SAM.gov listing

The Radford Army Ammunition Plant (RFAAP) Modernized Pre-Mix and Nitro Cellulose (NC) Dehydration NG3 Facilities

Department of Defense → Department of the Army → AMC → ACC → Mission Installation Contracting Command.419th CSB → W6QM Micc-ft DRUMSources SoughtSolicitation W911S226RA005

Response deadline

Fri, Jan 30, 2026, 3:00 PM EST

Product Service Code

PSC C1EA
Analyze This Opportunity in CaptureIQ

Compare your company's capabilities against this federal opportunity using CaptureIQ.

Ready to Pursue This Opportunity?

Qualify the fit, analyze competitors, identify teaming partners, and generate review-ready materials — all in CaptureIQ.

  • Federal capture workflow
  • Competitor & teaming intelligence
  • Proposal preparation

Opportunity details

NAICS
541330
Notice type
Sources Sought
Original posted
January 9, 2026
Last updated
October 19, 2026
Notice ID
8966196b57b64e34915824c62bc7b111

Summary

The Radford Army Ammunition Plant (RFAAP) NG3 Facility Construction is a multi-phased construction approach geared at addressing the four (4) core processes in NG manufacturing (Nitration, Solventless Slurry/Paste, Multi-base Pre-mix, and NC Dehydration). This project will focus on the Pre-Mix and Nitro Cellulose (NC) Dehydration (Dehy) facilities of the design for the new NG-3 facility. Nitrate Esters (NE), such as Nitroglycerin (NG), are critical additives in the production of double and triple-base propellants. RFAAP currently uses 15,000 lbs. of NG daily (3.5M lbs. annually) to support propellant production, which includes both solventless and solvent propellants. Currently, NG is produced on-site in the NG-2 Area by a single nitrator that is over 30 years old. The facility also has a single Slurry/Paste building and a single Pre-Mix building, both of which are 50 years old. Each of these present a single point failure to production and often cause production interruptions. The objective of this project is to prepare a 30% design for Nitro Cellulose (NC) Dehydration (including NC Shredding), hereinafter referred as NC Dehy, and Pre-Mix facilities at Radford Army Ammunition Plant (RFAAP) using the most modern, safe, environmentally friendly, and automated technologies to the maximum extent feasible.

Read Full Official Summary

The Radford Army Ammunition Plant (RFAAP) NG3 Facility Construction is a multi-phased construction approach geared at addressing the four (4) core processes in NG manufacturing (Nitration, Solventless Slurry/Paste, Multi-base Pre-mix, and NC Dehydration). This project will focus on the Pre-Mix and Nitro Cellulose (NC) Dehydration (Dehy) facilities of the design for the new NG-3 facility. Nitrate Esters (NE), such as Nitroglycerin (NG), are critical additives in the production of double and triple-base propellants. RFAAP currently uses 15,000 lbs. of NG daily (3.5M lbs. annually) to support propellant production, which includes both solventless and solvent propellants. Currently, NG is produced on-site in the NG-2 Area by a single nitrator that is over 30 years old. The facility also has a single Slurry/Paste building and a single Pre-Mix building, both of which are 50 years old. Each of these present a single point failure to production and often cause production interruptions. The objective of this project is to prepare a 30% design for Nitro Cellulose (NC) Dehydration (including NC Shredding), hereinafter referred as NC Dehy, and Pre-Mix facilities at Radford Army Ammunition Plant (RFAAP) using the most modern, safe, environmentally friendly, and automated technologies to the maximum extent feasible.

Official SAM.gov Contract Opportunities file extract description for this notice. CaptureIQ does not generate or rewrite this text.

Related Federal Opportunities

Why this matters

  • This notice is a sources sought.
  • The listed response deadline is Jan 30, 2026.
  • 4 related opportunities share this NAICS.

Related federal terms

  • RFI — Request for Information
  • NAICS — North American Industry Classification System
  • PSC — Product Service Code

Market context

4 Related OpportunitiesMatching opportunities on RFPCapture

Related intelligence

← All federal opportunities · Federal Opportunity Research

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.