SAM.gov listing

VFDs for bridge cranes

Department of Defense → Department of the Army → AMC → ACC → Mission Installation Contracting Command.419th CSB → W6QM Micc-ft DRUMCombined Synopsis/SolicitationSolicitation W911S226U2385

Response deadline

Mon, Jan 5, 2026, 11:00 AM EST

Product Service Code

PSC 3950

NAICS code

NAICS 333923
Analyze This Opportunity in CaptureIQ

Compare your company's capabilities against this federal opportunity using CaptureIQ.

Ready to Pursue This Opportunity?

Qualify the fit, analyze competitors, identify teaming partners, and generate review-ready materials — all in CaptureIQ.

  • Federal capture workflow
  • Competitor & teaming intelligence
  • Proposal preparation

Opportunity details

NAICS
333923
Notice type
Combined Synopsis/Solicitation
Set-aside
Total Small Business Set-Aside (FAR 19.5)
Original posted
December 18, 2025
Last updated
October 19, 2026
Notice ID
6942e538fb344facaac348beaf3a872b

Summary

Scope of Work Project Overview: Provide and install Variable Frequency Drives (VFDs) for two bridge crane hoists (Yale Hoists), ensuring compliance with electrical classification requirements: Class 1, Div. 1, Group D and Class 2, Div. 1, Groups E, F, and G. Both hoists are located indoors and have a hook height of approximately 30 feet. Specific model and serial numbers are as follows: Model: FEW30-31TR10D6 (1 of 2) Serial: CK2334RM (1 of 2) Level of Service The contractor shall provide a complete turnkey solution for the project. This service level includes providing all necessary labor, materials, equipment, and project management required for the successful installation and commissioning of the VFDs on the two specified bridge cranes. 2 additional enclosures will be required to be mounted to the frame of the bridge crane. The required site visit will determine optimal location. The final deliverable must be a fully operational and integrated system that is compliant with all standards mentioned herein. The contractor is expected to manage all project phases, from the initial site assessment to final documentation and training, ensuring minimal disruption to ongoing operations. 1. Site Assessment: Conduct an initial site assessment to evaluate the existing crane setup and electrical infrastructure. Identify any structural modifications required for the safe and secure installation of the new VFDs, controls, and associated protective enclosures. The contractor will be responsible for executing all necessary and approved structural modifications as part of the turnkey installation. Verify the electrical classification requirements and ensure all necessary safety measures are in place. 2. Equipment Procurement: Procure VFDs suitable for the specified electrical classifications and crane specifications. Ensure all equipment is certified for use in hazardous locations. Include specific model and serial number (FEW30-31TR10D6, CK2334RM) for one of the hoists. 3. Installation: Install VFDs on each of the two bridge cranes, following manufacturer guidelines and safety protocols. Ensure proper wiring and connections are made to integrate the VFDs with the existing crane control systems. Install necessary protective enclosures and grounding to meet the specified electrical classifications. 4. Testing and Commissioning: Perform initial testing of the VFDs to ensure proper functionality and integration with the crane systems. Conduct load testing to verify the performance and safety of the VFDs under operational conditions. Make any necessary adjustments or calibrations to optimize performance. 5. Documentation: Provide detailed documentation of the installation process, including wiring diagrams, equipment specifications, and safety compliance records. Submit final reports and test results to the project stakeholders. 6. Training: Provide training to crane operators and maintenance personnel on the operation and maintenance of the new VFDs. Ensure all personnel are familiar with the safety protocols and emergency procedures related to the VFDs. 7. Warranty and Support: Provide a warranty for the installed VFDs and offer ongoing support for any issues or maintenance needs. 8. Project Timeline: The period of performance for this contract is six (6) months, beginning March 1, 2026. All work, including site assessment, procurement, installation, testing, commissioning, and training, must be completed within this timeframe. The offeror must provide a detailed project timeline with milestones for each phase of the project that fits within this required period of performance. 9. Safety Compliance: Ensure all work is performed in accordance with relevant safety standards and regulations, including NFPA 70 (National Electrical Code) and OSHA requirements.

Read Full Official Summary

Scope of Work Project Overview: Provide and install Variable Frequency Drives (VFDs) for two bridge crane hoists (Yale Hoists), ensuring compliance with electrical classification requirements: Class 1, Div. 1, Group D and Class 2, Div. 1, Groups E, F, and G. Both hoists are located indoors and have a hook height of approximately 30 feet. Specific model and serial numbers are as follows: Model: FEW30-31TR10D6 (1 of 2) Serial: CK2334RM (1 of 2) Level of Service The contractor shall provide a complete turnkey solution for the project. This service level includes providing all necessary labor, materials, equipment, and project management required for the successful installation and commissioning of the VFDs on the two specified bridge cranes. 2 additional enclosures will be required to be mounted to the frame of the bridge crane. The required site visit will determine optimal location. The final deliverable must be a fully operational and integrated system that is compliant with all standards mentioned herein. The contractor is expected to manage all project phases, from the initial site assessment to final documentation and training, ensuring minimal disruption to ongoing operations. 1. Site Assessment: Conduct an initial site assessment to evaluate the existing crane setup and electrical infrastructure. Identify any structural modifications required for the safe and secure installation of the new VFDs, controls, and associated protective enclosures. The contractor will be responsible for executing all necessary and approved structural modifications as part of the turnkey installation. Verify the electrical classification requirements and ensure all necessary safety measures are in place. 2. Equipment Procurement: Procure VFDs suitable for the specified electrical classifications and crane specifications. Ensure all equipment is certified for use in hazardous locations. Include specific model and serial number (FEW30-31TR10D6, CK2334RM) for one of the hoists. 3. Installation: Install VFDs on each of the two bridge cranes, following manufacturer guidelines and safety protocols. Ensure proper wiring and connections are made to integrate the VFDs with the existing crane control systems. Install necessary protective enclosures and grounding to meet the specified electrical classifications. 4. Testing and Commissioning: Perform initial testing of the VFDs to ensure proper functionality and integration with the crane systems. Conduct load testing to verify the performance and safety of the VFDs under operational conditions. Make any necessary adjustments or calibrations to optimize performance. 5. Documentation: Provide detailed documentation of the installation process, including wiring diagrams, equipment specifications, and safety compliance records. Submit final reports and test results to the project stakeholders. 6. Training: Provide training to crane operators and maintenance personnel on the operation and maintenance of the new VFDs. Ensure all personnel are familiar with the safety protocols and emergency procedures related to the VFDs. 7. Warranty and Support: Provide a warranty for the installed VFDs and offer ongoing support for any issues or maintenance needs. 8. Project Timeline: The period of performance for this contract is six (6) months, beginning March 1, 2026. All work, including site assessment, procurement, installation, testing, commissioning, and training, must be completed within this timeframe. The offeror must provide a detailed project timeline with milestones for each phase of the project that fits within this required period of performance. 9. Safety Compliance: Ensure all work is performed in accordance with relevant safety standards and regulations, including NFPA 70 (National Electrical Code) and OSHA requirements.

Official SAM.gov Contract Opportunities file extract description for this notice. CaptureIQ does not generate or rewrite this text.

Related Federal Opportunities

Why this matters

  • This notice is a combined synopsis/solicitation.
  • The listed response deadline is Jan 5, 2026.
  • 2 related opportunities share this NAICS.

Related federal terms

  • NAICS — North American Industry Classification System
  • PSC — Product Service Code

Market context

4 Related OpportunitiesMatching opportunities on RFPCapture

Related intelligence

Research and capture tools

This notice carries an explicit small-business set-aside designation.

← All federal opportunities · Federal Opportunity Research

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.