Response deadline
Mon, Aug 17, 2026, 2:00 PM EDTSupply and Installation of Gasoline Powered Marine Generator
Compare your company's capabilities against this federal opportunity using CaptureIQ.
Opportunity details
- NAICS
- 336612
- Notice type
- Combined Synopsis/Solicitation
- Set-aside
- Small Business Set Aside - Total
- Original posted
- August 6, 2026
- Last updated
- October 18, 2026
- Notice ID
- 4f3dbc47c7314a718214e1a5d21c840d
Summary
USACE Savannah District requires the supply and installation of one new gasoline powered marine generator with a power output of 9 kW or greater. The generator must be a 120V 60Hz water cooled model suitable for marine installation featuring a rear exhaust vent compatible with standard marine exhaust systems. To ensure it fits in the existing deck box the unit dimensions must not exceed 34 inches in length, 20 inches in width, and 20 inches in height. The procurement must include all factory supplied accessories, specifically a wired remote control panel with an on off switch, a control panel cable of at least 30 feet, vibration isolators, and all factory testing documentation and compliance certificates. Installation services must include complete removal of the existing generator and full installation of the new generator set in accordance with the technical specifications.
Read Full Official Summary
USACE Savannah District requires the supply and installation of one new gasoline powered marine generator with a power output of 9 kW or greater. The generator must be a 120V 60Hz water cooled model suitable for marine installation featuring a rear exhaust vent compatible with standard marine exhaust systems. To ensure it fits in the existing deck box the unit dimensions must not exceed 34 inches in length, 20 inches in width, and 20 inches in height. The procurement must include all factory supplied accessories, specifically a wired remote control panel with an on off switch, a control panel cable of at least 30 feet, vibration isolators, and all factory testing documentation and compliance certificates. Installation services must include complete removal of the existing generator and full installation of the new generator set in accordance with the technical specifications.
Related Federal Opportunities
Why this matters
- This notice is a combined synopsis/solicitation.
- The listed response deadline is Aug 17, 2026.
- 3 related opportunities share this NAICS.
Related federal terms
Market context
4 Related OpportunitiesMatching opportunities on RFPCapture