SAM.gov listing

RFQ - 12.5-Ton Gas/Electric Rooftop Unit Package

Department of Defense → Department of the Army → AMC → ACC → Mission Installation Contracting Command.419th CSB → W6QM Micc-ft DRUMCombined Synopsis/SolicitationSolicitation W911S226U3282

Response deadline

Thu, May 28, 2026, 3:30 PM EDT
Analyze This Opportunity in CaptureIQ

Compare your company's capabilities against this federal opportunity using CaptureIQ.

Ready to Pursue This Opportunity?

Qualify the fit, analyze competitors, identify teaming partners, and generate review-ready materials — all in CaptureIQ.

  • Federal capture workflow
  • Competitor & teaming intelligence
  • Proposal preparation

Opportunity details

NAICS
333415
Notice type
Combined Synopsis/Solicitation
Set-aside
Small Business Set Aside - Total
Original posted
May 20, 2026
Last updated
October 18, 2026
Notice ID
1c2cbb6bbb5d48379e13b44ebfc183b8

Summary

Amended to change NAICS code. This requirement is for a complete, like-for-like replacement of an existing commercial rooftop unit, or RTU. The required equipment package must meet or exceed the following specifications. The base unit must be one 12.5-Ton Gas Heat and Electric Cooling Rooftop Unit with a 208-volt, 3-phase power supply. The unit must have single circuit, two-stage cooling with a minimum 10.8 EER or 15.0 IEER, and two-stage medium gas heat with a first stage of 180 MBH input and a second stage of 224 MBH input. It must also feature a high-static direct-drive vane axial fan, such as a Carrier EcoBlue or equivalent, and use a modern, low GWP refrigerant like R-454b. The package must also include the following compatible accessories: one Vertical Economizer with a controller, one Enthalpy sensor and harness for the economizer, and one standalone, two-stage programmable thermostat.

Read Full Official Summary

Amended to change NAICS code. This requirement is for a complete, like-for-like replacement of an existing commercial rooftop unit, or RTU. The required equipment package must meet or exceed the following specifications. The base unit must be one 12.5-Ton Gas Heat and Electric Cooling Rooftop Unit with a 208-volt, 3-phase power supply. The unit must have single circuit, two-stage cooling with a minimum 10.8 EER or 15.0 IEER, and two-stage medium gas heat with a first stage of 180 MBH input and a second stage of 224 MBH input. It must also feature a high-static direct-drive vane axial fan, such as a Carrier EcoBlue or equivalent, and use a modern, low GWP refrigerant like R-454b. The package must also include the following compatible accessories: one Vertical Economizer with a controller, one Enthalpy sensor and harness for the economizer, and one standalone, two-stage programmable thermostat.

Official SAM.gov Contract Opportunities file extract description for this notice. CaptureIQ does not generate or rewrite this text.

Related Federal Opportunities

Why this matters

  • This notice is a combined synopsis/solicitation.
  • The listed response deadline is May 28, 2026.
  • 4 related opportunities share this NAICS.

Related federal terms

  • NAICS — North American Industry Classification System
  • PSC — Product Service Code

Market context

4 Related OpportunitiesMatching opportunities on RFPCapture

Related intelligence

Research and capture tools

This notice carries an explicit small-business set-aside designation.

← All federal opportunities · Federal Opportunity Research

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.