This project dredges a new area immediately south of Coast Guard Cutter EAGLE’s new berth at New London’s City Pier, Connecticut. The intent is to deepen the area to allow tug boats to assist the cutter for mooring/unmooring at all tide levels. Requirements of the design specify dredging to a depth of -17.0’ at Mean Lower Low Water (MLLW) +2.0’ overdredging allowance. This equates to approximately 3,700 cubic yards (CY) of dredge spoils to removed to an upland disposal site. Offshore disposal is not permitted due to environmental sample analysis of the dredge area. There is an environmental time of year restriction in Connecticut that only permits dredging activities between October 1st and March 1st. The scope of work also includes removals of approximately 50 piles that remain below the waterline. Any piles that cannot be fully removed are to be cut at -21.0’ MLLW.
Related federal terms
Acquisition timeline
- Source published
- 07/09/2026
- Last verified on RFPCapture
- 2026-08-31
- Estimated award
- Q4 2026 (agency estimate)
- Expected period of performance end
- Q4 2026 (agency estimate)
Why watch this
- Agency planning data cites an estimated value of $2M to $5M.
Market context
- NAICS market
- NAICS 237990
Action links
Track this forecast in CaptureIQ
Source
- Source
- DHS APFS Public Forecast Export
- Source file
- Public Forecast List Acquisition Planning Forecast System (1).csv
- Official source
- Agency forecast source
- Last verified
- 2026-08-31