Response deadline
Fri, Jul 14, 2028, 8:00 PM EDTOR FLAP DOT CRGNSA 100(7), Historic Columbia River Highway State Trail, Mitchell Point Dr. to Ruthton Trailhead
Compare your company's capabilities against this federal opportunity using CaptureIQ.
Opportunity details
- Agency
- Transportation, Department of — Federal Highway Administration.690567 Western Federal LANDS DIV
- NAICS
- 237310
- Notice type
- Presolicitation
- Set-aside
- Small Business Set Aside - Total
- Original posted
- July 15, 2026
- Last updated
- October 18, 2026
- Notice ID
- 56bc6fa3003b4266ba4f8a80fc27e0b3
Summary
PROJECT: OR FLAP DOT CRGNSA 100(7), Historic Columbia River Highway State Trail, Mitchell Point Dr. to Ruthton Trailhead LOCATION: 4 miles west of Hood River, OR WORK: This project consists of a new multi-use trail, precast concrete arch culvert, clearing, excavation, grading, drainage, aggregate-base, asphalt surface course, temporary traffic control and permanent signage and striping. See “Project Description” posted under Attachments for additional details. LENGTH: 0.3 miles TENTATIVE COMPLETION DATE: Late Winter/Spring 2028 CONTRACT TYPE: Sealed Bid, firm-fixed-price ESTIMATED PRICE RANGE: Between $5,000,000 and $10,000,000. INTERESTED VENDORS LIST: To view the Interested Vendors List, you must register as a SAM user, be logged in, and linked to an entity. If you are signed into SAM.gov with your registered entity and you cannot see the Interested Vendors List, you will need to be assigned the Contract Opportunities Administrator role for your entity in SAM.gov. If you need assistance, go to https://www.fsd.gov/gsafsd_sp. THIS SOLICITATION IS OFFERED AS A SMALL BUSINESS SET-ASIDE. This project is anticipated to be solicited Fall/Winter 2026 To ensure you receive notification when the solicitation documents are posted to SAM.gov, please click on the “follow” button at the top of the opportunity page.
Read Full Official Summary
PROJECT: OR FLAP DOT CRGNSA 100(7), Historic Columbia River Highway State Trail, Mitchell Point Dr. to Ruthton Trailhead LOCATION: 4 miles west of Hood River, OR WORK: This project consists of a new multi-use trail, precast concrete arch culvert, clearing, excavation, grading, drainage, aggregate-base, asphalt surface course, temporary traffic control and permanent signage and striping. See “Project Description” posted under Attachments for additional details. LENGTH: 0.3 miles TENTATIVE COMPLETION DATE: Late Winter/Spring 2028 CONTRACT TYPE: Sealed Bid, firm-fixed-price ESTIMATED PRICE RANGE: Between $5,000,000 and $10,000,000. INTERESTED VENDORS LIST: To view the Interested Vendors List, you must register as a SAM user, be logged in, and linked to an entity. If you are signed into SAM.gov with your registered entity and you cannot see the Interested Vendors List, you will need to be assigned the Contract Opportunities Administrator role for your entity in SAM.gov. If you need assistance, go to https://www.fsd.gov/gsafsd_sp. THIS SOLICITATION IS OFFERED AS A SMALL BUSINESS SET-ASIDE. This project is anticipated to be solicited Fall/Winter 2026 To ensure you receive notification when the solicitation documents are posted to SAM.gov, please click on the “follow” button at the top of the opportunity page.
Related Federal Opportunities
Why this matters
- This notice is a presolicitation.
- The listed response deadline is Jul 14, 2028.
- 4 related opportunities share this NAICS.
Related federal terms
Market context
4 Related OpportunitiesMatching opportunities on RFPCapture
Related intelligence
- NAICS 237310 market
- Transportation, Department of — Federal Highway Administration.690567 Western Federal LANDS DIV
- Repair Aircraft Hangar Apron Concrete - Air Station North Bend
- PSC Y1LB — Product Service Code Y1LB
- Government contracting proposal software
- 2026 Federal Small-Business / Set-Aside Benchmark