SBIR/STTR Research Award

Permanent Magnet (PM) Induction Heater for Paraffin Abatement

Award identifier 6ab81157c85c7cc065262f5b877b754db5906bad3672dbfeb6c154d445562afbAwarding agency Department of Energy

Award amount

$150,000

Program and phase

STTR · Phase I

Award year

2018

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Energy
Branch
Not reported
Recipient company
AUSTIN GEOTECH SERVICES INC
Proposal award date
2018-04-09
Contract end date
2018-10-08
UEI
Y6NGQQQYJR43
Solicitation number
DE-FOA-0001770
Topic code
20b

Research abstract

One of the major maintenance headaches causing increased operational cost in the production of mature oil wells is the elimination of wax and paraffin buildup in the production tubing. The accumulation over time of paraffin compounds in "cold spots" in the tubing creates high pressures and flow constrictions that contribute to accelerated pump wear, and constrict the flow of fluids to the surface. Currently paraffin formation (which restricts the recovery of hydrocarbons) is managed in a reactive manner when oil production is observed to decrease. Current methods of paraffin removal include hot oiling, chemical treatments and electric heaters powered from the surface with cables. We propose to address this problem proactively by preventing paraffin formation in the tubing by using a permanent magnet induction heater. This will increase hydrocarbon recovery from many of the hundreds of thousands of oil wells in the US. Unlike current methods, this method does not require any external intervention to remove paraffin. It prevents paraffin formation in wells by keeping the oil above the cloud point all the way to the surface. We have built and tested a proof of concept tool and all aspects of the tool perform as analyzed by transient EM Finite Element analysis. We have briefed several oil companies and several oil field tool manufacturers. The oil companies have offered advice on operational requirements and these directives have been incorporated in the design. The tooling companies have advised us to make the device “oil field tough” which involves the selection of steel alloys for some components and the chemically compatible metals for other operational components.

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Awards with the same topic code

Verified by an exact topic code match. This is not a text-similarity match.

Research funding history

3 SBIR/STTR records share this UEI (2018–2022). Reported award amounts total $2,244,896. Reported amounts are not federal obligations.

Phases: Phase II, Phase I

Agencies: Department of Energy

Agency intelligence

Department of Energy

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.