SAM.gov listing

W045--Boiler Rental

Veterans Affairs, Department Of.242-network Contract Office 02 (36c242)Combined Synopsis/SolicitationSolicitation 36C24227Q0042

Response deadline

Wed, Oct 21, 2026, 2:00 PM EDT

Product Service Code

PSC W045
Analyze This Opportunity in CaptureIQ

Compare your company's capabilities against this federal opportunity using CaptureIQ.

Ready to Pursue This Opportunity?

Qualify the fit, analyze competitors, identify teaming partners, and generate review-ready materials — all in CaptureIQ.

  • Federal capture workflow
  • Competitor & teaming intelligence
  • Proposal preparation

Opportunity details

NAICS
238220
Notice type
Combined Synopsis/Solicitation
Original posted
October 20, 2026
Last updated
October 21, 2026
Notice ID
509ba052ef7e44a1b2d26b76c7b16c20

Summary

36C24227Q0042 Mod 2 Answers to questions submitted: Q1: What is the observed historical peak steam load of the facility? A1: 120,000 lb./hr. Q2: Will the Montrose VAMC waive the requirements of the VHA Safety Device and Testing Manual? A2: No. Q3: Air permits for emissions are the responsibility of the entity operating/generating the emission, not the owner of the equipment. Please clarify. A3: VA only, not the vendor. Q4: Will the VA change the 9PPM NOx requirement to 30 PPM? A4: No. Q5: Please clarify the size of the Boiler. A5: 800 HP Q6: Will fuel for the rental boiler be furnished by the Government of the Contractor? A6: Government Q7: Confirm intended placement and connection routing if boiler placement is on the south end but connections are at the north end? A7: East side of the plant (end near Boiler 1 near Building 24 hazmat storage area) Q8: What is the required installation and ready for service date? A8: Installation 11/1/2026. Ready for service 12/1/2026. Q9. Is a rental unit rated at about 30ppm NOx on natural gas acceptable for the temporary heating period, given that it is a temporary rental operating under the facility s existing permit? A9. Yes Q10. If 9 ppm NOx is mandatory, will the Government accept a unit fitted with flue gas recirculation (FGR) or selective catalytic reduction (SCR) to meet it, and will any additional time be allowed for delivery? A10. The most important factor is that the vendor make the delivery date, so the 9-ppm cis is not a deal breaker. Q11. The requirement lists a 95 PSIG operating pressure but also references 35,000 lb./hr. at 212° F and a 15 PSIG code. What operating pressure should the rental boiler be size for? A11. 95 PSI is sufficient. Q12. Can a portable day tank with a capacity of 10,000 gallons be placed next to the portable boiler in lieu of installing a return line several hundred feet across to the opposite end of the boiler plant? A12. No. ** Please acknowledge all amendments with your response**

Read Full Official Summary

36C24227Q0042 Mod 2 Answers to questions submitted: Q1: What is the observed historical peak steam load of the facility? A1: 120,000 lb./hr. Q2: Will the Montrose VAMC waive the requirements of the VHA Safety Device and Testing Manual? A2: No. Q3: Air permits for emissions are the responsibility of the entity operating/generating the emission, not the owner of the equipment. Please clarify. A3: VA only, not the vendor. Q4: Will the VA change the 9PPM NOx requirement to 30 PPM? A4: No. Q5: Please clarify the size of the Boiler. A5: 800 HP Q6: Will fuel for the rental boiler be furnished by the Government of the Contractor? A6: Government Q7: Confirm intended placement and connection routing if boiler placement is on the south end but connections are at the north end? A7: East side of the plant (end near Boiler 1 near Building 24 hazmat storage area) Q8: What is the required installation and ready for service date? A8: Installation 11/1/2026. Ready for service 12/1/2026. Q9. Is a rental unit rated at about 30ppm NOx on natural gas acceptable for the temporary heating period, given that it is a temporary rental operating under the facility s existing permit? A9. Yes Q10. If 9 ppm NOx is mandatory, will the Government accept a unit fitted with flue gas recirculation (FGR) or selective catalytic reduction (SCR) to meet it, and will any additional time be allowed for delivery? A10. The most important factor is that the vendor make the delivery date, so the 9-ppm cis is not a deal breaker. Q11. The requirement lists a 95 PSIG operating pressure but also references 35,000 lb./hr. at 212° F and a 15 PSIG code. What operating pressure should the rental boiler be size for? A11. 95 PSI is sufficient. Q12. Can a portable day tank with a capacity of 10,000 gallons be placed next to the portable boiler in lieu of installing a return line several hundred feet across to the opposite end of the boiler plant? A12. No. ** Please acknowledge all amendments with your response**

Official SAM.gov notice description for this notice. CaptureIQ does not generate or rewrite this text.

Related Federal Opportunities

Why this matters

  • This notice is a combined synopsis/solicitation.
  • The listed response deadline is Oct 21, 2026.
  • 4 related opportunities share this NAICS.

Related federal terms

  • NAICS — North American Industry Classification System
  • PSC — Product Service Code

Market context

4 Related OpportunitiesMatching opportunities on RFPCapture

Related intelligence

Research and capture tools

1-day response window — compare with federal posting-to-deadline benchmarks.

← All federal opportunities · Federal Opportunity Research

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.