FY26 Willapa Bay Maintenance Dredging Bid Opening Details

Department of Defense → Department of the Army → US Army Corps of Engineers → Engineer Division Northwestern → ENDIST Seattle → W071 ENDIST SeattleSolicitationSolicitation W912DW26BA001

Response deadline

Tue, Jan 13, 2026, 3:30 PM EST
Analyze This Opportunity in CaptureIQ

Compare your company's capabilities against this federal opportunity using CaptureIQ.

Ready to Pursue This Opportunity?

Qualify the fit, analyze competitors, identify teaming partners, and generate review-ready materials — all in CaptureIQ.

  • Federal capture workflow
  • Competitor & teaming intelligence
  • Proposal preparation

Opportunity details

NAICS
237990
Notice type
Solicitation
Original posted
January 14, 2026
Last updated
October 19, 2026
Notice ID
f7acabc248894ad18f498738555a5fd1

Summary

Please see attached Amendment 0003 for complete details. Willapa Harbor Maintenance Dredging project in Willapa Harbor, Washington. USACE, Seattle District has been tasked to solicit for and award a construction contract to maintenance dredge the Bay Center, Nahcotta, and Tokeland Federal Navigation Channels to their authorized depths. Up to 180,000 CY is expected to be dredged across the three features via mechanical clamshell dredging. The minimum required dredging depth varies from -10 ft (Bay Center and Nahcotta) to -15 ft (Tokeland), MLLW, +2 ft overdepth at each location. In addition, dredging approximately 10,000 CY to a minimum depth of -9 ft MLLW (+1 ft overdepth) may be required in the Bay Center/Palix River Access Lane to ensure sufficient water depths for the dredge, scow, and tugboats to transit between Bay Center and the disposal sites. This amount has the potential to change due to the dynamic nature of the Palix River at its confluence with Willapa Bay. Dredged material will be disposed via bottom dump scow at the Cape Shoalwater open-water dispersive disposal site or the South Channel open-water dispersive disposal site. Work is anticipated to begin in summer 2026. The work window varies by project features. For any given calendar year, the in-water work windows are as follows:? Bay Center/Palix River: 16 Jul through 30 Sep? Nahcotta: 16 Jul through 01 Feb? Tokeland: 16 Jul through 15 FebWillapa Bay presents significant navigational hazards due to its exposed Pacific Ocean entrance, unmaintained channels, shifting shoals, and unpredictable weather. This performance window includes the worst season for storm and marine conditions. The U.S. Coast Guard has removed aids-to-navigation at Willapa Bar because of unreliable conditions, and their Waterways Analysis notes over 50 unreported groundings annually. These hazards present serious safety concerns for contractors and local users, complicating mobilization and dredging operations throughout the project area.In accordance with Federal Acquisition Regulation (FAR) Part 36 , the estimated construction price range for this project is: Between $5,000,000 and $10,000,000. Estimated duration of the dredging activities is 3-7 months. PLEASE SEE THE ATTACHED SOLICITATION, SPECIFICATIONS AND DRAWINGS FOR INSTRUCTIONS ON SUBMITTING A BID IN RESPONSE TO THE SOLICITATION.

Read Full Official Summary

Please see attached Amendment 0003 for complete details. Willapa Harbor Maintenance Dredging project in Willapa Harbor, Washington. USACE, Seattle District has been tasked to solicit for and award a construction contract to maintenance dredge the Bay Center, Nahcotta, and Tokeland Federal Navigation Channels to their authorized depths. Up to 180,000 CY is expected to be dredged across the three features via mechanical clamshell dredging. The minimum required dredging depth varies from -10 ft (Bay Center and Nahcotta) to -15 ft (Tokeland), MLLW, +2 ft overdepth at each location. In addition, dredging approximately 10,000 CY to a minimum depth of -9 ft MLLW (+1 ft overdepth) may be required in the Bay Center/Palix River Access Lane to ensure sufficient water depths for the dredge, scow, and tugboats to transit between Bay Center and the disposal sites. This amount has the potential to change due to the dynamic nature of the Palix River at its confluence with Willapa Bay. Dredged material will be disposed via bottom dump scow at the Cape Shoalwater open-water dispersive disposal site or the South Channel open-water dispersive disposal site. Work is anticipated to begin in summer 2026. The work window varies by project features. For any given calendar year, the in-water work windows are as follows:? Bay Center/Palix River: 16 Jul through 30 Sep? Nahcotta: 16 Jul through 01 Feb? Tokeland: 16 Jul through 15 FebWillapa Bay presents significant navigational hazards due to its exposed Pacific Ocean entrance, unmaintained channels, shifting shoals, and unpredictable weather. This performance window includes the worst season for storm and marine conditions. The U.S. Coast Guard has removed aids-to-navigation at Willapa Bar because of unreliable conditions, and their Waterways Analysis notes over 50 unreported groundings annually. These hazards present serious safety concerns for contractors and local users, complicating mobilization and dredging operations throughout the project area.In accordance with Federal Acquisition Regulation (FAR) Part 36 , the estimated construction price range for this project is: Between $5,000,000 and $10,000,000. Estimated duration of the dredging activities is 3-7 months. PLEASE SEE THE ATTACHED SOLICITATION, SPECIFICATIONS AND DRAWINGS FOR INSTRUCTIONS ON SUBMITTING A BID IN RESPONSE TO THE SOLICITATION.

Official SAM.gov Contract Opportunities file extract description for this notice. CaptureIQ does not generate or rewrite this text.

Related Federal Opportunities

Why this matters

  • This notice is a solicitation.
  • The listed response deadline is Jan 13, 2026.
  • 4 related opportunities share this NAICS.

Related federal terms

  • RFP — Request for Proposal
  • NAICS — North American Industry Classification System
  • PSC — Product Service Code

Market context

4 Related OpportunitiesMatching opportunities on RFPCapture

Related intelligence

Research and capture tools

Contextual RFPCapture research and free tools related to this public federal page.

← All federal opportunities · Federal Opportunity Research

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.