Response deadline
Tue, Oct 13, 2026, 2:00 PM EDTFort Lee Vehicle Recovery Range
Compare your company's capabilities against this federal opportunity using CaptureIQ.
Opportunity details
- NAICS
- 236220
- Notice type
- Solicitation
- Set-aside
- 8(a) Set-Aside (FAR 19.8)
- Original posted
- October 16, 2026
- Last updated
- October 18, 2026
- Notice ID
- f84717f1baa340a1ae8d684e53259434
Summary
Amendment 0004: An amendment has been made to Solicitation W9123626BA0006. Please see attachment SF30, Solicitation Amendment W9123626BA006_0004, extending the bid due date and bid opening date. The purpose of this project is to construct 24 concrete turning pads, along with required site drainage improvements and road alignment and repair as necessary. The contract will be executed in three distinct phases, with the contractor granted access to only one phase at a time. Completion of each phase is required before proceeding to the next. The remaining phases (two and three) will only be performed if the options for phases are exercised. During construction activities in one phase, the Army will conduct training operations in the remaining two phases. Each turning pad, as identified in the project drawings, will require excavation of the existing roadbed and placement of concrete in accordance with the design specifications. Storm drainage systems will be installed to ensure positive site drainage throughout the construction process. Upon proper curing of the concrete turning pads, the connecting roads will be regarded and aligned to seamlessly integrate with the pads, as detailed in the contract drawings.
Read Full Official Summary
Amendment 0004: An amendment has been made to Solicitation W9123626BA0006. Please see attachment SF30, Solicitation Amendment W9123626BA006_0004, extending the bid due date and bid opening date. The purpose of this project is to construct 24 concrete turning pads, along with required site drainage improvements and road alignment and repair as necessary. The contract will be executed in three distinct phases, with the contractor granted access to only one phase at a time. Completion of each phase is required before proceeding to the next. The remaining phases (two and three) will only be performed if the options for phases are exercised. During construction activities in one phase, the Army will conduct training operations in the remaining two phases. Each turning pad, as identified in the project drawings, will require excavation of the existing roadbed and placement of concrete in accordance with the design specifications. Storm drainage systems will be installed to ensure positive site drainage throughout the construction process. Upon proper curing of the concrete turning pads, the connecting roads will be regarded and aligned to seamlessly integrate with the pads, as detailed in the contract drawings.
Related Federal Opportunities
Why this matters
- This notice is a solicitation.
- The listed response deadline is Oct 13, 2026.
- 4 related opportunities share this NAICS.
Related federal terms
Market context
4 Related OpportunitiesMatching opportunities on RFPCapture
Related intelligence
- NAICS 236220 market
- ENDIST Norfolk — W2SD ENDIST Norfolk
- Y1NB--Project 546-22-110 - Construct a New Boiler Building and Controls in the Old Incinerator Area Expand/Move Graphic Control
- PSC Y1PZ — Product Service Code Y1PZ
- Government contracting proposal software
- 2026 Federal Small-Business / Set-Aside Benchmark