J045--RFQ - BOILER REPAIR HUDSON VALLEY VAHCS - MONTROSE CAMPUS

Veterans Affairs, Department Of.242-network Contract Office 02 (36c242)Combined Synopsis/SolicitationSolicitation 36C24226Q0816

Response deadline

Fri, Aug 28, 2026, 10:00 AM EDT
Analyze This Opportunity in CaptureIQ

Compare your company's capabilities against this federal opportunity using CaptureIQ.

Ready to Pursue This Opportunity?

Qualify the fit, analyze competitors, identify teaming partners, and generate review-ready materials — all in CaptureIQ.

  • Federal capture workflow
  • Competitor & teaming intelligence
  • Proposal preparation

Opportunity details

NAICS
238220
Notice type
Combined Synopsis/Solicitation
Set-aside
Small Business Set Aside - Total
Original posted
August 25, 2026
Last updated
October 18, 2026
Notice ID
181c85ef0c8d442d8d70449c97d4fdb2

Summary

The purpose of this amendment to the solicitation is to: 1. Extend response due date to 8/31/2026 at 10:00 AM ET. 2. Respond to questions. RFI 6 - Master Control Panel and SCADA Integration The propane header must interface with the existing Master Control Panel and SCADA system. During the walkthrough, MicroMod advised that the existing Master Control Panel has insufficient available I/O for the propane-system interface. MicroMod further advised that an upgraded Red Lion platform could be configured with the additional I/O and communications capability required for this integration. Requested VA Response: Please confirm whether the contract scope includes all required I/O hardware, Red Lion HMI or communications-platform upgrades, programming, graphics, and Master Control Panel/SCADA modifications necessary to provide a complete and operational propane-system interface. VA Response:  Contractor shall furnish and install an electro mechanical gas shut off valve (Maxon or approved equal) upstream of the fuel pressure regulator and downstream of the gas filter/strainer to protect the downstream safety shut off valves. The VA will provide at least one additional I/O module in the Boiler Plant Master control panel which will control the propane gas shut off valve. The contractor shall furnish and install the 110V power circuit from the I/O module to the propane gas shut off valve. The VA will provide the additional I/O prior to the completion of the contract work. RFI 7 - Boiler No. 2 Human-Machine Interface During the recent walkthrough, it was observed that the Boiler No. 2 control cabinet no longer has a functional Human-Machine Interface (HMI). A working HMI is required to interface with the existing MicroMod loop controllers and to configure, monitor, start up, test, and commission the Boiler No. 2 combustion-control system. A direct hardware swap is not adequate because current Red Lion models do not duplicate the obsolete unit's side-button arrangement; the existing screens and graphics must be re-engineered and converted for the new display. Requested VA Response: Please confirm whether the contract scope will be revised to include furnishing, engineering, programming, graphics conversion, installation, integration, testing, and commissioning of a new Red Lion HMI compatible with the existing MicroMod loop controllers and associated boiler-control equipment. Supporting Information: See Attachment E - Boiler No. 2 HMI Replacement. VA Response: The VA will have a new HMI installed prior to the completion of the contract work.

Read Full Official Summary

The purpose of this amendment to the solicitation is to: 1. Extend response due date to 8/31/2026 at 10:00 AM ET. 2. Respond to questions. RFI 6 - Master Control Panel and SCADA Integration The propane header must interface with the existing Master Control Panel and SCADA system. During the walkthrough, MicroMod advised that the existing Master Control Panel has insufficient available I/O for the propane-system interface. MicroMod further advised that an upgraded Red Lion platform could be configured with the additional I/O and communications capability required for this integration. Requested VA Response: Please confirm whether the contract scope includes all required I/O hardware, Red Lion HMI or communications-platform upgrades, programming, graphics, and Master Control Panel/SCADA modifications necessary to provide a complete and operational propane-system interface. VA Response:  Contractor shall furnish and install an electro mechanical gas shut off valve (Maxon or approved equal) upstream of the fuel pressure regulator and downstream of the gas filter/strainer to protect the downstream safety shut off valves. The VA will provide at least one additional I/O module in the Boiler Plant Master control panel which will control the propane gas shut off valve. The contractor shall furnish and install the 110V power circuit from the I/O module to the propane gas shut off valve. The VA will provide the additional I/O prior to the completion of the contract work. RFI 7 - Boiler No. 2 Human-Machine Interface During the recent walkthrough, it was observed that the Boiler No. 2 control cabinet no longer has a functional Human-Machine Interface (HMI). A working HMI is required to interface with the existing MicroMod loop controllers and to configure, monitor, start up, test, and commission the Boiler No. 2 combustion-control system. A direct hardware swap is not adequate because current Red Lion models do not duplicate the obsolete unit's side-button arrangement; the existing screens and graphics must be re-engineered and converted for the new display. Requested VA Response: Please confirm whether the contract scope will be revised to include furnishing, engineering, programming, graphics conversion, installation, integration, testing, and commissioning of a new Red Lion HMI compatible with the existing MicroMod loop controllers and associated boiler-control equipment. Supporting Information: See Attachment E - Boiler No. 2 HMI Replacement. VA Response: The VA will have a new HMI installed prior to the completion of the contract work.

Official SAM.gov Contract Opportunities file extract description for this notice. CaptureIQ does not generate or rewrite this text.

Related Federal Opportunities

Why this matters

  • This notice is a combined synopsis/solicitation.
  • The listed response deadline is Aug 28, 2026.
  • 4 related opportunities share this NAICS.

Related federal terms

  • NAICS — North American Industry Classification System
  • PSC — Product Service Code

Market context

4 Related OpportunitiesMatching opportunities on RFPCapture

Related intelligence

Research and capture tools

This notice carries an explicit small-business set-aside designation.

← All federal opportunities · Federal Opportunity Research

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.