Response deadline
Fri, Apr 3, 2026, 12:00 PM EDTFY26 Q4 Baltimore Harbor and Channels Maintenance Dredging, Maryland Channels, Chesapeake Bay, MD
Compare your company's capabilities against this federal opportunity using CaptureIQ.
Opportunity details
- NAICS
- 237990
- Notice type
- Sources Sought
- Original posted
- March 19, 2026
- Last updated
- October 19, 2026
- Notice ID
- e64c105adfe64385adfb2c7aec8310d7
Summary
FY26 Q4 Baltimore Harbor and Channels Maintenance Dredging, Maryland Channels, Chesapeake Bay, MD - The dredging depth for all channels is 50 feet mean lower low water (ft MLLW) with an additional 1 ? 2 feet of allowable overdepth. Approximately 1,538,000 cy will be dredged from the Maryland approach channels (Craighill Entrance, Craighill Angle, Cutoff Angle, and Upper Range Channels) and placed at the Paul S. Sarbanes Ecosystems Restoration Project at Poplar Island. Approximately 700,000 cy will be dredged from Baltimore Harbor Channels (Brewerton Angle and Curtis Bay Channels) and placed at the Cox Creek Dredged Material Containment Facility. The work areas are within heavy commercial waterways supporting the Port of Baltimore. The equipment required for this work commonly consists of two 30 plus cubic yard clamshell dredges, one 24 ? 30-inch hydraulic unloader, six to eight large tugs, six to eight 2,500 ? 6,000 cubic yard material scows, a drag bar and barge, and appropriate attendant plant and pipeline.
Read Full Official Summary
FY26 Q4 Baltimore Harbor and Channels Maintenance Dredging, Maryland Channels, Chesapeake Bay, MD - The dredging depth for all channels is 50 feet mean lower low water (ft MLLW) with an additional 1 ? 2 feet of allowable overdepth. Approximately 1,538,000 cy will be dredged from the Maryland approach channels (Craighill Entrance, Craighill Angle, Cutoff Angle, and Upper Range Channels) and placed at the Paul S. Sarbanes Ecosystems Restoration Project at Poplar Island. Approximately 700,000 cy will be dredged from Baltimore Harbor Channels (Brewerton Angle and Curtis Bay Channels) and placed at the Cox Creek Dredged Material Containment Facility. The work areas are within heavy commercial waterways supporting the Port of Baltimore. The equipment required for this work commonly consists of two 30 plus cubic yard clamshell dredges, one 24 ? 30-inch hydraulic unloader, six to eight large tugs, six to eight 2,500 ? 6,000 cubic yard material scows, a drag bar and barge, and appropriate attendant plant and pipeline.
Related Federal Opportunities
Why this matters
- This notice is a sources sought.
- The listed response deadline is Apr 3, 2026.
- 4 related opportunities share this NAICS.
Related federal terms
Market context
4 Related OpportunitiesMatching opportunities on RFPCapture
Related intelligence
- NAICS 237990 market
- ENDIST Baltimore — W2SD ENDIST Baltimore
- $5B DESIGN-BUILD/DESIGN-BID-BUILD INDEFINITE DELIVERY INDEFINITE QUANTITY WATERFRONT MULTIPLE AWARD CONSTRUCTION CONTRACT ($5B DB/DBB IDIQ WATERFRONT MACC), VARIOUS LOCATIONS, STATE OF HAWAII AND WAKE ISLAND
- PSC Z1KF — Product Service Code Z1KF
- Opportunity qualification software
- Free federal opportunity alerts