Response deadline
Tue, Jul 7, 2026, 5:00 PM EDTFXSB 26-6837 Repair Replace Hangar Roof B11525
Compare your company's capabilities against this federal opportunity using CaptureIQ.
Opportunity details
- NAICS
- 238160
- Notice type
- Combined Synopsis/Solicitation
- Set-aside
- Small Business Set Aside - Total
- Original posted
- July 2, 2026
- Last updated
- October 18, 2026
- Notice ID
- adfc7f72cd9e4d07b8e2b7324fd60f02
Summary
Site visit is scheduled for 8 June, 2026, at 12:00PM. Building 11525 is a one-story, 113,000 square feet (SF) building framed from steel and cast concrete (beams and columns with CMU infill). The building was originally constructed in the early 1940s and is a historic property. The high barrel roof section that?s approximately 200-ft (curved) by 280-ft, two low roof low sections that are approximately 35-ft by 280-ft each, and one low roof section that approximately 62 ft by 242 ft. This project will remove the existing built-up roof (BUR) from both barrel center section and the east side roof low section identified in Sheets AD-101 and A-101, down to the existing decking and replaced with new 3-ply SBS-Modified BUR roof assembly with granular cap sheet on the barrel roof section and the south lower roof low section shall be replaced with a new 90-mil Ethylene Propylene Diene Monomer (EPDM) roof assembly. All roofing assemblies shall be fully adhered. Replace existing roof drains, flashings, vent pipe flashing, cover board (as required), vapor barrier, cant strips, metal copings and trim with new.
Read Full Official Summary
Site visit is scheduled for 8 June, 2026, at 12:00PM. Building 11525 is a one-story, 113,000 square feet (SF) building framed from steel and cast concrete (beams and columns with CMU infill). The building was originally constructed in the early 1940s and is a historic property. The high barrel roof section that?s approximately 200-ft (curved) by 280-ft, two low roof low sections that are approximately 35-ft by 280-ft each, and one low roof section that approximately 62 ft by 242 ft. This project will remove the existing built-up roof (BUR) from both barrel center section and the east side roof low section identified in Sheets AD-101 and A-101, down to the existing decking and replaced with new 3-ply SBS-Modified BUR roof assembly with granular cap sheet on the barrel roof section and the south lower roof low section shall be replaced with a new 90-mil Ethylene Propylene Diene Monomer (EPDM) roof assembly. All roofing assemblies shall be fully adhered. Replace existing roof drains, flashings, vent pipe flashing, cover board (as required), vapor barrier, cant strips, metal copings and trim with new.
Related Federal Opportunities
Why this matters
- This notice is a combined synopsis/solicitation.
- The listed response deadline is Jul 7, 2026.
- 4 related opportunities share this NAICS.
Related federal terms
Market context
4 Related OpportunitiesMatching opportunities on RFPCapture