SBIR/STTR Research Award

High-Efficiency Turbine Generator for Instream Electric Power Production

Award identifier 965627565b44684b918a77782c9bcf5350a5e23f27a324cd70ab7e406b8e6c76Awarding agency Department of Energy

Award amount

$150,000

Program and phase

SBIR · Phase I

Award year

2016

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Energy
Branch
Not reported
Recipient company
Magnetic Power Motion
Proposal award date
2016-06-13
Contract end date
2017-03-12
UEI
FLP8EUATM9B6
Solicitation number
DE-FOA-0001417
Topic code
15

Research abstract

Concerns over global warming due to carbon emissions have spurred an interest in such renewable energy alternatives as hydroelectric, wind, solar, geothermal, and biomass. Of all of these, hydroelectric power offers perhaps the greatest potential for supplying a significant portion of our nation's energy needs. To realize this potential, however, this technology needs to expand beyond traditional dam based installations (for which there are relatively few suitable remaining sites) into the vast number of open flow installations potentially available in rivers, canals, tidal streams and open ocean sites. To help promote this expansion, this project will focus on the development of an advanced, vertical axis, hydrokinetic power generator that is significantly more efficient, lighter, smaller, and lower energy cost than current commercial products. Two key features of this design are (1) an active blade control system that provides independent control of blade pitch and (2) a low-profile, low-speed, high-torque electric generator suitable for direct coupling to the turbine (no gearbox). Both systems will use a unique, disk-shape, high performance electromechanical structure that is potentially low cost, compact, light-weight, and very efficient. If successful, this technology will provide many benefits, including high turbine efficiency, high starting torque, less vibration, speed control independent of generator load, and a mechanism to help clear debris caught in the blades. The Phase I effort will develop preliminary designs of this system for several turbine sizes. Performance, size, weight and energy cost attributes will be evaluated, and the technology’s feasibility will be assessed based on comparisons with other hydrokinetic generator products. Assuming feasibility is confirmed, Phase II will be used to construct and test a working prototype system and validate performance expectations. Commercialization of the technology will be pursued following successful validation. Key Words: hydroelectric, hydrokinetic, turbine, actuator, generator

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Research funding history

5 SBIR/STTR records share this UEI (2005–2018). Reported award amounts total $1,120,000. Reported amounts are not federal obligations.

Phases: Phase I, Phase II

Agencies: Department of Defense, Department of Energy

Agency intelligence

Department of Energy

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.