SAM.gov listing

Formal RFP for WWYK200131 - Repair Chilled Water System, Bldg. 2280

Department of Defense → Department of the Air Force → AIR Force Materiel Command → AIR Force Sustainment CENTER → FA8137 AFSC PZIOCSolicitationSolicitation FA813726R0010

Response deadline

Mon, Jul 27, 2026, 6:00 PM EDT
Analyze This Opportunity in CaptureIQ

Compare your company's capabilities against this federal opportunity using CaptureIQ.

Ready to Pursue This Opportunity?

Qualify the fit, analyze competitors, identify teaming partners, and generate review-ready materials — all in CaptureIQ.

  • Federal capture workflow
  • Competitor & teaming intelligence
  • Proposal preparation

Opportunity details

NAICS
236220
Notice type
Solicitation
Set-aside
Small Business Set Aside - Total
Original posted
July 20, 2026
Last updated
October 18, 2026
Notice ID
94d38fa3685e469aab455ab470e9da27

Summary

This requirement is to be solicited as a total small business set-aside. The work to be performed under the terms of this contract consists of furnishing all materials, labor, plant, tools, transportation, equipment, testing services, quality control and incidentals required to accomplish the repair of the chilled water system at B2280 at Tinker Air Force Base (AFB), Oklahoma (project drawings can be provided to interested vendors for additional location and schematic information). Contact the primary or secondary point of contact to request project drawings. This is a construction-only contract. The Contractor shall be responsible for identifying the necessary logistical, architectural, and structural work elements required to perform the work as described herein. Assemblies, framework, fixtures, or apparatus not readily identified on the project drawings, specifications, or the Statement of Work (SOW) shall be provided by the Contractor as required for a complete, fully operating, and functioning system or systems ready for use by the Government. Information such as floor plan layouts and dimensions; structural, mechanical, and electrical data; and location of underground utilities provided by the Government for existing and new construction are based on available as-built documentation, field observation, and equipment selected as design basis by the Government. This information is to be considered approximate and shall be field verified by the Contractor. This project will require contractor personnel to perform work and/or operate vehicles on flight lines, runways, taxiways, parking ramps or in aircraft hangers or maintenance areas. Thus, all contractor personnel will be required to receive FOD awareness training in accordance with Tinker Air Force Base Instruction (Tinker AFBI) 21-100. IAW National Institute of Standards and Technology (NIST) Special Publication (SP) 800-171, the requirement does not include CUI to reside on or transit through contractor and/or subcontractor systems. Site visit attendance is mandatory to be considered responsive. RSVP email confirmation of intent to attend site visit to the primary and secondary points of contact with Entry Authorization List (EAL) information is due by 11:59 PM CST, Monday, March 30th, 2026. If a Contractor/Subcontractor fails to meet this deadline, the site visit information will not be released to your organization. Contract documents not able to be uploaded to SAM.gov will be provided to contractors who RSVP'd their intent to attend the initial site visit. Attachments include an EAL spreadsheet, please fill-in all information for individuals who will need/do not currently have Base access. Please ensure all information requested in the EAL is filled out accurately and full names matching state-issued IDs are utilized to assure Security Forces can process the requests for Base Access in a timely manner. If an individual has Base access, their name is all the information needed. Please try to limit your parties to seven attendees per Contractor. The requirement will be awarded in accordance with Two-Step Sealed Bidding procedures (FAR 52.214-25) which calls for the initial submission of technical-only proposals before submission of price bids. As such, please plan on coordinating all necessary personnel and/or subcontractors whose assessment of the requirement will have an impact on the technical proposal and subsequent priced proposal. An additional site visit will not occur between receipt of the technical proposals and submission of price bids. The site visit is scheduled for April 10th, 2026 at 10:00 A.M. We will meet outside of the airfield walk gate just north of Bldg. 2280 at 10:00 A.M. More specific meeting details have been shared with vendors who have sent an RSVP. The due date for the RFIs arising from the initial site visit is April 21st, 2026 at 11:59 P.M. Please submit all RFIs to the primary and secondary points of contact. RFIs will be answered in a timely manner, and RFI responses will be shared with all site visit attendees. All RFI responses have been received and compiled. Please see the attachments for the RFI responses and their associated documents. Utilize these in continuing to formulate your Step One Technical Proposals. This notice signifies the release of the formal RFP for Project No. WWYK200131 - Repair Chilled Water System, Bldg. 2280. The due date for Step One Techincal Proposals has been extended to June 15th, 2026 at 5:00 PM CST. Please see the attachments for the formal RFP as well as the attachments referenced in the body of the formal RFP. Responses to previously received RFIs may warrant revisions to associated RFP documents so be sure to monitor this SAM posting for updates. The revised RFI responses are now attached. The responses provide additional clarification on some replies for utilization by offerors in formulating their Step One Technical Proposals. The revised responses are highlighted. Please reach out to the primary or secondary point of contact should you have more questions regarding the responses. An amendment to the formal RFP and a revision to Section L - Instructions to Bidders has been issued to update the amount of the bid guarantee to encourage offeror participation to the maximum extent possible. The due date for Step One Technical Proposals has not been extended, and all other terms and conditions of the solicitation and Section L remain unchanged and in full force and effect. Please refer to the amended RFP and revised Section L in the attachments section of this notice for more information. An additional amendment has been made to the formal RFP to extend the due date for Step One Technical Proposals to June 15th, 2026 at 5:00 PM CST. This is to allow offerors additional time to assess equipment selection, availability, and associated pricing. Supplemental verbiage has also been added to the specifications to provide additional guidance for connecting the controls to the front end of the chilled water system. All other terms and conditions of the solicitation and associated documents remain unchanged and in full force and effect. Please refer to the amended RFP and the revised specifications in the attachments section of this notice for more information. Point of clarification: The bid guarantee isn't required until Step Two Priced Bids are due. Offerors may acquire a bonding letter from their surety as an assurance, but it is not mandatory. Failure to furnish a bid guarantee in the proper amount may be a cause for rejection of an offeror's bid. The review of Step One proposals continues to ensure competition to the maximum extent possible. To clarify, in no way will the continued proposal reviews rescind any already successful offeror's acceptability. The reviews should conclude the week of 7/19/26, and a new Step Two Priced Bid dude date will be announced.

Read Full Official Summary

This requirement is to be solicited as a total small business set-aside. The work to be performed under the terms of this contract consists of furnishing all materials, labor, plant, tools, transportation, equipment, testing services, quality control and incidentals required to accomplish the repair of the chilled water system at B2280 at Tinker Air Force Base (AFB), Oklahoma (project drawings can be provided to interested vendors for additional location and schematic information). Contact the primary or secondary point of contact to request project drawings. This is a construction-only contract. The Contractor shall be responsible for identifying the necessary logistical, architectural, and structural work elements required to perform the work as described herein. Assemblies, framework, fixtures, or apparatus not readily identified on the project drawings, specifications, or the Statement of Work (SOW) shall be provided by the Contractor as required for a complete, fully operating, and functioning system or systems ready for use by the Government. Information such as floor plan layouts and dimensions; structural, mechanical, and electrical data; and location of underground utilities provided by the Government for existing and new construction are based on available as-built documentation, field observation, and equipment selected as design basis by the Government. This information is to be considered approximate and shall be field verified by the Contractor. This project will require contractor personnel to perform work and/or operate vehicles on flight lines, runways, taxiways, parking ramps or in aircraft hangers or maintenance areas. Thus, all contractor personnel will be required to receive FOD awareness training in accordance with Tinker Air Force Base Instruction (Tinker AFBI) 21-100. IAW National Institute of Standards and Technology (NIST) Special Publication (SP) 800-171, the requirement does not include CUI to reside on or transit through contractor and/or subcontractor systems. Site visit attendance is mandatory to be considered responsive. RSVP email confirmation of intent to attend site visit to the primary and secondary points of contact with Entry Authorization List (EAL) information is due by 11:59 PM CST, Monday, March 30th, 2026. If a Contractor/Subcontractor fails to meet this deadline, the site visit information will not be released to your organization. Contract documents not able to be uploaded to SAM.gov will be provided to contractors who RSVP'd their intent to attend the initial site visit. Attachments include an EAL spreadsheet, please fill-in all information for individuals who will need/do not currently have Base access. Please ensure all information requested in the EAL is filled out accurately and full names matching state-issued IDs are utilized to assure Security Forces can process the requests for Base Access in a timely manner. If an individual has Base access, their name is all the information needed. Please try to limit your parties to seven attendees per Contractor. The requirement will be awarded in accordance with Two-Step Sealed Bidding procedures (FAR 52.214-25) which calls for the initial submission of technical-only proposals before submission of price bids. As such, please plan on coordinating all necessary personnel and/or subcontractors whose assessment of the requirement will have an impact on the technical proposal and subsequent priced proposal. An additional site visit will not occur between receipt of the technical proposals and submission of price bids. The site visit is scheduled for April 10th, 2026 at 10:00 A.M. We will meet outside of the airfield walk gate just north of Bldg. 2280 at 10:00 A.M. More specific meeting details have been shared with vendors who have sent an RSVP. The due date for the RFIs arising from the initial site visit is April 21st, 2026 at 11:59 P.M. Please submit all RFIs to the primary and secondary points of contact. RFIs will be answered in a timely manner, and RFI responses will be shared with all site visit attendees. All RFI responses have been received and compiled. Please see the attachments for the RFI responses and their associated documents. Utilize these in continuing to formulate your Step One Technical Proposals. This notice signifies the release of the formal RFP for Project No. WWYK200131 - Repair Chilled Water System, Bldg. 2280. The due date for Step One Techincal Proposals has been extended to June 15th, 2026 at 5:00 PM CST. Please see the attachments for the formal RFP as well as the attachments referenced in the body of the formal RFP. Responses to previously received RFIs may warrant revisions to associated RFP documents so be sure to monitor this SAM posting for updates. The revised RFI responses are now attached. The responses provide additional clarification on some replies for utilization by offerors in formulating their Step One Technical Proposals. The revised responses are highlighted. Please reach out to the primary or secondary point of contact should you have more questions regarding the responses. An amendment to the formal RFP and a revision to Section L - Instructions to Bidders has been issued to update the amount of the bid guarantee to encourage offeror participation to the maximum extent possible. The due date for Step One Technical Proposals has not been extended, and all other terms and conditions of the solicitation and Section L remain unchanged and in full force and effect. Please refer to the amended RFP and revised Section L in the attachments section of this notice for more information. An additional amendment has been made to the formal RFP to extend the due date for Step One Technical Proposals to June 15th, 2026 at 5:00 PM CST. This is to allow offerors additional time to assess equipment selection, availability, and associated pricing. Supplemental verbiage has also been added to the specifications to provide additional guidance for connecting the controls to the front end of the chilled water system. All other terms and conditions of the solicitation and associated documents remain unchanged and in full force and effect. Please refer to the amended RFP and the revised specifications in the attachments section of this notice for more information. Point of clarification: The bid guarantee isn't required until Step Two Priced Bids are due. Offerors may acquire a bonding letter from their surety as an assurance, but it is not mandatory. Failure to furnish a bid guarantee in the proper amount may be a cause for rejection of an offeror's bid. The review of Step One proposals continues to ensure competition to the maximum extent possible. To clarify, in no way will the continued proposal reviews rescind any already successful offeror's acceptability. The reviews should conclude the week of 7/19/26, and a new Step Two Priced Bid dude date will be announced.

Official SAM.gov Contract Opportunities file extract description for this notice. CaptureIQ does not generate or rewrite this text.

Related Federal Opportunities

Why this matters

  • This notice is a solicitation.
  • The listed response deadline is Jul 27, 2026.
  • 4 related opportunities share this NAICS.

Related federal terms

  • RFP — Request for Proposal
  • NAICS — North American Industry Classification System
  • PSC — Product Service Code

Market context

4 Related OpportunitiesMatching opportunities on RFPCapture

Related intelligence

Research and capture tools

This notice carries an explicit small-business set-aside designation.

← All federal opportunities · Federal Opportunity Research

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.