CAMB Repair Roof & Siding at Old Hangar
Forecast Overview
- NAICS
- 238990
- Estimated value
- $350K to $500K
- Performance end
- Q4 2026
- Set-aside
- N/A
This project includes localized metal deck repairs, corrosion mitigation, water intrusion control, minor roof improvements, gutters and drains installation at the north elevation of the old hangar at CAMB as an interim measure to stabilize existing conditions and prevent more deterioration. The project also includes an engineering-based assessment of existing metal deck and structural frame so the integrity and performance of the building currently exposed to active corrosion can be evaluated. Acquisition Strategy: This will be a Direct 8(a) award.
Source
- Source
- DHS APFS Public Forecast Export
- Source file
- Public Forecast List Acquisition Planning Forecast System (1).csv
- Official source
- Agency forecast source
- Last verified
- 2026-08-31
Related Federal Entities
- Department of Homeland Security
- AM CAB POM Lifters Installation & Boat Ramp Repairs
- Maynard FRC Inner Perimeter Fence Expansion, Modification, and Repair
- Perimeter Fence Upgrade
- 13832139 23HSB_H. Ian: Rebuild Isla De Mona Southeast Light at CG ANT Puerto Rico in San Juan, PR
- Janitorial Services Puerto Rico
- Federal Technology Spending Map
- Federal Opportunity Research