Response deadline
Fri, Jan 30, 2026, 3:00 PM ESTThe Radford Army Ammunition Plant (RFAAP) Modernized Pre-Mix and Nitro Cellulose (NC) Dehydration NG3 Facilities
Compare your company's capabilities against this federal opportunity using CaptureIQ.
Opportunity details
- NAICS
- 541330
- Notice type
- Sources Sought
- Original posted
- January 9, 2026
- Last updated
- October 19, 2026
- Notice ID
- 8966196b57b64e34915824c62bc7b111
Summary
The Radford Army Ammunition Plant (RFAAP) NG3 Facility Construction is a multi-phased construction approach geared at addressing the four (4) core processes in NG manufacturing (Nitration, Solventless Slurry/Paste, Multi-base Pre-mix, and NC Dehydration). This project will focus on the Pre-Mix and Nitro Cellulose (NC) Dehydration (Dehy) facilities of the design for the new NG-3 facility. Nitrate Esters (NE), such as Nitroglycerin (NG), are critical additives in the production of double and triple-base propellants. RFAAP currently uses 15,000 lbs. of NG daily (3.5M lbs. annually) to support propellant production, which includes both solventless and solvent propellants. Currently, NG is produced on-site in the NG-2 Area by a single nitrator that is over 30 years old. The facility also has a single Slurry/Paste building and a single Pre-Mix building, both of which are 50 years old. Each of these present a single point failure to production and often cause production interruptions. The objective of this project is to prepare a 30% design for Nitro Cellulose (NC) Dehydration (including NC Shredding), hereinafter referred as NC Dehy, and Pre-Mix facilities at Radford Army Ammunition Plant (RFAAP) using the most modern, safe, environmentally friendly, and automated technologies to the maximum extent feasible.
Read Full Official Summary
The Radford Army Ammunition Plant (RFAAP) NG3 Facility Construction is a multi-phased construction approach geared at addressing the four (4) core processes in NG manufacturing (Nitration, Solventless Slurry/Paste, Multi-base Pre-mix, and NC Dehydration). This project will focus on the Pre-Mix and Nitro Cellulose (NC) Dehydration (Dehy) facilities of the design for the new NG-3 facility. Nitrate Esters (NE), such as Nitroglycerin (NG), are critical additives in the production of double and triple-base propellants. RFAAP currently uses 15,000 lbs. of NG daily (3.5M lbs. annually) to support propellant production, which includes both solventless and solvent propellants. Currently, NG is produced on-site in the NG-2 Area by a single nitrator that is over 30 years old. The facility also has a single Slurry/Paste building and a single Pre-Mix building, both of which are 50 years old. Each of these present a single point failure to production and often cause production interruptions. The objective of this project is to prepare a 30% design for Nitro Cellulose (NC) Dehydration (including NC Shredding), hereinafter referred as NC Dehy, and Pre-Mix facilities at Radford Army Ammunition Plant (RFAAP) using the most modern, safe, environmentally friendly, and automated technologies to the maximum extent feasible.
Related Federal Opportunities
Why this matters
- This notice is a sources sought.
- The listed response deadline is Jan 30, 2026.
- 4 related opportunities share this NAICS.
Related federal terms
Market context
4 Related OpportunitiesMatching opportunities on RFPCapture