SBIR/STTR Research Award

Waterproof Towed Array Hosewall

Award identifier ceb76c6669d3fd86ff42806d381dbe920d1009e4b9e7fa56a31c560eb60c1feeAwarding agency Department of Defense · Navy

Award amount

$1,474,210

Program and phase

SBIR · Phase II

Award year

2016

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Defense
Branch
Navy
Recipient company
TEXAS RESEARCH INSTITUTE , AUSTIN, INC.
Proposal award date
2016-03-08
Contract end date
2019-03-07
UEI
LM1NWMDNNQ18
Solicitation number
2014.1
Topic code
N141-056

Research abstract

High moisture permeation rates through hosewall materials are a primary failure mode in fat line towed arrays. TRI/Austin Inc. demonstrated the feasibility of reducing water permeation in TPU hosewall designs in Phase I by incorporation of a TPU having a hydrophobic polymeric backbone. These results indicate water permeation can be reduced by a factor of five to ten. TRI/Austin is teaming with a major towed array supplier and the current hose manufacturer with the goal of rapid insertion of developed moisture resistant elastomers into existing/planned arrays. Materials from co-extrusion trials showed the physical and mechanical properties of the laminate hose are very similar to currently used polyether backbone TPU. During Phase II the hosewall materials and processes will be optimized and downselected to a design that will be used for additional scale-up. A pilot-scale production run will be performed to fabricate prototype hose sections for validation testing. Test data from the pilot scale production run will be used to adjust the hosewall design and processing conditions. Qualification tests will be performed on prototype production hose materials. An Operational Test and Evaluation (OT&E) Integration Plan will be developed in preparation for extended operational field performance evaluation aboard a US Navy Submarine.

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Awards with the same topic code

Verified by an exact topic code match. This is not a text-similarity match.

Research funding history

416 SBIR/STTR records share this UEI (1983–2025). Reported award amounts total $140,672,616. Reported amounts are not federal obligations.

Phases: Phase I, Phase II, Phase II – Direct to Phase II

Agencies: Department of Defense, National Aeronautics and Space Administration, Department of Transportation, Department of Commerce, National Science Foundation, Department of Energy

Agency intelligence

Department of Defense

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.