sources sought.
  • The listed response deadline is Feb 19, 2026.
  • 4 related opportunities share this NAICS.

Related federal terms

  • RFI — Request for Information
  • NAICS — North American Industry Classification System
  • PSC — Product Service Code

Market context

4 Related OpportunitiesMatching opportunities on RFPCapture

Related intelligence

Research and capture tools

7-day response window — compare with federal posting-to-deadline benchmarks.

← All federal opportunities · Federal Opportunity Research

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.