SAM.gov listing

Y1AZ--Project 526-14-115 Renovate CLC Recreation and Dining Area

Veterans Affairs, Department Of.242-network Contract Office 02 (36c242)SolicitationSolicitation 36C24226B0049

Response deadline

Mon, Sep 14, 2026, 2:00 PM EDT
Analyze This Opportunity in CaptureIQ

Compare your company's capabilities against this federal opportunity using CaptureIQ.

Ready to Pursue This Opportunity?

Qualify the fit, analyze competitors, identify teaming partners, and generate review-ready materials — all in CaptureIQ.

  • Federal capture workflow
  • Competitor & teaming intelligence
  • Proposal preparation

Opportunity details

NAICS
236220
Notice type
Solicitation
Original posted
August 10, 2026
Last updated
October 18, 2026
Notice ID
abc3291cd4cb40a99d2782f8923e1eaa

Summary

Page 4 of 4 THIS IS A PRE-SOLICITATION NOTICE ONLY Project No. 526-14-115; Renovate CLC Recreation and Dining Area at the James J. Peters VA Medical Center, Bronx, New York. CONSTRUCTION SERVICES Renovate CLC Recreation and Dining Area Scope of Work Statement of Work: This is a construction contract for the James J. Peters Veterans Affairs Medical Center, 130 West Kingsbridge Road, Bronx, New York 10468 to furnish all supervision, labor, equipment, and material necessary to renovate the CLC Recreation and Dining Area in accordance with the plans and specifications. All work shall be completed in accordance with all published applicable local/state/federal/national codes, ordinances, and regulations, along with all related VA directives, design guides and manuals, and standards plus all VA requirements (federal or local) that are project specific to the documented scope of work on this site. Contractor must visit site and meet with Contracting Officer s Representative (COR) prior to bidding. Scope of Work: Construction services will include but are not limited to Architectural, HVAC, Plumbing, Mechanical, Electrical, Sprinkler and Communication (telephone and data), as well as other considerations, to renovate the dining area and recreation space on 1st Floor of Building 106 Community Living Center (CLC). Install new flooring, ceiling, lighting, wall finish. Furnish existing bathrooms with new fixtures and finishes. Create a storage space for recreation materials. Install new HVAC, Plumbing, Mechanical, Electrical, Sprinkler and Communication (telephone and data) to support the new design. Include repairs to the atrium area as listed below; Modify sliding door operators so they don t open with unintended motion. Reseal all glass. Design flashing at the connection to the building to prevent leaks. Design for benches resistant to burns. Replace shade rollers. Replace heating and cooling system; provide direct digital control system integrated with existing. Replace lighting. Provide electrical receptacles as appropriate. Install a nurse call system. Repair windows. Replace metal panels throughout. Address drainage issues at the doorways to eliminate flooding. Replace quarry tile. Clean all brickwork. All work must be compliant with VA specs and design guides located in the VA TILL (Technical Information Library: https://www.cfm.va.gov/til/). The C&A requirements do not apply, and a Security Accreditation Package is not required. PROJECT TASKS: Architectural 1. Sunroom a) Remove existing sunroom assembly replace with aluminum storefront window unit units with insulated glazing and new vestibule with automatic entrance doors at opening in the former covered arcade wall openings. b) Install new standing seam metal roof, with gutter and downspout. c) Remove existing tile flooring and wood benches. d) Install new partition wall assembly over exposed masonry work perimeter walls to be insulated. e) Install new floor and suspended acoustical ceiling system. f) Install exterior trench drawing at location of new vestibule entrance connect to existing storm system. g) Remove the sunroom low-height wall and slab. 2. Restrooms a) Replace existing toilets and urinals with ADA fixtures with motion sensor flush valve. b) Replace existing wall mounted sinks with countertop mounted sinks with motion sensor faucet and mixing valves. c) Add new toilet stall grab bars (per ADA requirements), toilets and urinal screens. d) Add motion sensor hand dryers e) Replace existing base board heater with more efficient unit f) Floor and wall tile to remain, walls to be repainted option to replace tile work pending project cost estimates. g) Replace urinal flush valves with motion sensor fixtures. 3. CLC Room a) Remove existing aluminum storefront window separation sunroom and CLC space. b) Removal of the following: existing casework, VCT flooring, glass block wall assembly, suspended ceiling assembly, lighting all existing wall finish décor. c) Existing housekeeping, recreational therapy office, operable partition wall and dietitian room to be removed. Existing electrical room to remain d) Install electric door hold openers for CLC entrance door (to be coordinate with existing fire alarm system) revise existing egress hardware as required. e) Fish tank relocated to 2nd floor 4. Kitchen/Dining Provide full-size refrigerator, storage for trash collection and food warming cart(s). 5. Creative Arts Eliminate proposed wall adjacent to existing electrical closet to maintain access to Corridor 1A7. 6. Library/Study Computer Stations a) Modify computer station to incorporate concealed (lockable) storage for the CPU units. b) Provide countertop space for printer/copier equipment c) Provide a PAC computer workstation adjacent to the general storage room. 7. Salon Area Provide vanity sink at casework. 8. Entertainment Area a. Maintain TV/ entertainment zone, propose designs to also allow the area to serve a performance area b. Moveable platform stage (part of VA s FEE package) c. Relocate A/V equipment to proposed Sound Studio area d. Provide ceiling mounted projector and wall mounted projection screen 9. Staff Office & Large General Storage a. Re-configure staff office and adjacent general storage area to provide workstations for 4-6 people. b. Provide refrigerator in general storage for staff. c. Provide fixed (built-in) and open (VA furnished) shelving. 10. Sound Studio a. Replace proposed lounge area with audio sound studio. b. Relocate A/V equipment to proposed Sound Studio area Electrical Demolition: The existing electrical devices indicated on the electrical demolition plan shall be removed back to source, refer to electrical demolition plan for further information. Lighting Plan: Remove existing fluorescent lighting replace with a multi-layered lighting scheme (combination emergency, task and decorative lighting). All lighting to be on dimmers (except EM lighting) Lighting includes energy efficient LED light fixtures throughout the space, new light fixtures shall be dimmed via dimmer panel located within the space, light fixtures located in: storage rooms, bathrooms and offices shall be controlled via occupancy sensors located within the space, refer to lighting plan for further information. Power Plan: New receptacles throughout the space, refer to power drawing for further information. Use existing panel boards to power the new lighting system and receptacles, re-use existing spare circuit breakers that were made available because of the demolition work performed. Low voltage Systems: Include a junction box with ¾ empty conduit routed up into the accessible ceiling space with bush conduit end and pull strings within the empty conduit system, at each low voltage device. The low voltage contractor shall provide finish cover plate at each device; pull wiring from device to existing equipment. The low voltage contractor to provide fully engineered shop drawings signed by licensed RCDD prior to beginning work. Mechanical/Plumbing Narrative Plumbing Demolition: - Demolish all existing plumbing fixtures branch piping for domestic hot and cold water, sanitary and vent piping back to mains. Demolish any abandoned piping or equipment to make way for new systems. New Work: - All plumbing tie-ins shall be to where plumbing mains riser are located, in shafts. - Install new floor mounted, rear discharge toilets, lavatories and urinals per plans. - Install new hot water, hot water return and cold domestic water, sanitary and vent piping per plans, and make new connections to existing main risers. HVAC Demolition: - Demolish all existing air grilles registers and diffusers, branch ductwork, hot water branch piping, and terminal units serving the area of work. New Work: - Install new terminal units, grilles, registers and diffusers, terminal units, branch piping and thermostats. Connect to existing supply and exhaust mains in area. Supply shall be approximately 55 degree air to the new terminal units with reheat. Reheat coils will be generously sized to prevent over cooling of patient areas. - A new Return air fan and riser will be installed to increase the amount of return air back to the AHU as the existing system accommodates a large amount of exhaust air that is no longer required. - A ducted return system will be provided with balancing dampers. - Exhaust shall be via existing exhaust connections. Exhaust requirements will be minimal and for new toilets. Fire Protection Existing sprinklers and associated piping shall be added/relocated as necessary to accommodate the new floor plan and ceiling layouts. Piping shall be relocated as necessary to coordinate with other trades. Sprinkler zones shall match smoke compartment boundaries. Sprinkler systems shall remain in service at all times. Outages shall be coordinated with the VA with 48 hour notice. Phasing All work shall be coordinated with the VA COR. Required shutdowns shall be coordinated with the station at a minimum of 4 weeks prior to requested time unless otherwise directed by the VA COR. Scheduling shall be completed to ensure minimal disruption to operations. All equipment connections shall be verified prior to the start of work or any scheduled disruptions to service. Some periods of performance may need to be completed during off hours (night and weekend) as required by the VA COR. REQUIREMENTS: Safety/Site Control Contractor must install ICRA hard barriers for each phase of work for dust and/or infection control prior to start of construction. Furnish and install temporary construction barrier walls with secure 45-minute rated construction access door and hardware. Construction barrier walls shall be 1-hour rated, extend to underside of deck above and all penetrations are fire stopped. Supply, install and maintain walk-off tacky mats. Shall replace tacky mats in timely fashion when they are soiled. Maintain negative pressure machine in the project site. Contractor to abide with all in house policies such as safety, ID badges, security, etc. Alternate entrance is always secured and never to be left open while contractor is off site. Quality Control/Assurance Quality Control and Schedules must be in accordance with VA specifications. Follow manufacturer s instructions for inspecting and installing new equipment and fixtures. Provide submittal log of all material and applicable equipment, procedures, and certifications to the COR for approval, prior to starting construction. Any drawings provided may not be up to date and must be field verified by contractor for accuracy. Provide a critical spare parts list with pricing and warranty information for all installed fixtures. Coordination and Housekeeping Plan If any utilities need to be shut off for demolition or installation, a coordination plan shall be provided to the COR for approval, at least four weeks prior to work being performed. The contractor shall maintain a clean work environment, keeping surfaces in the area free of dust and debris. Dry sweeping or compressed air for cleanup is not authorized. At the end of each work period (not longer than 8 hours), the contractor shall use a HEPA vacuum to ensure all dust and debris have been properly collected and contained for disposal. If the COR and/or designated representative finds the area unacceptable, the contractor, at his/her own cost, shall re-clean until acceptance is gained. The contractor is to perform the necessary corrective action immediately without exception. The contractor shall be responsible for the cleanup and removal of all trash and debris from VA property after the Government s final acceptance of work. The contractor shall comply with local/state/federal/national, OSHA, EPA, and all other applicable codes, ordinances, and regulations governing the proper handling, disposal, and removal of all waste and debris. Deliverables Project deliverables include the following: MS project schedule within 45 days of NTP. Include procurement of mat

Read Full Official Summary

Page 4 of 4 THIS IS A PRE-SOLICITATION NOTICE ONLY Project No. 526-14-115; Renovate CLC Recreation and Dining Area at the James J. Peters VA Medical Center, Bronx, New York. CONSTRUCTION SERVICES Renovate CLC Recreation and Dining Area Scope of Work Statement of Work: This is a construction contract for the James J. Peters Veterans Affairs Medical Center, 130 West Kingsbridge Road, Bronx, New York 10468 to furnish all supervision, labor, equipment, and material necessary to renovate the CLC Recreation and Dining Area in accordance with the plans and specifications. All work shall be completed in accordance with all published applicable local/state/federal/national codes, ordinances, and regulations, along with all related VA directives, design guides and manuals, and standards plus all VA requirements (federal or local) that are project specific to the documented scope of work on this site. Contractor must visit site and meet with Contracting Officer s Representative (COR) prior to bidding. Scope of Work: Construction services will include but are not limited to Architectural, HVAC, Plumbing, Mechanical, Electrical, Sprinkler and Communication (telephone and data), as well as other considerations, to renovate the dining area and recreation space on 1st Floor of Building 106 Community Living Center (CLC). Install new flooring, ceiling, lighting, wall finish. Furnish existing bathrooms with new fixtures and finishes. Create a storage space for recreation materials. Install new HVAC, Plumbing, Mechanical, Electrical, Sprinkler and Communication (telephone and data) to support the new design. Include repairs to the atrium area as listed below; Modify sliding door operators so they don t open with unintended motion. Reseal all glass. Design flashing at the connection to the building to prevent leaks. Design for benches resistant to burns. Replace shade rollers. Replace heating and cooling system; provide direct digital control system integrated with existing. Replace lighting. Provide electrical receptacles as appropriate. Install a nurse call system. Repair windows. Replace metal panels throughout. Address drainage issues at the doorways to eliminate flooding. Replace quarry tile. Clean all brickwork. All work must be compliant with VA specs and design guides located in the VA TILL (Technical Information Library: https://www.cfm.va.gov/til/). The C&A requirements do not apply, and a Security Accreditation Package is not required. PROJECT TASKS: Architectural 1. Sunroom a) Remove existing sunroom assembly replace with aluminum storefront window unit units with insulated glazing and new vestibule with automatic entrance doors at opening in the former covered arcade wall openings. b) Install new standing seam metal roof, with gutter and downspout. c) Remove existing tile flooring and wood benches. d) Install new partition wall assembly over exposed masonry work perimeter walls to be insulated. e) Install new floor and suspended acoustical ceiling system. f) Install exterior trench drawing at location of new vestibule entrance connect to existing storm system. g) Remove the sunroom low-height wall and slab. 2. Restrooms a) Replace existing toilets and urinals with ADA fixtures with motion sensor flush valve. b) Replace existing wall mounted sinks with countertop mounted sinks with motion sensor faucet and mixing valves. c) Add new toilet stall grab bars (per ADA requirements), toilets and urinal screens. d) Add motion sensor hand dryers e) Replace existing base board heater with more efficient unit f) Floor and wall tile to remain, walls to be repainted option to replace tile work pending project cost estimates. g) Replace urinal flush valves with motion sensor fixtures. 3. CLC Room a) Remove existing aluminum storefront window separation sunroom and CLC space. b) Removal of the following: existing casework, VCT flooring, glass block wall assembly, suspended ceiling assembly, lighting all existing wall finish décor. c) Existing housekeeping, recreational therapy office, operable partition wall and dietitian room to be removed. Existing electrical room to remain d) Install electric door hold openers for CLC entrance door (to be coordinate with existing fire alarm system) revise existing egress hardware as required. e) Fish tank relocated to 2nd floor 4. Kitchen/Dining Provide full-size refrigerator, storage for trash collection and food warming cart(s). 5. Creative Arts Eliminate proposed wall adjacent to existing electrical closet to maintain access to Corridor 1A7. 6. Library/Study Computer Stations a) Modify computer station to incorporate concealed (lockable) storage for the CPU units. b) Provide countertop space for printer/copier equipment c) Provide a PAC computer workstation adjacent to the general storage room. 7. Salon Area Provide vanity sink at casework. 8. Entertainment Area a. Maintain TV/ entertainment zone, propose designs to also allow the area to serve a performance area b. Moveable platform stage (part of VA s FEE package) c. Relocate A/V equipment to proposed Sound Studio area d. Provide ceiling mounted projector and wall mounted projection screen 9. Staff Office & Large General Storage a. Re-configure staff office and adjacent general storage area to provide workstations for 4-6 people. b. Provide refrigerator in general storage for staff. c. Provide fixed (built-in) and open (VA furnished) shelving. 10. Sound Studio a. Replace proposed lounge area with audio sound studio. b. Relocate A/V equipment to proposed Sound Studio area Electrical Demolition: The existing electrical devices indicated on the electrical demolition plan shall be removed back to source, refer to electrical demolition plan for further information. Lighting Plan: Remove existing fluorescent lighting replace with a multi-layered lighting scheme (combination emergency, task and decorative lighting). All lighting to be on dimmers (except EM lighting) Lighting includes energy efficient LED light fixtures throughout the space, new light fixtures shall be dimmed via dimmer panel located within the space, light fixtures located in: storage rooms, bathrooms and offices shall be controlled via occupancy sensors located within the space, refer to lighting plan for further information. Power Plan: New receptacles throughout the space, refer to power drawing for further information. Use existing panel boards to power the new lighting system and receptacles, re-use existing spare circuit breakers that were made available because of the demolition work performed. Low voltage Systems: Include a junction box with ¾ empty conduit routed up into the accessible ceiling space with bush conduit end and pull strings within the empty conduit system, at each low voltage device. The low voltage contractor shall provide finish cover plate at each device; pull wiring from device to existing equipment. The low voltage contractor to provide fully engineered shop drawings signed by licensed RCDD prior to beginning work. Mechanical/Plumbing Narrative Plumbing Demolition: - Demolish all existing plumbing fixtures branch piping for domestic hot and cold water, sanitary and vent piping back to mains. Demolish any abandoned piping or equipment to make way for new systems. New Work: - All plumbing tie-ins shall be to where plumbing mains riser are located, in shafts. - Install new floor mounted, rear discharge toilets, lavatories and urinals per plans. - Install new hot water, hot water return and cold domestic water, sanitary and vent piping per plans, and make new connections to existing main risers. HVAC Demolition: - Demolish all existing air grilles registers and diffusers, branch ductwork, hot water branch piping, and terminal units serving the area of work. New Work: - Install new terminal units, grilles, registers and diffusers, terminal units, branch piping and thermostats. Connect to existing supply and exhaust mains in area. Supply shall be approximately 55 degree air to the new terminal units with reheat. Reheat coils will be generously sized to prevent over cooling of patient areas. - A new Return air fan and riser will be installed to increase the amount of return air back to the AHU as the existing system accommodates a large amount of exhaust air that is no longer required. - A ducted return system will be provided with balancing dampers. - Exhaust shall be via existing exhaust connections. Exhaust requirements will be minimal and for new toilets. Fire Protection Existing sprinklers and associated piping shall be added/relocated as necessary to accommodate the new floor plan and ceiling layouts. Piping shall be relocated as necessary to coordinate with other trades. Sprinkler zones shall match smoke compartment boundaries. Sprinkler systems shall remain in service at all times. Outages shall be coordinated with the VA with 48 hour notice. Phasing All work shall be coordinated with the VA COR. Required shutdowns shall be coordinated with the station at a minimum of 4 weeks prior to requested time unless otherwise directed by the VA COR. Scheduling shall be completed to ensure minimal disruption to operations. All equipment connections shall be verified prior to the start of work or any scheduled disruptions to service. Some periods of performance may need to be completed during off hours (night and weekend) as required by the VA COR. REQUIREMENTS: Safety/Site Control Contractor must install ICRA hard barriers for each phase of work for dust and/or infection control prior to start of construction. Furnish and install temporary construction barrier walls with secure 45-minute rated construction access door and hardware. Construction barrier walls shall be 1-hour rated, extend to underside of deck above and all penetrations are fire stopped. Supply, install and maintain walk-off tacky mats. Shall replace tacky mats in timely fashion when they are soiled. Maintain negative pressure machine in the project site. Contractor to abide with all in house policies such as safety, ID badges, security, etc. Alternate entrance is always secured and never to be left open while contractor is off site. Quality Control/Assurance Quality Control and Schedules must be in accordance with VA specifications. Follow manufacturer s instructions for inspecting and installing new equipment and fixtures. Provide submittal log of all material and applicable equipment, procedures, and certifications to the COR for approval, prior to starting construction. Any drawings provided may not be up to date and must be field verified by contractor for accuracy. Provide a critical spare parts list with pricing and warranty information for all installed fixtures. Coordination and Housekeeping Plan If any utilities need to be shut off for demolition or installation, a coordination plan shall be provided to the COR for approval, at least four weeks prior to work being performed. The contractor shall maintain a clean work environment, keeping surfaces in the area free of dust and debris. Dry sweeping or compressed air for cleanup is not authorized. At the end of each work period (not longer than 8 hours), the contractor shall use a HEPA vacuum to ensure all dust and debris have been properly collected and contained for disposal. If the COR and/or designated representative finds the area unacceptable, the contractor, at his/her own cost, shall re-clean until acceptance is gained. The contractor is to perform the necessary corrective action immediately without exception. The contractor shall be responsible for the cleanup and removal of all trash and debris from VA property after the Government s final acceptance of work. The contractor shall comply with local/state/federal/national, OSHA, EPA, and all other applicable codes, ordinances, and regulations governing the proper handling, disposal, and removal of all waste and debris. Deliverables Project deliverables include the following: MS project schedule within 45 days of NTP. Include procurement of mat

Official SAM.gov Contract Opportunities file extract excerpt for this notice. The stored text is the first 12,000 characters of the normalized official source, not the complete source body. CaptureIQ does not generate or rewrite this text.

Related Federal Opportunities

Why this matters

  • This notice is a solicitation.
  • The listed response deadline is Sep 14, 2026.
  • 4 related opportunities share this NAICS.

Related federal terms

  • RFP — Request for Proposal
  • NAICS — North American Industry Classification System
  • PSC — Product Service Code

Market context

4 Related OpportunitiesMatching opportunities on RFPCapture

Related intelligence

Research and capture tools

Contextual RFPCapture research and free tools related to this public federal page.

← All federal opportunities · Federal Opportunity Research

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.