Response deadline
Thu, Jul 16, 2026, 8:00 PM EDTRepair and Modernization IDIQ YC-UF-UFDD
Compare your company's capabilities against this federal opportunity using CaptureIQ.
Opportunity details
- NAICS
- 336611
- Notice type
- Award Notice
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- Original posted
- July 2, 2026
- Last updated
- October 19, 2026
- Notice ID
- 0366cd971b514cfcbb8ce6688755e79e
Summary
The Regional Maintenance Center at Puget Sound Naval Shipyard and Intermediate Maintenance Facility (PSNS and IMF), Bremerton, Washington intends to award a Firm-Fixed Price (FFP) Indefinite Delivery Indefinite Quantity (IDIQ) Multiple Award Contract (MAC) to procure repair and modernization of U.S. Navy waterborne barges home ported in the following locations in the state of Washington: Bremerton, Everett, Keyport, Indian Island, Manchester Fuel Depot, and NSB Bangor (Silverdale). Work will be accomplished at the Contractors facility. Geographical Area of Consideration: To facilitate proper government oversight, the facility shall be located in Puget Sound, WA region. For this procurement, the Puget Sound, WA region is defined as the West Coast of the continental US, starting from Olympia, WA and extending northward to Bellingham, WA. Types of Vessels: YC (Yard Craft), UF (Utility Float), UFDD (Utility Float Deep Draft) Barges. Characteristics of vessels: Structural Material: Steel, YC Notional Length: 115 Feet, YC Notional Width: 32 Feet, YC Notional Draft: 3 Feet, YC, Notional Light Load: 160 Long Tons, UF Notional Length: 60 Feet, UF Notional Width: 15 Feet, UF Notional Draft: 3 Feet, UF Notional Light Load: 25 Long Tons, UFDD Notional Length: 60 Feet, UFDD Notional Width: 15 Feet, UFDD Notional Draft: 22 Feet, UFDD Notional Light Load: 45 Long Tons. Design Types: Hull, Mechanical, and Electrical Design. Basic Commercial Off-the-Shelf to Militarized Special Designs. Scope Overview: Typical projects may include docking the vessel and accomplishing the required vessel husbandry, project management, welding, pipefitting, shipfitting, abrasive grit blasting, painting, sheet metal forming, shaping, cutting and stamping, electrical repairs, alterations, and modernization, pump/motor and mechanical systems repair, tank cleaning, rigging, and temporary scaffolding removal/installation. The anticipated ordering period is five years between MAY 2026 to MAY 2031. This is a total small business set-aside. All offerors must be registered with the System for Award Management (SAM) to receive award of Government contracts. Offerors are advised also that SAM representations and certifications can be completed electronically via the System for Award Management website at https://www.sam.gov.
Read Full Official Summary
The Regional Maintenance Center at Puget Sound Naval Shipyard and Intermediate Maintenance Facility (PSNS and IMF), Bremerton, Washington intends to award a Firm-Fixed Price (FFP) Indefinite Delivery Indefinite Quantity (IDIQ) Multiple Award Contract (MAC) to procure repair and modernization of U.S. Navy waterborne barges home ported in the following locations in the state of Washington: Bremerton, Everett, Keyport, Indian Island, Manchester Fuel Depot, and NSB Bangor (Silverdale). Work will be accomplished at the Contractors facility. Geographical Area of Consideration: To facilitate proper government oversight, the facility shall be located in Puget Sound, WA region. For this procurement, the Puget Sound, WA region is defined as the West Coast of the continental US, starting from Olympia, WA and extending northward to Bellingham, WA. Types of Vessels: YC (Yard Craft), UF (Utility Float), UFDD (Utility Float Deep Draft) Barges. Characteristics of vessels: Structural Material: Steel, YC Notional Length: 115 Feet, YC Notional Width: 32 Feet, YC Notional Draft: 3 Feet, YC, Notional Light Load: 160 Long Tons, UF Notional Length: 60 Feet, UF Notional Width: 15 Feet, UF Notional Draft: 3 Feet, UF Notional Light Load: 25 Long Tons, UFDD Notional Length: 60 Feet, UFDD Notional Width: 15 Feet, UFDD Notional Draft: 22 Feet, UFDD Notional Light Load: 45 Long Tons. Design Types: Hull, Mechanical, and Electrical Design. Basic Commercial Off-the-Shelf to Militarized Special Designs. Scope Overview: Typical projects may include docking the vessel and accomplishing the required vessel husbandry, project management, welding, pipefitting, shipfitting, abrasive grit blasting, painting, sheet metal forming, shaping, cutting and stamping, electrical repairs, alterations, and modernization, pump/motor and mechanical systems repair, tank cleaning, rigging, and temporary scaffolding removal/installation. The anticipated ordering period is five years between MAY 2026 to MAY 2031. This is a total small business set-aside. All offerors must be registered with the System for Award Management (SAM) to receive award of Government contracts. Offerors are advised also that SAM representations and certifications can be completed electronically via the System for Award Management website at https://www.sam.gov.
Related Federal Opportunities
Why this matters
- This notice is a award notice.
- The response deadline is 11 days away.
- 4 related opportunities share this NAICS.
Related federal terms
Market context
4 Related OpportunitiesMatching opportunities on RFPCapture