Response deadline
Thu, Sep 17, 2026, 4:00 PM EDTTX FW LGA 10(5) Steve Thompson Wildlife Drive
Compare your company's capabilities against this federal opportunity using CaptureIQ.
Opportunity details
- Agency
- Transportation, Department of — Federal Highway Administration.6982af Central Federal LANDS DIVISI
- NAICS
- 237310
- Notice type
- Presolicitation
- Set-aside
- Small Business Set Aside - Total
- Original posted
- September 1, 2026
- Last updated
- October 17, 2026
- Notice ID
- 59b8e11f822345fe8c0b03b9292dcab7
Summary
PROJECT NUMBER: TX FW LGA 10(5) PROJECT NAME: Steve Thompson Wildlife Drive PROJECT DESCRIPTION: The proposed project is in Laguna Atascosa National Wildlife Refuge in Cameron County, Texas approximately 25 miles east of Harlingen, Texas. The existing terrain is flat. SCOPE OF THE WORK: The proposed project includes full depth reclamation of existing driving surface which includes chip seal material, and existing gravel. After completing full-depth reclamation new aggregate surface course will be added to create a driving surface that has a consistent width. The project also includes installation of aluminum gate and a small concrete pad and safety improvement signs and speed bumps. The project includes three (3) alternate bid items for Aggregate Surface Course (TON) with one (1) being awarded. Alternate 1: 2-inches of aggregate surface course added to Bayside Drive and Steve Thompson Wildlife Drive and terminating at Renee’s Overlook Parking Area. Alternate 2: 2-inches of aggregate surface course added to Bayside Drive and Steve Thompson Wildlife Drive. Alternate 3: 3-inches of aggregate surface course added to Bayside Drive and Steve Thompson Wildlife Drive and terminating at Renee’s Overlook Parking Area.
Read Full Official Summary
PROJECT NUMBER: TX FW LGA 10(5) PROJECT NAME: Steve Thompson Wildlife Drive PROJECT DESCRIPTION: The proposed project is in Laguna Atascosa National Wildlife Refuge in Cameron County, Texas approximately 25 miles east of Harlingen, Texas. The existing terrain is flat. SCOPE OF THE WORK: The proposed project includes full depth reclamation of existing driving surface which includes chip seal material, and existing gravel. After completing full-depth reclamation new aggregate surface course will be added to create a driving surface that has a consistent width. The project also includes installation of aluminum gate and a small concrete pad and safety improvement signs and speed bumps. The project includes three (3) alternate bid items for Aggregate Surface Course (TON) with one (1) being awarded. Alternate 1: 2-inches of aggregate surface course added to Bayside Drive and Steve Thompson Wildlife Drive and terminating at Renee’s Overlook Parking Area. Alternate 2: 2-inches of aggregate surface course added to Bayside Drive and Steve Thompson Wildlife Drive. Alternate 3: 3-inches of aggregate surface course added to Bayside Drive and Steve Thompson Wildlife Drive and terminating at Renee’s Overlook Parking Area.
Related Federal Opportunities
Why this matters
- This notice is a presolicitation.
- The listed response deadline is Sep 17, 2026.
- 4 related opportunities share this NAICS.
Related federal terms
Market context
4 Related OpportunitiesMatching opportunities on RFPCapture