SAM.gov listing

SAFETY SHOWER

Department of Defense → Department of the Army → AMC → ACC → Mission Installation Contracting Command.419th CSB → W6QM Micc-ft DRUMCombined Synopsis/SolicitationSolicitation W911S226U4017

Response deadline

Tue, Aug 18, 2026, 10:00 AM EDT

Product Service Code

PSC 4240

NAICS code

NAICS 332913
Analyze This Opportunity in CaptureIQ

Compare your company's capabilities against this federal opportunity using CaptureIQ.

Ready to Pursue This Opportunity?

Qualify the fit, analyze competitors, identify teaming partners, and generate review-ready materials — all in CaptureIQ.

  • Federal capture workflow
  • Competitor & teaming intelligence
  • Proposal preparation

Opportunity details

NAICS
332913
Notice type
Combined Synopsis/Solicitation
Set-aside
Small Business Set Aside - Total
Original posted
August 10, 2026
Last updated
October 18, 2026
Notice ID
d5979f2abb544b6981b4dd5a2a2139bc

Summary

ATS EcoTower C1D2/26 ? Pneumatic, Skid-Mounted Safety Shower and Eyewash Station (or Equal) Primary Purpose: To provide rapid, compliant, and self-contained emergency decontamination (shower and eye/face wash) in remote locations or harsh environments lacking a potable water source, specifically within hazardous areas. ________________________________________ ???? Core System and Compliance Standards ? Safety Compliance: Must be fully compliant with ANSI/ISEAZ358.1 (2014) standards for emergency eyewash and shower equipment, ensuring continuous flow capabilities ? Electrical Hazard Classification: Must be certified for Class I, Division 2 (C1D2) hazardous locations to prevent ignition risks in environments where flammable gases or vapors may be present________________________________________ ? Water Capacity and Thermal Regulation ? Fluid Capacity: Must include an integrated, heavy-duty insulated water storage tank with a minimum capacity of 325 gallons to guarantee a minimum of 15minutes of continuous tepid water flow. ? Tepid Water Delivery: Must feature an integrated, electrical immersion heating system (minimum 1,200 Watts) to actively maintain stored water temperatures above the ANSI-mandated minimum of 60?F (15.6?C) in freezing or cold-weather conditions ? Freeze Protection: Must utilize a self-regulating heat trace system to protect plumbing and supply lines from freezing down to an ambient operating temperature threshold of 0?F (-17.8?C) ________________________________________???? Pneumatic Operation and Mechanical Specifications ? Pumping System: Must utilize a pneumatically driven transfer pump (rather than electric) to deliver pressurized water to the showerhead and eyewash . This ensures complete spark-free operation in C1D2 zones and allows the unit to safely function during electrical outages via pneumatic backup ?Pneumatic Air Source Input: Must support a shop air compressor supply or specialized nitrogen tank supply with an operational pressure range of 60 to 120 PSI (recommended regulator set to 80 PSI) ? Flow Rates: ? Shower: Must deliver a regulated flow rate of at least 20 GPM (76 LPM) ? Eyewash: Must deliver a regulated flow rate of at least 0.4 GPM(1.5 LPM) with an integrated protective dust/debris cover________________________________________ ???? Structural and Mounting Specifications ? Skid-Mount Design: Must be built on a heavy-duty, corrosion-resistant, powder-coated steel skid frame designed for rapid deployment, positioning by forklift/crane, and high-wind structural stability. ? Footprint and Portability: Must maintain a compact, space-saving footprint suitable for deployment in tight industrial spaces, remote airfields, or forward operating environments ? Material Durability: All critical external piping and the showerhead assembly must be constructed from durable stainless steel or equivalent corrosion-resistant materials. ? Controls and Activation: Must feature a highly visible, easy-to-reach mechanical pull-handle mechanism for instant, hands-free activation of the shower ________________________________________ ? Power Requirements ?Electrical Input: Must operate on standard, readily available utility or generator power:120V, single-phase, 60Hz, 20-Amp draw (typically utilizing a NEMA 5-20 plug configuration)

Read Full Official Summary

ATS EcoTower C1D2/26 ? Pneumatic, Skid-Mounted Safety Shower and Eyewash Station (or Equal) Primary Purpose: To provide rapid, compliant, and self-contained emergency decontamination (shower and eye/face wash) in remote locations or harsh environments lacking a potable water source, specifically within hazardous areas. ________________________________________ ???? Core System and Compliance Standards ? Safety Compliance: Must be fully compliant with ANSI/ISEAZ358.1 (2014) standards for emergency eyewash and shower equipment, ensuring continuous flow capabilities ? Electrical Hazard Classification: Must be certified for Class I, Division 2 (C1D2) hazardous locations to prevent ignition risks in environments where flammable gases or vapors may be present________________________________________ ? Water Capacity and Thermal Regulation ? Fluid Capacity: Must include an integrated, heavy-duty insulated water storage tank with a minimum capacity of 325 gallons to guarantee a minimum of 15minutes of continuous tepid water flow. ? Tepid Water Delivery: Must feature an integrated, electrical immersion heating system (minimum 1,200 Watts) to actively maintain stored water temperatures above the ANSI-mandated minimum of 60?F (15.6?C) in freezing or cold-weather conditions ? Freeze Protection: Must utilize a self-regulating heat trace system to protect plumbing and supply lines from freezing down to an ambient operating temperature threshold of 0?F (-17.8?C) ________________________________________???? Pneumatic Operation and Mechanical Specifications ? Pumping System: Must utilize a pneumatically driven transfer pump (rather than electric) to deliver pressurized water to the showerhead and eyewash . This ensures complete spark-free operation in C1D2 zones and allows the unit to safely function during electrical outages via pneumatic backup ?Pneumatic Air Source Input: Must support a shop air compressor supply or specialized nitrogen tank supply with an operational pressure range of 60 to 120 PSI (recommended regulator set to 80 PSI) ? Flow Rates: ? Shower: Must deliver a regulated flow rate of at least 20 GPM (76 LPM) ? Eyewash: Must deliver a regulated flow rate of at least 0.4 GPM(1.5 LPM) with an integrated protective dust/debris cover________________________________________ ???? Structural and Mounting Specifications ? Skid-Mount Design: Must be built on a heavy-duty, corrosion-resistant, powder-coated steel skid frame designed for rapid deployment, positioning by forklift/crane, and high-wind structural stability. ? Footprint and Portability: Must maintain a compact, space-saving footprint suitable for deployment in tight industrial spaces, remote airfields, or forward operating environments ? Material Durability: All critical external piping and the showerhead assembly must be constructed from durable stainless steel or equivalent corrosion-resistant materials. ? Controls and Activation: Must feature a highly visible, easy-to-reach mechanical pull-handle mechanism for instant, hands-free activation of the shower ________________________________________ ? Power Requirements ?Electrical Input: Must operate on standard, readily available utility or generator power:120V, single-phase, 60Hz, 20-Amp draw (typically utilizing a NEMA 5-20 plug configuration)

Official SAM.gov Contract Opportunities file extract description for this notice. CaptureIQ does not generate or rewrite this text.

Related Federal Opportunities

Why this matters

  • This notice is a combined synopsis/solicitation.
  • The listed response deadline is Aug 18, 2026.
  • 3 related opportunities share this NAICS.

Related federal terms

  • NAICS — North American Industry Classification System
  • PSC — Product Service Code

Market context

4 Related OpportunitiesMatching opportunities on RFPCapture

Related intelligence

Research and capture tools

This notice carries an explicit small-business set-aside designation.

← All federal opportunities · Federal Opportunity Research

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.