SAM.gov listing

ZERO TURN LAWN MOWER 52 INCH

Department of Defense → Department of the Army → AMC → ACC → Mission Installation Contracting Command.419th CSB → W6QM Micc-ft DRUMCombined Synopsis/SolicitationSolicitation W911S226U3039

Response deadline

Thu, Apr 23, 2026, 12:00 PM EDT

Product Service Code

PSC 2420
Analyze This Opportunity in CaptureIQ

Compare your company's capabilities against this federal opportunity using CaptureIQ.

Ready to Pursue This Opportunity?

Qualify the fit, analyze competitors, identify teaming partners, and generate review-ready materials — all in CaptureIQ.

  • Federal capture workflow
  • Competitor & teaming intelligence
  • Proposal preparation

Opportunity details

NAICS
333112
Notice type
Combined Synopsis/Solicitation
Set-aside
Total Small Business Set-Aside (FAR 19.5)
Original posted
April 16, 2026
Last updated
October 19, 2026
Notice ID
27ccbb325b49485da7ec8eaf6b116dc1

Summary

This machine is equipped with a minimum 27-horsepower, 2-cylinder gasoline engine that features electronic fuel injection, eliminating the need for a choke, and includes a replaceable engine oil filter. It comes with a 52-inch fabricated mowing deck, ROPS bar protection, and greaseable spindles. The unit has a hydrostatic transmission with a cooling fan and a hand-operated parking brake.The mower is designed with front and rear frame-mounted suspension with shock absorbers and has a fuel capacity greater than five gallons. For operator comfort and convenience, it includes an adjustable suspension seat with a seat belt, an easy-access floor plate for mower deck spindle access, a fuel level gauge, a USB port, an hour meter, and a cup holder.The machine will have IUID labels and be delivered to Fort Drum, NY, fully assembled and operational. All operator, service, and parts manuals are to be included. The preferred delivery date is 120 days after the order is placed

Read Full Official Summary

This machine is equipped with a minimum 27-horsepower, 2-cylinder gasoline engine that features electronic fuel injection, eliminating the need for a choke, and includes a replaceable engine oil filter. It comes with a 52-inch fabricated mowing deck, ROPS bar protection, and greaseable spindles. The unit has a hydrostatic transmission with a cooling fan and a hand-operated parking brake.The mower is designed with front and rear frame-mounted suspension with shock absorbers and has a fuel capacity greater than five gallons. For operator comfort and convenience, it includes an adjustable suspension seat with a seat belt, an easy-access floor plate for mower deck spindle access, a fuel level gauge, a USB port, an hour meter, and a cup holder.The machine will have IUID labels and be delivered to Fort Drum, NY, fully assembled and operational. All operator, service, and parts manuals are to be included. The preferred delivery date is 120 days after the order is placed

Official SAM.gov Contract Opportunities file extract description for this notice. CaptureIQ does not generate or rewrite this text.

Related Federal Opportunities

Why this matters

  • This notice is a combined synopsis/solicitation.
  • The listed response deadline is Apr 23, 2026.
  • 2 related opportunities share this NAICS.

Related federal terms

  • NAICS — North American Industry Classification System
  • PSC — Product Service Code

Market context

4 Related OpportunitiesMatching opportunities on RFPCapture

Related intelligence

Research and capture tools

This notice carries an explicit small-business set-aside designation.

← All federal opportunities · Federal Opportunity Research

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.