SBIR/STTR Research Award

A High Voltage Fast Switching Power Module for Active Control of Magnetic Fields and Edge Plasma Currents in Fusion Validation Platforms

Award identifier 1212c5e31028484b24f653b1b880c8abca61d519a13c7b09b37504f0510a6b42Awarding agency Department of Energy

Award amount

$999,891

Program and phase

SBIR · Phase II

Award year

2017

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Energy
Branch
Not reported
Recipient company
EAGLE HARBOR TECHNOLOGIES, INC.
Proposal award date
2017-07-31
Contract end date
2019-07-30
UEI
Z579UK5DQ1W4
Solicitation number
DE-FOA-0001646
Topic code
21d

Research abstract

Fast, reliable, real-time control of plasma is critical to the success of magnetic fusion science and is thought to be required for successful deployment of future power producing reactors. The development of efficient and robust solid-state switches for power systems for fast control of large inductance magnetic field coils, pulsed and/or modulated auxiliary radio frequency (RF) heating, neutral beam injection (NBI), and plasma injection systems is critically important. For example, the Lithium Tokamak Experiment (LTX) at Princeton University will use a high-power magnetron for localized electron heating. This tube requires short, high voltage conditioning pulses prior to the longer main pulse. Eagle Harbor Technologies (EHT) is proposing to design, construct, and test a high voltage (> 35 kV) switch that is compatible with both SiC MOSFETs and IGBTs. EHT will leverage the proprietary gate drive technology previously developed with the support of a DOE FES SBIR. This switch will be used as the basis of a demonstration power supply to drive the pulsed magnetron at LTX in a challenging environment. During the Phase I program, EHT developed two high voltage switch modules: one with isolated power gate drive and a second with inductively coupled gate drive. These switches were tested at 15 kV and up to 300 A at switching frequencies up to 500 kHz for 10 ms bursts. Robust switching was demonstrated for both IGBTs and SiC MOSFETs. In the Phase II program, EHT plans to continue the development of these HV switches based on the success of the Phase I program. EHT will develop a higher voltage switch (> 35 kV) that will be suitable for high pulsed and average power applications. EHT will work with LTX to utilize these switches to design, build, and test a pulsed magnetron driver that will be delivered to LTX before the completion of the program. This demonstration experiment will provide valuable application-based data of the high voltage switch power supply operating in a challenging environment of a fusion science experiment. The commercialization of a robust, high power, high voltage switch module would eliminate the challenges and complexity of other researchers developing a solid-state high voltage switch, while allowing users to take advantage of the latest efficiency developments in solid-state switching technology. Beyond fusion science, applications include fast HV pulses for high power RF production, fast capacitor charging systems, atmospheric plasma production and magnetic and strip-line kickers for linear accelerators. Broader markets include large particle accelerators, medical devices including particle accelerators for cancer therapies, semiconductor manufacturing, and defense applications. EHT has been working with several customers in each of these areas and continued development of the HV switch technology under this DOE SBIR program will greatly increase our ability to produce products that will support these applications.

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Awards with the same topic code

Verified by an exact topic code match. This is not a text-similarity match.

Research funding history

39 SBIR/STTR records share this UEI (2007–2025). Reported award amounts total $17,066,835. Reported amounts are not federal obligations.

Phases: Phase I, Phase II

Agencies: Department of Energy, Department of Defense, National Aeronautics and Space Administration

Agency intelligence

Department of Energy

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.