SBIR/STTR Research Award

Aircraft Deck Motion Compensation Design

Award identifier c729dd365d03ec22955944ed6aeec7ecd79b0c5e74dc98ab75fdd7ccce4a4a3fAwarding agency Department of Defense · Navy

Award amount

$999,868

Program and phase

SBIR · Phase II

Award year

2018

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Defense
Branch
Navy
Recipient company
SYSTEMS TECHNOLOGY, INC
Proposal award date
2018-04-04
Contract end date
2022-09-20
UEI
R3DPJ1ZZJAK8
Solicitation number
16.2
Topic code
N162-098

Research abstract

Systems Technology, Inc., with Dr. Eric Johnson’s Research Team at Pennsylvania State University, directly address the Navy SBIR research defined in Topic N162-098, “Aircraft Deck Motion Compensation Design.” The objective of this topic is stated, “Develop deck motion compensation algorithm and control law design methodology and guidance via airborne and/or shipboard sensors … to improve aircraft boarding rate capabilities in high ship motion conditions.” Moreover, the topic states, “A design guidance and conceptual analysis toolset is needed for existing simulation environments to demonstrate the six-degree-of-freedom simulation response of an aircraft during a shipboard recovery.” The objective has been addressed in the Phase I Base Program, where a prototype Rotorcraft Unmanned Aerial System - Deck Motion Compensation toolset (RUAS-DMC) was developed with a detailed RUAS model, a representative ship motion model, and a prototype DMC scheme based on the adaptive Generalized Predictive Control (GPC) algorithm. The Phase I Option Program will further enhance the toolset by incorporating flight test data to make RUAS-DMC more robust, will further advance the GPC-DMC algorithm, and will incorporate alternative guidance and control schemes. This naturally leads to the proposed Phase II Program where RUAS-DMC will be fully matured via extensive software additions and enhancements, extensive Monte Carlo simulations, hardware-in-the-loop tests, and flight tests with a relevant RUAS and ship deck. The Phase II Program focus is on the development of successful guidance and control scheme(s) to improve boarding rates. Moreover, toolset modularity and portability is a goal, so that specific components can be incorporated into existing tools (e.g., CASTLE and MATLAB/Simulink). Generality is also a goal, so that the DMC toolset and scheme(s) are also applicable to fixed-wing carrier landing. At the end of the Phase II Program, RUAS-DMC will be well positioned for transition to Navy acquisition programs PMA-266 and PMA-268.

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Awards with the same topic code

Verified by an exact topic code match. This is not a text-similarity match.

Research funding history

187 SBIR/STTR records share this UEI (1983–2026). Reported award amounts total $58,450,871. Reported amounts are not federal obligations.

Phases: Phase I, Phase II

Agencies: Department of Defense, National Aeronautics and Space Administration, Department of Health and Human Services, Department of Transportation, Department of Agriculture

Agency intelligence

Department of Defense

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.