CAMB Repair Roof & Siding at Old Hangar
Forecast overview
- Subagency
- CBP/Facilities Managemen
- NAICS
- 238990
- Estimated value
- $350K to $500K
- Set-aside
- N/A
- Place of performance
- PR
This project includes localized metal deck repairs, corrosion mitigation, water intrusion control, minor roof improvements, gutters and drains installation at the north elevation of the old hangar at CAMB as an interim measure to stabilize existing conditions and prevent more deterioration. The project also includes an engineering-based assessment of existing metal deck and structural frame so the integrity and performance of the building currently exposed to active corrosion can be evaluated. Acquisition Strategy: This will be a Direct 8(a) award.
Related federal terms
Acquisition timeline
- Source published
- 08/12/2026
- Last verified on RFPCapture
- 2026-08-31
- Estimated award
- Q4 2026 (agency estimate)
- Expected period of performance end
- Q4 2026 (agency estimate)
Why watch this
- Agency planning data cites an estimated value of $350K to $500K.
Market context
- NAICS market
- NAICS 238990
Action links
Track this forecast in CaptureIQ
Source
- Source
- DHS APFS Public Forecast Export
- Source file
- Public Forecast List Acquisition Planning Forecast System (1).csv
- Official source
- Agency forecast source
- Last verified
- 2026-08-31