SAM.gov listing

Sand Trail Phase II

Agriculture, Department of → FOREST Service → USDA FOREST ServiceCombined Synopsis/SolicitationSolicitation 1240BJ26Q0021

Response deadline

Tue, Sep 8, 2026, 1:00 PM EDT

Product Service Code

PSC Z1LB
Analyze This Opportunity in CaptureIQ

Compare your company's capabilities against this federal opportunity using CaptureIQ.

Ready to Pursue This Opportunity?

Qualify the fit, analyze competitors, identify teaming partners, and generate review-ready materials — all in CaptureIQ.

  • Federal capture workflow
  • Competitor & teaming intelligence
  • Proposal preparation

Opportunity details

NAICS
237990
Notice type
Combined Synopsis/Solicitation
Set-aside
Small Business Set Aside - Total
Original posted
August 7, 2026
Last updated
October 18, 2026
Notice ID
e22d0da3a20f4a10ac77e03e930bc46a

Summary

This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation. Quotations are being requested and a separate written solicitation will not be issued. Solicitation number 1240BJ26Q0021 is issued as a Request for Quotation (RFQ). This project is located on the Cordova Ranger District. This contract aims to repair and mitigate future failures of the USFS Sand Trail infrastructure, trail number 229. The total trail length is 12.20 miles long; this contract will only address the first 1.70 miles of failing trail. The mitigation consists of installing bank armoring with rip rap, and placing sub grade aggregate along the trail. The sub grade aggregate (3” minus) is to be placed as backfill behind the riprap and is incidental to item 201501A. Backfill quantities will vary but the end product is to have ~2-4 ft of 3” minus behind the placed riprap. The D-1 aggregate is to be placed on the trail running surface to harden the trail for ATV use. The majority of trail 229 is 6 to 8 feet in width and will require additional clearing and minor excavation depending on type of equipment used. Construction must occur during low water times of year, diversion of smaller channels within the project location will be needed to dewater bank locations. Small diversion for bank armoring is assumed to be conducted with either a dozer or excavator that may operate in the stream channel or along the stream bank. Work must be performed when there is 5 consecutive days below 30F degrees are reached This acquisition is set-aside for small business concerns. The applicable North American Industry Classification Standard Code is 237990 Other Heavy and Civil Engineering Construction. The small business size standard is $45,000,000.00 This acquisition is a Total Small Business Set-Aside. All responsible sources may submit a quotation which will be considered by the agency.

Read Full Official Summary

This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation. Quotations are being requested and a separate written solicitation will not be issued. Solicitation number 1240BJ26Q0021 is issued as a Request for Quotation (RFQ). This project is located on the Cordova Ranger District. This contract aims to repair and mitigate future failures of the USFS Sand Trail infrastructure, trail number 229. The total trail length is 12.20 miles long; this contract will only address the first 1.70 miles of failing trail. The mitigation consists of installing bank armoring with rip rap, and placing sub grade aggregate along the trail. The sub grade aggregate (3” minus) is to be placed as backfill behind the riprap and is incidental to item 201501A. Backfill quantities will vary but the end product is to have ~2-4 ft of 3” minus behind the placed riprap. The D-1 aggregate is to be placed on the trail running surface to harden the trail for ATV use. The majority of trail 229 is 6 to 8 feet in width and will require additional clearing and minor excavation depending on type of equipment used. Construction must occur during low water times of year, diversion of smaller channels within the project location will be needed to dewater bank locations. Small diversion for bank armoring is assumed to be conducted with either a dozer or excavator that may operate in the stream channel or along the stream bank. Work must be performed when there is 5 consecutive days below 30F degrees are reached This acquisition is set-aside for small business concerns. The applicable North American Industry Classification Standard Code is 237990 Other Heavy and Civil Engineering Construction. The small business size standard is $45,000,000.00 This acquisition is a Total Small Business Set-Aside. All responsible sources may submit a quotation which will be considered by the agency.

Official SAM.gov Contract Opportunities file extract description for this notice. CaptureIQ does not generate or rewrite this text.

Related Federal Opportunities

Why this matters

  • This notice is a combined synopsis/solicitation.
  • The listed response deadline is Sep 8, 2026.
  • 4 related opportunities share this NAICS.

Related federal terms

  • NAICS — North American Industry Classification System
  • PSC — Product Service Code

Market context

4 Related OpportunitiesMatching opportunities on RFPCapture

Related intelligence

Research and capture tools

This notice carries an explicit small-business set-aside designation.

← All federal opportunities · Federal Opportunity Research

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.