SBIR/STTR Research Award

Developing A Ground Station For Airborne Wind Energy System

Award identifier 0be6f5ce97118c2601741fb6d92f7e1385946c88687f0909d5e64b8a7476256aAwarding agency Department of Agriculture

Award amount

$100,000

Program and phase

SBIR · Phase I

Award year

2017

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Agriculture
Branch
Not reported
Recipient company
EWINDSOLUTIONS, INC.
Proposal award date
2017-09-01
Contract end date
2018-04-30
UEI
CX93YJJQEHMF
Solicitation number
Not reported
Topic code
8.12

Research abstract

The tether and power generating ground station,are the focus of this proposal. Both these systems have challenges that are unique to the airborne wind energy field. First is the selection and design of the tether itself. This includes the material (e.g. nylon, steel,or composite) and whether to weave in electricity-transmitting wires between the ground station and the flying craft (which would increase its cost and diameter). These wires would be used to power the electronics on the flying craft and facilitate communications with the ground station. All these choices have trade-offs,however. Specifically, the tether will be the main source of aerodynamic drag in the entire system and, thus, one of the key limiting factors in the quantity of electricity produced. The other key system is the ground station itself. This includes several components: the drum and tether management system, electrical generator,and electrical systems that convert noisy renewable energy into smooth, reliable 120V AC for equipment or home use. Conveniently, these converting electrical systems are relatively abundant and a set that fits our exact needs is either commercially available or created with minor modifications. The tether management and electrical generator, however, are much more complex and not commercially available. The tether management system, a combination of custom hardware and custom software, must reliably:-Maintain a desired tension on the tether -Monitor tether tension, reel-out speed, tether-to-ground angle, length deployed, etc. -Maintain reel-out speed to a specific value determined by the wind speed -Monitor and maintain airspeed of the flying craft during launch/landing -Reliably guide the tether onto the drum without crossing layers In aggregate, this creates a complex system of mechanical controls, sensors and software that must work together to maintain consistent flight, maximize power generated, and minimize wear on each component. To maintain consistent tension on the tether requires constantly monitoring and adjusting for differing pull strengths from the flying craft because of changes in wind speed (gusts, lulls) and different aerodynamic lift at each point of the figure-8 flight pattern. To maximize power generated, we do not want any spring or physical braking system to smooth out the tether tension because these forces create drag and friction, wasting energy. Instead, we will use the electrical generator itself as the resistance and rewind motor. A generator and motor are the same physical system, differentiated only by whether electricity is flowing into or out of the device. Therefore, by monitoring the tether tension and reel-out speed, the tether management system can adjust the electrical load (resistance) of the generator to control both variables. The system can also use the generator as a motor to rewind the tether each cycle. In short, by constantly monitoring and maintaining several variables of the system, the tether management system can maximize power generated by clever manipulation of the electrical generator. It must also perform all these tasks flawlessly over the ten-year lifespan of the device while exposed to degrading UV radiation and seasonal weather. Ensuring this level of accuracy and reliability over a decade is a complex engineering challenge. Finally, the electrical generator is novel because it represents one of the biggest advantages our airborne wind energy system has over traditional wind turbines and other airborne competitors. Generators on top of large towers or that are airborne have a premium placed on size and weight for obvious reasons. As a result, they are built from exotic, magnetic materials (e.g. metal-doped ceramics) that are extremely delicate and expensive. They are also physically small. This feeds directly into the fundamental trade-off in generator design: a physically small generator equals higher revolution speeds (e.g. 1,500-2,000 revolutions per minute (r.p.m

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Awards with the same topic code

Verified by an exact topic code match. This is not a text-similarity match.

Research funding history

4 SBIR/STTR records share this UEI (2015–2018). Reported award amounts total $1,400,000. Reported amounts are not federal obligations.

Phases: Phase II, Phase I

Agencies: Department of Agriculture

Agency intelligence

Department of Agriculture

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.