SAM.gov listing

Mosquito Lake Control Tower Structural Standing Seam Metal Roof Replacement

Department of Defense → Department of the Army → US Army Corps of Engineers → Engineer Division GREAT LAKES and OHIO → ENDIST Pittsburgh → W072 ENDIST PittsburghSolicitationSolicitation W911WN26QA062

Response deadline

Mon, Oct 26, 2026, 12:00 PM EDT
Analyze This Opportunity in CaptureIQ

Compare your company's capabilities against this federal opportunity using CaptureIQ.

Ready to Pursue This Opportunity?

Qualify the fit, analyze competitors, identify teaming partners, and generate review-ready materials — all in CaptureIQ.

  • Federal capture workflow
  • Competitor & teaming intelligence
  • Proposal preparation

Opportunity details

NAICS
238160
Notice type
Solicitation
Set-aside
Small Business Set Aside - Total
Original posted
September 24, 2026
Last updated
October 24, 2026
Notice ID
29182e97d06744ec9445200d715ff3aa

Summary

The U.S. Army Corps of Engineers (USACE), Pittsburgh District has a project that involves the complete replacement of the standing seam metal roof on the Control Tower Building at Mosquito Creek Lake in Cortland, Ohio. The work is to be completed within 365 calendar days after written Notice to Proceed (NTP). Rough Estimate of this non-commercial construction project is between $150,000.00 and $350,000.00. The work includes rerouting existing vent and exhaust pipes through the masonry side wall, installing a new gutter system, and integrating a new, certified, non-penetrating Lightning Protection System. The North American Industrial Classification Code (NAICS) is 238160 - Roofing Contractors. The Small Business Size Standard is $19,000,000.00. Any resultant award will be for one (1) Firm-Fixed Price (FFP) Contract. The Request for Quote (RFQ) will be issued on, or about, 4 September 2026, via the Procurement Integrated Enterprise Environment (PIEE), which posts the opportunity to SAM.gov. The anticipated award date is 13 November 2026. Basis of Award is best value to the Government. Quotes will be evaluated in accordance with (IAW) RFO 12.203(a), price and past performance. The Government reserves the right to reject any quotes that are unrealistically low or exceed available funds for this requirement. Information regarding the U.S. Army Corps of Engineers process for settling requests for equitable adjustments and duration goals to achieve definitization of equitable adjustments for change orders under construction contracts can be found by going to https://www.usace.army.mil/Strategic-Partnerships/Partnering/mod/129895/details/443/ then scrolling down on right hand side of page by clicking on View FFP Contract Changes Playbook Here.

Read Full Official Summary

The U.S. Army Corps of Engineers (USACE), Pittsburgh District has a project that involves the complete replacement of the standing seam metal roof on the Control Tower Building at Mosquito Creek Lake in Cortland, Ohio. The work is to be completed within 365 calendar days after written Notice to Proceed (NTP). Rough Estimate of this non-commercial construction project is between $150,000.00 and $350,000.00. The work includes rerouting existing vent and exhaust pipes through the masonry side wall, installing a new gutter system, and integrating a new, certified, non-penetrating Lightning Protection System. The North American Industrial Classification Code (NAICS) is 238160 - Roofing Contractors. The Small Business Size Standard is $19,000,000.00. Any resultant award will be for one (1) Firm-Fixed Price (FFP) Contract. The Request for Quote (RFQ) will be issued on, or about, 4 September 2026, via the Procurement Integrated Enterprise Environment (PIEE), which posts the opportunity to SAM.gov. The anticipated award date is 13 November 2026. Basis of Award is best value to the Government. Quotes will be evaluated in accordance with (IAW) RFO 12.203(a), price and past performance. The Government reserves the right to reject any quotes that are unrealistically low or exceed available funds for this requirement. Information regarding the U.S. Army Corps of Engineers process for settling requests for equitable adjustments and duration goals to achieve definitization of equitable adjustments for change orders under construction contracts can be found by going to https://www.usace.army.mil/Strategic-Partnerships/Partnering/mod/129895/details/443/ then scrolling down on right hand side of page by clicking on View FFP Contract Changes Playbook Here.

Official SAM.gov notice description for this notice. CaptureIQ does not generate or rewrite this text.

Related Federal Opportunities

Why this matters

  • This notice is a solicitation.
  • The listed response deadline is Oct 26, 2026.
  • 4 related opportunities share this NAICS.

Related federal terms

  • RFP — Request for Proposal
  • NAICS — North American Industry Classification System
  • PSC — Product Service Code

Market context

4 Related OpportunitiesMatching opportunities on RFPCapture

Related intelligence

Research and capture tools

This notice carries an explicit small-business set-aside designation.

← All federal opportunities · Federal Opportunity Research

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.