SAM.gov listing

FY26 ? Medical University of South Carolina (MUSC) Pump Upfit

Department of Defense → Department of the Army → US Army Corps of Engineers → Engineer Division SOPresolicitation

Response deadline

None listed
Analyze This Opportunity in CaptureIQ

Compare your company's capabilities against this federal opportunity using CaptureIQ.

Ready to Pursue This Opportunity?

Qualify the fit, analyze competitors, identify teaming partners, and generate review-ready materials — all in CaptureIQ.

  • Federal capture workflow
  • Competitor & teaming intelligence
  • Proposal preparation

Opportunity details

NAICS
237110
Notice type
Presolicitation
Set-aside
None
Original posted
Unavailable
Last updated
October 18, 2026
Notice ID
89b9f3bccae74cabaffacc6228f2b63a

Summary

PURPOSE OF THIS ANNOUNCEMENT: This announcement constitutes a pre-solicitation announcement of a proposed contract action pursuant to FAR 5.204. This is not a solicitation. No response is requested at this time. A formal solicitation will follow this announcement with full details, including a response deadline, the complete price proposal schedule, the construction plans and specifications, instructions to offerors, and the evaluation factors/basis for award. OFFERORS ARE RESPONSIBLE FOR MONITORING THIS WEBSITE FOR CHANGES TO THIS NOTICE AND THE FORMAL SOLICITATION ANNOUNCEMENT.PLANNED SOLICITATION: The final Solicitation for this project will be announced anytime between 15 and 30 days after the posting of this pre-solicitation. The contract type will be firm-fixed-price. DESCRIPTION OF WORK: The Medical University of South Carolina (MUSC) stormwater pump station (PS), located in the Medical District on the Charleston Peninsula, is critical infrastructure for the City of Charleston (City). The MUSC drainage basin forms a topographic low point without a natural outlet, and the PS is required to facilitate drainage. Proposed improvements include: increased pumping capacity including both pump and discharge piping capacity; improved hydraulic configuration in the wet well and inflow chamber; enclosure and conditioning of the control room; elevating all critical electrical and HVAC equipment above the design flood elevation; replacement and upgrade of electrical, instrumentation and controls, security, and lighting; construction of a new transformer pad and installation of increased capacity transformer; replacement of both wet well inflow pipes to correct pipe slope; structural supports of pipes and transformer pad; construction of a permanent bypass connection; replacement of the chain link gate; and minor grading and landscaping around the perimeter slab. The project also includes temporary pumps and piping to maintain station operations during construction. MAGNITUDE OF WORK is estimated at: $5,000,000 TO $10,000,000 North American Industry Classification System (NAICS) Code: 237110, Water and Sewer Line and related Structures Construction with an SBA Small Business Size of $45,000,000

Read Full Official Summary

PURPOSE OF THIS ANNOUNCEMENT: This announcement constitutes a pre-solicitation announcement of a proposed contract action pursuant to FAR 5.204. This is not a solicitation. No response is requested at this time. A formal solicitation will follow this announcement with full details, including a response deadline, the complete price proposal schedule, the construction plans and specifications, instructions to offerors, and the evaluation factors/basis for award. OFFERORS ARE RESPONSIBLE FOR MONITORING THIS WEBSITE FOR CHANGES TO THIS NOTICE AND THE FORMAL SOLICITATION ANNOUNCEMENT.PLANNED SOLICITATION: The final Solicitation for this project will be announced anytime between 15 and 30 days after the posting of this pre-solicitation. The contract type will be firm-fixed-price. DESCRIPTION OF WORK: The Medical University of South Carolina (MUSC) stormwater pump station (PS), located in the Medical District on the Charleston Peninsula, is critical infrastructure for the City of Charleston (City). The MUSC drainage basin forms a topographic low point without a natural outlet, and the PS is required to facilitate drainage. Proposed improvements include: increased pumping capacity including both pump and discharge piping capacity; improved hydraulic configuration in the wet well and inflow chamber; enclosure and conditioning of the control room; elevating all critical electrical and HVAC equipment above the design flood elevation; replacement and upgrade of electrical, instrumentation and controls, security, and lighting; construction of a new transformer pad and installation of increased capacity transformer; replacement of both wet well inflow pipes to correct pipe slope; structural supports of pipes and transformer pad; construction of a permanent bypass connection; replacement of the chain link gate; and minor grading and landscaping around the perimeter slab. The project also includes temporary pumps and piping to maintain station operations during construction. MAGNITUDE OF WORK is estimated at: $5,000,000 TO $10,000,000 North American Industry Classification System (NAICS) Code: 237110, Water and Sewer Line and related Structures Construction with an SBA Small Business Size of $45,000,000

Official SAM.gov Contract Opportunities file extract description for this notice. CaptureIQ does not generate or rewrite this text.

Related Federal Opportunities

Why this matters

  • This notice is a presolicitation.
  • The response deadline is 9999 days away.
  • 4 related opportunities share this NAICS.

Related federal terms

  • RFI — Request for Information
  • NAICS — North American Industry Classification System

Market context

4 Related OpportunitiesMatching opportunities on RFPCapture

Related intelligence

Research and capture tools

Contextual RFPCapture research and free tools related to this public federal page.

← All federal opportunities · Federal Opportunity Research

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.