SBIR/STTR Research Award

Using a Plasma Fuel Reformer to Extend Combustion Lean Limits

Award identifier 7d36116d5122750e5cf39b14ee19f41e5e95cd9311bc2eb5bad1cc01c5c363e1Awarding agency Department of Energy

Award amount

$149,806

Program and phase

SBIR · Phase I

Award year

2017

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Energy
Branch
Not reported
Recipient company
INENTEC, INC.
Proposal award date
2017-06-12
Contract end date
2018-06-11
UEI
EM83LKL67ML4
Solicitation number
DE-FOA-0001619
Topic code
22c

Research abstract

InEnTec will develop a low temperature plasma reformer to extend combustion lean flammability limits. Improved power generation flexibility is one of the main requirements to increase the amount of renewables in the electric grid and improve the profitability of power plants reducing electricity costs for everyone. The window of operation of gas turbines used in power generation is limited by the flammability of the air/fuel mixture, known as the lean limit. Extending lean limits allows higher turndown ratios and fast ramp down ratios. Furthermore, extended lean limits can be used to significantly reduce NOx emissions. It has been known that hydrogen addition can be used to extend the lean limit, but practical units have not been commercialized to date. The purpose of this program is to build upon plasma-based reformers that have been found practical for smaller, automotive applications, operating at atmospheric pressure. The plasma reformer to be developed in this program will operate at 13-15 bar, under partial oxidation (rich combustion), and should enable turndown ratios of 10 to 1, and small enough to fit inside a combustor or upstream of one in the fuel line. The plasma reformer will normally be off, wasting no electrical power to run it but the power would turn on when the device (gas turbine, boiler or furnace) needs to go to low load. Phase I will focus mainly on designing and testing the plasmatron device under pressure. In Phase II, in cooperation with MIT, the device will be integrated and tested with a combustor. In Phase III, we will partner with a gas turbine OEM to develop and pilot a full scale commercial gas turbine generator combustion system.

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Awards with the same topic code

Verified by an exact topic code match. This is not a text-similarity match.

Research funding history

2 SBIR/STTR records share this UEI (2017–2018). Reported award amounts total $1,147,099. Reported amounts are not federal obligations.

Phases: Phase II, Phase I

Agencies: Department of Energy

Agency intelligence

Department of Energy

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.