Eagle Pier New Dredging at New London’s City Pier, Connecticut
Forecast Overview
- NAICS
- 237990
- Estimated value
- $2M to $5M
- Performance end
- Q4 2026
- Set-aside
- Full
This project dredges a new area immediately south of Coast Guard Cutter EAGLE’s new berth at New London’s City Pier, Connecticut. The intent is to deepen the area to allow tug boats to assist the cutter for mooring/unmooring at all tide levels. Requirements of the design specify dredging to a depth of -17.0’ at Mean Lower Low Water (MLLW) +2.0’ overdredging allowance. This equates to approximately 3,700 cubic yards (CY) of dredge spoils to removed to an upland disposal site. Offshore disposal is not permitted due to environmental sample analysis of the dredge area. There is an environmental time of year restriction in Connecticut that only permits dredging activities between October 1st and March 1st. The scope of work also includes removals of approximately 50 piles that remain below the waterline. Any piles that cannot be fully removed are to be cut at -21.0’ MLLW.
Source
- Source
- DHS APFS Public Forecast Export
- Source file
- Public Forecast List Acquisition Planning Forecast System (1).csv
- Official source
- Agency forecast source
- Last verified
- 2026-08-31
Related Federal Entities
- Department of Homeland Security
- 30066648 Tower Maintain & Inspect FY26 LANT UXO Support at CEU Miami in Miami, FL
- 29313906 Tower Maintain & Inspect FY26 LANT at CEU Miami in Miami, FL
- 26452282 FY 2026 District 7 and District 8 Major ATON Inspection at CEU Miami in Miami, FL
- 13832139 23HSB_H. Ian: Rebuild Isla De Mona Southeast Light at CG ANT Puerto Rico in San Juan, PR
- 32003058 Major M&R Multiple Bldgs at AIRSTA Miami in Miami, FL
- Federal Technology Spending Map
- Federal Opportunity Research