SAM.gov listing

Maintenance Dredging at Haverstraw Bay, NY

Department of Defense → Department of the Army → US Army Corps of Engineers → Engineer Division NORTH Atlantic → ENDIST NEW YORK → W2SD ENDIST NEW YORKSolicitationSolicitation W912DS26BA017

Response deadline

Wed, Jul 8, 2026, 2:00 PM EDT
Analyze This Opportunity in CaptureIQ

Compare your company's capabilities against this federal opportunity using CaptureIQ.

Ready to Pursue This Opportunity?

Qualify the fit, analyze competitors, identify teaming partners, and generate review-ready materials — all in CaptureIQ.

  • Federal capture workflow
  • Competitor & teaming intelligence
  • Proposal preparation

Opportunity details

NAICS
237990
Notice type
Solicitation
Original posted
June 8, 2026
Last updated
October 18, 2026
Notice ID
3b155f74bbd441788f70f343445fdff9

Summary

The New York District (NAN) of the U.S. Army Corps of Engineers (USACE) proposes to perform maintenance dredging of the Hudson River Federal Navigation Project. The dredged material shall be transported to and placed at the federally approved Historic Area Remediation Site (HARS) located at the New York Bight Apex in the Atlantic Ocean. The proposed maintenance dredging will require the removal of approximately 200,000 cubic yards of critical shoals from the Federal Navigation Channel (FNC) at Haverstraw Bay, NY. The dredge area is located at RM 35 - 40 of the Hudson River and is approximately 60 miles from the HARS. Dredging is required to a depth of -32 feet Mean Lower Low Water (MLLW) datum plus 1-foot allowable over depth. The dredge material is expected to consist primarily of silt and clay. Dredging at the Haverstraw area will require the use of a mechanical dredge with a closed clamshell environmental bucket. The Contractor may also require the use of hopper barges, tugboat(s) and attendant plant(s) to perform dredging, transport and unloading/placement operations. All necessary permits required for the dredging and dredged material placement will be provided by the Government. The Contractor will be required to meet all conditions pertaining to dredging and dredge material placement as specified in these permits. Water Quality Certification restrictions prohibit performing any in-water dredging work earlier than August 15th or later than October 31st. The Contractor will be required to commence work within five (5) calendar days after receipt of the Notice to Proceed and shall prosecute work diligently to substantially complete all work within the time periods provided. Plans and Specifications for the subject project will be available June 2026, with bid opening on/about July 2026. It is the intention of the Government to award on Aug 2026 and issue the NTP on/about 10 Aug 2026.Liquidated Damages are expected to be $2,015.00 per calendar day of delay until all work under the contract is accepted.

Read Full Official Summary

The New York District (NAN) of the U.S. Army Corps of Engineers (USACE) proposes to perform maintenance dredging of the Hudson River Federal Navigation Project. The dredged material shall be transported to and placed at the federally approved Historic Area Remediation Site (HARS) located at the New York Bight Apex in the Atlantic Ocean. The proposed maintenance dredging will require the removal of approximately 200,000 cubic yards of critical shoals from the Federal Navigation Channel (FNC) at Haverstraw Bay, NY. The dredge area is located at RM 35 - 40 of the Hudson River and is approximately 60 miles from the HARS. Dredging is required to a depth of -32 feet Mean Lower Low Water (MLLW) datum plus 1-foot allowable over depth. The dredge material is expected to consist primarily of silt and clay. Dredging at the Haverstraw area will require the use of a mechanical dredge with a closed clamshell environmental bucket. The Contractor may also require the use of hopper barges, tugboat(s) and attendant plant(s) to perform dredging, transport and unloading/placement operations. All necessary permits required for the dredging and dredged material placement will be provided by the Government. The Contractor will be required to meet all conditions pertaining to dredging and dredge material placement as specified in these permits. Water Quality Certification restrictions prohibit performing any in-water dredging work earlier than August 15th or later than October 31st. The Contractor will be required to commence work within five (5) calendar days after receipt of the Notice to Proceed and shall prosecute work diligently to substantially complete all work within the time periods provided. Plans and Specifications for the subject project will be available June 2026, with bid opening on/about July 2026. It is the intention of the Government to award on Aug 2026 and issue the NTP on/about 10 Aug 2026.Liquidated Damages are expected to be $2,015.00 per calendar day of delay until all work under the contract is accepted.

Official SAM.gov Contract Opportunities file extract description for this notice. CaptureIQ does not generate or rewrite this text.

Related Federal Opportunities

Why this matters

  • This notice is a solicitation.
  • The listed response deadline is Jul 8, 2026.
  • 4 related opportunities share this NAICS.

Related federal terms

  • RFP — Request for Proposal
  • NAICS — North American Industry Classification System
  • PSC — Product Service Code

Market context

4 Related OpportunitiesMatching opportunities on RFPCapture

Related intelligence

Research and capture tools

Contextual RFPCapture research and free tools related to this public federal page.

← All federal opportunities · Federal Opportunity Research

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.