Response deadline
Fri, Mar 20, 2026, 2:00 PM EDTFY25 Ludington and Pentwater Maintenance Dredging
Compare your company's capabilities against this federal opportunity using CaptureIQ.
Opportunity details
- NAICS
- 237990
- Notice type
- Solicitation
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- Original posted
- March 23, 2026
- Last updated
- October 19, 2026
- Notice ID
- a2bc8a98bbe44e3894b696db44c0ead4
Summary
***Posting of the bid abstract.***Amendment 0001 is issued to provide revised Plan Sheets CN101 and CN102. Reference amendment documents for full details.***FY25 Ludington and Pentwater Maintenance Dredging. Mobilize to Ludington Harbor and Pentwater Harbor and dredge between the upstream and downstream limits as shown on the contract drawings. Place dredged material at respective placement sites pertaining to each harbor, as outlined in the contract drawings and specifications. If applicable option(s) are exercised, re-mobilize to Pentwater Harbor in 2027 and dredge between the upstream and downstream limits as shown on the contract drawings. Upon completion of the work, clean-up and demobilize from the harbors. Information regarding the U.S. Army Corps of Engineers process for settling requests for equitable adjustments and duration goals to achieve definitization of equitable adjustments for change orders under construction contracts can be found by going to https://www.usace.army.mil/Strategic-Partnerships/Partnering/mod/129895/details/443/ then scrolling down on right hand side of page by clicking on ?View FFP Contract Changes Playbook Here?.
Read Full Official Summary
***Posting of the bid abstract.***Amendment 0001 is issued to provide revised Plan Sheets CN101 and CN102. Reference amendment documents for full details.***FY25 Ludington and Pentwater Maintenance Dredging. Mobilize to Ludington Harbor and Pentwater Harbor and dredge between the upstream and downstream limits as shown on the contract drawings. Place dredged material at respective placement sites pertaining to each harbor, as outlined in the contract drawings and specifications. If applicable option(s) are exercised, re-mobilize to Pentwater Harbor in 2027 and dredge between the upstream and downstream limits as shown on the contract drawings. Upon completion of the work, clean-up and demobilize from the harbors. Information regarding the U.S. Army Corps of Engineers process for settling requests for equitable adjustments and duration goals to achieve definitization of equitable adjustments for change orders under construction contracts can be found by going to https://www.usace.army.mil/Strategic-Partnerships/Partnering/mod/129895/details/443/ then scrolling down on right hand side of page by clicking on ?View FFP Contract Changes Playbook Here?.
Related Federal Opportunities
Why this matters
- This notice is a solicitation.
- The listed response deadline is Mar 20, 2026.
- 3 related opportunities share this NAICS.
Related federal terms
Market context
4 Related OpportunitiesMatching opportunities on RFPCapture