FRC/VSAB 1 Restroom and Nursing Mother's Room Remodels
Forecast overview
- Subagency
- FEMA
- NAICS
- 236220
- Estimated value
- $1M to $2M
- Set-aside
- Full
- Place of performance
- TX
The scope of the project is to remodel all restrooms at the Region 6, Denton Campus, in the Federal Regional Center (FRC) and the Vehicle Storage Administration Building 1 (VSAB1) second (2nd) floor. The entire project will involve remodeling a total of seventeen (17) restrooms. The FRC will include thirteen (13) restrooms and the VSAB 1 second level will include four (4) restrooms. This project will also include converting one restroom into a nursing mother’s room. All restrooms will require painting, tile exchange, new toilet installations, measure sink height to ensure they are ADA compliant. Toilets and sinks shall maintain automatic (no touch) sensor options. Install new paper towel dispensers that have the no touch feature. The Contractor shall install new restrooms partitions that are at least 6’ tall with 6’ full privacy doors, in all restrooms for the toilet areas only. The contractor shall install single wall partitions in between each urinal in the men’s restrooms. The contractor shall fur out all walls that have plumbing showing up to 9’, to cover all piping. Everything above 9’ shall be painted flat black like the Jade room, to camouflage all fixtures above 9’. The contractor shall install new toilets (16”-18” comfort height, oblong shaped), new urinals, manmade solid surface counter- tops with new sinks, new faucets and adhere to plumbing regulations within the facility and maintain the no touch options. The Contractor shall remove any damaged appliance, receptacles, hardware and safely dispose of them. There are details listed below to identify where sinks, faucets, and hardware will need to be replaced. The contractor shall install new light fixtures in all restrooms. The contractor shall install all new feminine dispensers (in women and unisex locations), toilet paper holders, and paper towel dispensers with no touch options in each renovated restroom on campus in both the FRC and VSAB1. The contractor shall remove and independently dispose of old parts and all associated cleanup. The contractor shall provide all labor, materials, tools, equipment, and PPE required to complete this work. The contractor shall remove, dispose of, and replace the existing tile, to include all management, supervision, labor, personnel, transportation, materials, equipment, and supplies necessary to accomplish the work for the VSAB1 and the FRC. All handicapped restrooms will have push button door entry and exits with locking mechanisms to notify that this restroom is in use.
Related federal terms
Ready to assess this forecast?
Acquisition timeline
- Source published
- 06/18/2026
- Last verified on RFPCapture
- 2026-08-31
- Estimated award
- Q4 2026 (agency estimate)
- Expected period of performance end
- Q4 2026 (agency estimate)
Why watch this
- Agency planning data cites an estimated value of $1M to $2M.
See Who Is Likely to Pursue This Forecast →
Market context
- NAICS market
- NAICS 236220
Action links
Source
- Source
- DHS APFS Public Forecast Export
- Source file
- Public Forecast List Acquisition Planning Forecast System (1).csv
- Official source
- Agency forecast source
- Last verified
- 2026-08-31