SAM.gov listing

Pad-Mounted Transformer

Department of Defense → Department of the Army → AMC → ACC → Mission Installation Contracting Command.419th CSB → W6QM Micc-ft DRUMCombined Synopsis/SolicitationSolicitation W911S226U3773

Response deadline

Wed, Jul 29, 2026, 4:05 PM EDT

Product Service Code

PSC 6120
Analyze This Opportunity in CaptureIQ

Compare your company's capabilities against this federal opportunity using CaptureIQ.

Ready to Pursue This Opportunity?

Qualify the fit, analyze competitors, identify teaming partners, and generate review-ready materials — all in CaptureIQ.

  • Federal capture workflow
  • Competitor & teaming intelligence
  • Proposal preparation

Opportunity details

NAICS
335311
Notice type
Combined Synopsis/Solicitation
Set-aside
Small Business Set Aside - Total
Original posted
July 22, 2026
Last updated
October 18, 2026
Notice ID
6d4854cba1ee4d9b97f4c3b948aee2ca

Summary

Provide one Pad Mounted Transformer 750 kVA, 13.2 kV /208Y/120 V. Salient Characteristics: Furnish one (1) pad mounted, dead front, radial transformer, rated: ? Capacity: 750 kVA ? Phases: 3 ? Primary Voltage: 13,200 V (15 kV class) ?Secondary Voltage: 208Y/120 V ? Frequency: 60 Hz ? Phase: Three phase ? Cooling :ONAN ? Fluid: Mineral oil 2. Mandatory Physical Dimensions: The following dimensions are non negotiable: ? Height: 63?? inches (up to 64?? inches) ? Width: 65 inches ? Depth: May varies (existing is 41 inches) The Contractor shall confirm with proposal the manufacturing dimensions, either in writing or by a shop drawing, for government approval. 3. Mechanical and Construction Requirements: The transformer shall include: ?Stainless steel tank, cabinet and hardware (304) ? Dead front construction ? Pentahead security hardware ? ANSI 61 Grey color to match with existing enclosure ? Welded tank construction, sealed and pressure tested ? 1-inch Oil drain valve located on the primary side with 3/8-inch water sampler (required due to secondary side cable congestion) ? Arc-flash and safety labeling ? Lifting lugs and jacking pads ? Nameplate per ANSI C57.12.00 4.Electrical Requirements: ? Primary bushings: (6) 200 A load break wells with inserts for (3)LV and (3) 10KV arresters ? Secondary bushings: NEMA spade w/ supports terminals 10holes (3) LV and (1) neutral per ANSI ? Configuration: Radial Feed ? Impedance: Standard ANSI values for 750 kVA ? Taps: ?2 x 2.5% (standard 5 position no load tap changer) 5.Protection and Monitoring: The transformer shall include: ? Bayonet fuse with isolation link? Current limiting fuses ? Load break switch (2 position minimum) ? Nitrogen pressure gauge, test port and blanket ? Temperature gauge ? Pressure vacuum gauge ? Liquid level indicator ? Schrader valve Note: All gauges must be visible. 6. Compliance Requirements: The transformer must comply with: ? ANSI/IEEE C57.12 series ? DOE 2016 efficiency standards ? National Electrical Safety Code (NESC) ? National Electrical Code (NEC /NFPA 70) ? UFGS 26 12 19 ? Pad Mounted, Liquid Filled, Medium Voltage Transformers ?American Buy Act ? PCB-free oil certification ? UL Listed 002. Provide Factory routine test Reports Results and documentation as minimum: ? Insulation resistance test ? Winding resistance test ? Turns ratio (TTR) ?Polarity and phase-relation test ? No-load and load-loss test ? Dielectric test ? Excitation test ?Impedance test ? Applied and Induced potential tests ? Leak Test ? Oil quality test (dielectric strength, moisture, interfacial tension) ? Certified As-built drawings ? Certified test report signed by manufacturer ? Installation and OM manuals ? Warranty documentation (minimum 1 year) ? Destination to the federal facility Fort Buchanan, Puerto Rico00934 ? ECD: 40 weeks ? Unit must arrive fully assembled and ready for installation ?Packing slip must include contract number, PO number, and serial number? Minimum 1 year manufacturer warranty covering defects in equipment.

Read Full Official Summary

Provide one Pad Mounted Transformer 750 kVA, 13.2 kV /208Y/120 V. Salient Characteristics: Furnish one (1) pad mounted, dead front, radial transformer, rated: ? Capacity: 750 kVA ? Phases: 3 ? Primary Voltage: 13,200 V (15 kV class) ?Secondary Voltage: 208Y/120 V ? Frequency: 60 Hz ? Phase: Three phase ? Cooling :ONAN ? Fluid: Mineral oil 2. Mandatory Physical Dimensions: The following dimensions are non negotiable: ? Height: 63?? inches (up to 64?? inches) ? Width: 65 inches ? Depth: May varies (existing is 41 inches) The Contractor shall confirm with proposal the manufacturing dimensions, either in writing or by a shop drawing, for government approval. 3. Mechanical and Construction Requirements: The transformer shall include: ?Stainless steel tank, cabinet and hardware (304) ? Dead front construction ? Pentahead security hardware ? ANSI 61 Grey color to match with existing enclosure ? Welded tank construction, sealed and pressure tested ? 1-inch Oil drain valve located on the primary side with 3/8-inch water sampler (required due to secondary side cable congestion) ? Arc-flash and safety labeling ? Lifting lugs and jacking pads ? Nameplate per ANSI C57.12.00 4.Electrical Requirements: ? Primary bushings: (6) 200 A load break wells with inserts for (3)LV and (3) 10KV arresters ? Secondary bushings: NEMA spade w/ supports terminals 10holes (3) LV and (1) neutral per ANSI ? Configuration: Radial Feed ? Impedance: Standard ANSI values for 750 kVA ? Taps: ?2 x 2.5% (standard 5 position no load tap changer) 5.Protection and Monitoring: The transformer shall include: ? Bayonet fuse with isolation link? Current limiting fuses ? Load break switch (2 position minimum) ? Nitrogen pressure gauge, test port and blanket ? Temperature gauge ? Pressure vacuum gauge ? Liquid level indicator ? Schrader valve Note: All gauges must be visible. 6. Compliance Requirements: The transformer must comply with: ? ANSI/IEEE C57.12 series ? DOE 2016 efficiency standards ? National Electrical Safety Code (NESC) ? National Electrical Code (NEC /NFPA 70) ? UFGS 26 12 19 ? Pad Mounted, Liquid Filled, Medium Voltage Transformers ?American Buy Act ? PCB-free oil certification ? UL Listed 002. Provide Factory routine test Reports Results and documentation as minimum: ? Insulation resistance test ? Winding resistance test ? Turns ratio (TTR) ?Polarity and phase-relation test ? No-load and load-loss test ? Dielectric test ? Excitation test ?Impedance test ? Applied and Induced potential tests ? Leak Test ? Oil quality test (dielectric strength, moisture, interfacial tension) ? Certified As-built drawings ? Certified test report signed by manufacturer ? Installation and OM manuals ? Warranty documentation (minimum 1 year) ? Destination to the federal facility Fort Buchanan, Puerto Rico00934 ? ECD: 40 weeks ? Unit must arrive fully assembled and ready for installation ?Packing slip must include contract number, PO number, and serial number? Minimum 1 year manufacturer warranty covering defects in equipment.

Official SAM.gov Contract Opportunities file extract description for this notice. CaptureIQ does not generate or rewrite this text.

Related Federal Opportunities

Why this matters

  • This notice is a combined synopsis/solicitation.
  • The listed response deadline is Jul 29, 2026.
  • 3 related opportunities share this NAICS.

Related federal terms

  • NAICS — North American Industry Classification System
  • PSC — Product Service Code

Market context

4 Related OpportunitiesMatching opportunities on RFPCapture

Related intelligence

Research and capture tools

This notice carries an explicit small-business set-aside designation.

← All federal opportunities · Federal Opportunity Research

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.