SBIR/STTR Research Award

High Efficiency Klystrons for Accelerator Applications

Award identifier 343a78dda0d2751d33ccd706be6e61348f18a62eee3466cd1616b5f60acc6db5Awarding agency Department of Energy

Award amount

$1,000,000

Program and phase

SBIR · Phase II

Award year

2018

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Energy
Branch
Not reported
Recipient company
CALABAZAS CREEK RESEARCH, INC.
Proposal award date
2018-08-27
Contract end date
2020-08-26
UEI
M3LBSJNCR1Z5
Solicitation number
DE-FOA-0001795
Topic code
24d

Research abstract

Klystrons are the most commonly used RF sources for high energy accelerators. Their efficiency significantly impacts the acquisition and operating cost of accelerator systems. Higher efficiency RF sources are required to reduce the cost for future accelerators and colliders. Calabazas Creek Research Inc., in collaboration with SLAC National Accelerator Laboratory, is developing a method for optimizing klystron efficiency and applying it to the design of a high-power klystron for a DOE-relevant accelerator project. The research includes the development of codes using a combination of synthesis and simulation, coupled with advance optimization techniques. Computational designs were achieved with efficiencies exceeding 85%. The program investigated two approaches predicted to achieve high efficiency and evaluated trade-offs between the approaches. A design was selected that achieves efficiency exceeding 85% with the simplest circuit configuration. The klystron design will be optimized using several design codes to verify the computational performance. The optimum design will be used to generate the mechanical design, and a prototype klystron will be built and tested at high power. Commercial Applications and Other BenefitsKlystrons are used in many applications, including medical and industrial accelerators, radar, communication, and defense systems. Increased efficiency will result in less expensive devices by reducing fabrication as well as reducing power supply and operating costs.

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Awards with the same topic code

Verified by an exact topic code match. This is not a text-similarity match.

Research funding history

138 SBIR/STTR records share this UEI (1995–2024). Reported award amounts total $43,761,170. Reported amounts are not federal obligations.

Phases: Phase I, Phase II

Agencies: Department of Energy, Department of Defense, National Aeronautics and Space Administration, National Science Foundation

Agency intelligence

Department of Energy

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.