SAM.gov listing

Y1DA--Project # 596-26-4 – Construction for FMS Boiler Replacement

Veterans Affairs, Department Of.249-network Contract Office 9 (36c249)SolicitationSolicitation 36C24926R0077

Response deadline

Mon, Sep 28, 2026, 10:00 AM EDT
Analyze This Opportunity in CaptureIQ

Compare your company's capabilities against this federal opportunity using CaptureIQ.

Ready to Pursue This Opportunity?

Qualify the fit, analyze competitors, identify teaming partners, and generate review-ready materials — all in CaptureIQ.

  • Federal capture workflow
  • Competitor & teaming intelligence
  • Proposal preparation

Opportunity details

NAICS
238220
Notice type
Solicitation
Original posted
September 23, 2026
Last updated
October 18, 2026
Notice ID
15f6ea8744a24eb5bb2b9f40d2712ec6

Summary

The Franklin R Sousley Campus, 2250 Leestown Rd, Lexington, KY 40511 has a requirement for Project 596-4-1 Boiler replacement. The Contractor shall furnish all labor, supervision, equipment and material for replacement of high efficiency stainless steel condensing hot water boilers in buildings 1, 2, 3, 4, 16 ,25, 28, 201 and 202 (201 and 202 must be propane dual fuel capable) along with necessary ancillary equipment, contractor is to dispose of or recycle all waste, spoils, or excess. At no time between September 1 and May 1 can any building s hot water heating loop remain out of service for more than 4 consecutive hours. All work performed shall be conducted in accordance with all applicable state and federal laws, regulations, codes, VA policies/regulations, specifications, drawings and the SOW. PRODUCT/SERVICE CODE: Y1DA Construction of Hospitals and Infirmaries This will be a 100% set-aside for Service-Disabled Veteran-Owned Small Business concerns under the authority of 38 U.S.C. section 8127(d). NAICS Code 238220 Plumbing, Heating, and Air-Conditioning Contractors. The small business size standard is $19M. The estimated range of construction is between $2,000,000 and $5,000,000. This requirement will be procured per Revolutionary Federal Acquisition Regulation (RFO) Overhaul Part 15, as a Lowest Price Technically Acceptable (LPTA) source selection process. The evaluation factors and sub-factors under consideration for this requirement will be available upon the solicitation release, which is anticipated to be on or by 04 August 2026. This requirement is a 100% set-aside for Service-Disabled Veteran Owned Small Business (SDVOSB) concerns under the authority of 38 U.S.C §8127 (d). To be considered for award, Contractors must be registered and certified by SBA DSBS and registered in the System For Award Management (SAM) database. All offerors are urged to contact the SBA DSBS (https://dsbs.sba.gov/search/dsp_dsbs.cfm) and submit the required documents to obtain verification of their SDVOSB status if they have not already done so. In addition to the requirements as set forth in the solicitation notice (to be issued), the proposed contractor must also be determined responsible in accordance with FAR Part 9. The Contracting Officer will determine responsibility prior to any award being made. Questions related to this requirement will only be addressed in writing by way of email to the Contract Specialist Brian.Bentley@va.gov . The Project Number, Project Name and Solicitation Number must be included in the subject line of all questions related to this requirement. No questions will be considered until the actual solicitation is released. END OF PRE-SOLICITATION NOTICE

Read Full Official Summary

The Franklin R Sousley Campus, 2250 Leestown Rd, Lexington, KY 40511 has a requirement for Project 596-4-1 Boiler replacement. The Contractor shall furnish all labor, supervision, equipment and material for replacement of high efficiency stainless steel condensing hot water boilers in buildings 1, 2, 3, 4, 16 ,25, 28, 201 and 202 (201 and 202 must be propane dual fuel capable) along with necessary ancillary equipment, contractor is to dispose of or recycle all waste, spoils, or excess. At no time between September 1 and May 1 can any building s hot water heating loop remain out of service for more than 4 consecutive hours. All work performed shall be conducted in accordance with all applicable state and federal laws, regulations, codes, VA policies/regulations, specifications, drawings and the SOW. PRODUCT/SERVICE CODE: Y1DA Construction of Hospitals and Infirmaries This will be a 100% set-aside for Service-Disabled Veteran-Owned Small Business concerns under the authority of 38 U.S.C. section 8127(d). NAICS Code 238220 Plumbing, Heating, and Air-Conditioning Contractors. The small business size standard is $19M. The estimated range of construction is between $2,000,000 and $5,000,000. This requirement will be procured per Revolutionary Federal Acquisition Regulation (RFO) Overhaul Part 15, as a Lowest Price Technically Acceptable (LPTA) source selection process. The evaluation factors and sub-factors under consideration for this requirement will be available upon the solicitation release, which is anticipated to be on or by 04 August 2026. This requirement is a 100% set-aside for Service-Disabled Veteran Owned Small Business (SDVOSB) concerns under the authority of 38 U.S.C §8127 (d). To be considered for award, Contractors must be registered and certified by SBA DSBS and registered in the System For Award Management (SAM) database. All offerors are urged to contact the SBA DSBS (https://dsbs.sba.gov/search/dsp_dsbs.cfm) and submit the required documents to obtain verification of their SDVOSB status if they have not already done so. In addition to the requirements as set forth in the solicitation notice (to be issued), the proposed contractor must also be determined responsible in accordance with FAR Part 9. The Contracting Officer will determine responsibility prior to any award being made. Questions related to this requirement will only be addressed in writing by way of email to the Contract Specialist Brian.Bentley@va.gov . The Project Number, Project Name and Solicitation Number must be included in the subject line of all questions related to this requirement. No questions will be considered until the actual solicitation is released. END OF PRE-SOLICITATION NOTICE

Official SAM.gov Contract Opportunities file extract description for this notice. CaptureIQ does not generate or rewrite this text.

Related Federal Opportunities

Why this matters

  • This notice is a solicitation.
  • The listed response deadline is Sep 28, 2026.
  • 4 related opportunities share this NAICS.

Related federal terms

  • RFP — Request for Proposal
  • NAICS — North American Industry Classification System
  • PSC — Product Service Code

Market context

4 Related OpportunitiesMatching opportunities on RFPCapture

Related intelligence

Research and capture tools

5-day response window — compare with federal posting-to-deadline benchmarks.

← All federal opportunities · Federal Opportunity Research

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.